(Important) Special Measures for City Gas Charges

Raw material adjustment unit price for September to November 2024 (usage from August to October 2024) will be deducted by the following discount unit prices under the government's "Electricity and Gas Price Support." Customers are not required to apply for the rate discount.

Discount price (tax included)

September to October 2024

November 2024

17.50 yen/

Cubic meter

10.00 yen/

Cubic meter

  • The discount amount will be calculated by multiplying the gas usage for the applicable month by the discount unit price above.

For a household with a contract type of Kyuden Gas and usage of 23 cubic meters per month, the discount for each month from September to October 2024 will be 402.5 yen (= 17.50 yen/cubic meter x 23 cubic meters), and the discount for November 2024 will be 230 yen (= 10.00 yen/cubic meter x 23 cubic meters).

Electricity and Gas Fee Support Office

Inquiries: 0120-013-305

[Reception hours: 9:00-17:00]

What is the Raw Material Cost Adjustment System?

  • The prices of LNG (liquefied natural gas) and LPG (liquefied petroleum gas), the raw materials for city gas, fluctuate due to factors such as crude oil prices and exchange rates.
  • The raw material cost adjustment system was introduced to quickly reflect these fluctuations in raw material prices in monthly gas bills.

Calculation of adjustment unit fee and Raw material adjustment unit price

Adjustment unit fee

  1. Standard average raw material price

The price will be 85,350 yen per ton.

  1. Average raw material price

The average raw material price is calculated using the following formula based on the quantity and value of imported goods in trade statistics.

Average raw material price = A x 0.9423 + B x 0.0620
A = Average LNG price per ton for each average raw material price calculation period
B = Average LPG price per ton for each average raw material price calculation period

  1. Calculation of adjustment unit fee
  • When the average raw material price per ton is equal to or higher than the standard average raw material price

Adjustment unit fee

=

Base unit charge

+

(Average raw material price - standard average raw material price)

×ばつ

0.081

100

×ばつ

(1 + consumption tax rate)

  • When the average raw material price per ton is less than the standard average raw material price

Adjustment unit fee

=

Base unit charge

+

(Base average raw material price - average raw material price)

×ばつ

0.081

100

×ばつ

(1 + consumption tax rate)

  1. Adjustment unit charges apply

The adjustment unit charge calculated based on the average fuel price for each average fuel price calculation period will be applied to gas used during the adjustment unit charge application period corresponding to that average fuel price calculation period. The adjustment unit charge application period corresponding to each average fuel price calculation period is as follows:

Average raw material price calculation period

Adjustment unit charge application period

From January 1st to March 31st every year

Calculation period for the fee for June of that year

From February 1st to April 30th every year

Calculation period for the fee for July of that year

From March 1st to May 31st every year

Calculation period for the August fee of that year

From April 1st to June 30th every year

Calculation period for the fee for September of that year

From May 1st to July 31st every year

Calculation period for the fee for October of that year

From June 1st to August 31st every year

Calculation period for the fee for November of that year

From July 1st to September 30th every year

Calculation period for the December fee of that year

From August 1st to October 31st every year

Calculation period for January of the following year

From September 1st to November 30th every year

Calculation period for the fee for February of the following year

From October 1st to December 31st every year

Calculation period for the fee for March of the following year

The period from November 1st to January 31st of the following year

Calculation period for April of the following year

The period from December 1st to February 28th of the following year

(If the following year is a leap year, the period ends on February 29 of the following year.)

Calculation period for the fee for May of the following year

Raw material adjustment unit price

  • When the average raw material price per ton is equal to or higher than the standard average raw material price

Raw material adjustment unit price = Adjustment unit price -Base unit charge

  • When the average raw material price per ton is less than the standard average raw material price