Power transmission consignment charge is the amount equivalent to the transmission and distribution network usage fee required to supply electricity to customers, and is a reference value calculated by applying the customer's contract details and electricity usage to the wheeling supply terms and conditions of Kyushu Electric Power Transmission and Distribution Co., Ltd. This page explains how to calculate Power transmission consignment charge for low-voltage customers.
Calculation method for Power transmission consignment charge customers
Low-voltage metered-rate customers can calculate Power transmission consignment charge (Notes 2, 3, 4) by multiplying the amount of electricity used by the average low-voltage Wheeling Charge (Note 1).
Power transmission consignment charge =
Customer's
Electricity usage
[ ]kWh
×ばつ
Low voltage Wheeling Charge
Average unit price
tax included 10 yen 65 sen
- This calculation is based on Kyushu Electric Power Transmission and Distribution Co., Ltd.'s transmission and supply terms and conditions.
- This is a re-posting of the connection transmission service fee (equivalent to the demand side Wheeling Charge) included in the electricity bill, and is a reference value.
- Adjustments for universal service to remote islands are not taken into account.
- This includes Compensation surcharge stipulated by law (0.08 yen including tax included) (Note 5) and Nuclear decommissioning surcharge (0.09 yen including tax included) (Note 6).
- Compensation surcharge is the amount equivalent to the costs that should have been prepared for compensation for nuclear damage before the Fukushima Daiichi Nuclear Power Plant accident.
- Nuclear decommissioning surcharge is the amount equivalent to the cost of smoothly decommissioning a nuclear power plant, in line with the basic energy policy of reducing dependency on nuclear power.
Calculation method for Power transmission consignment charge for flat-rate customers
Please check Power transmission consignment charge (Notes 1, 2, and 3) in the table below according to your contract details.
Contract Type
Classification
Wheeling Charge
Equivalent amount (tax included)
Compensation
Equivalent amount
(tax included) (Note 4)
Facilitating decommissioning
Equivalent amount of contribution
(tax included) (Note 4)
Flat rate lighting
Public Street Lighting Plan A
Agricultural lighting
electric light
Per lamp up to 10W
39 yen 09 sen
0 yen 31 sen
0 yen 35 sen
For one lamp over 10W up to 20W
78 yen 19 sen
0 yen 62 sen
0 yen 70 sen
For one lamp over 20W up to 40W
156 yen 37 sen
1 yen 24 sen
1 yen 40 sen
For one lamp over 40W up to 60W
234 yen 55 sen
1 yen 86 sen
2 yen 10 sen
For one lamp over 60W up to 100W
390 yen 93 sen
3 yen 11 sen
3 yen 50 sen
For each lamp over 100W up to 100W
390 yen 93 sen
3 yen 11 sen
3 yen 50 sen
Small Devices
Per device up to 50VA
116 yen 77 sen
0 yen 93 sen
1 yen 04 sen
For one device over 50VA up to 100VA
233 yen 53 sen
1 yen 86 sen
2 yen 09 sen
For each device over 100VA up to 50VA
116 yen 77 sen
0 yen 93 sen
1 yen 04 sen
Temporary Lighting Plan A
(per day)
When the total capacity is up to 50VA
3 yen 47 sen
0 yen 03 sen
0 yen 03 sen
When the total capacity is over 50VA and up to 100VA
6 yen 93 sen
0 yen 05 sen
0 yen 06 sen
If the total capacity exceeds 100VA and is up to 500VA,
6 yen 93 sen
0 yen 05 sen
0 yen 06 sen
When the total capacity is over 500VA and up to 1kVA
69 yen 34 sen
0 yen 50 sen
0 yen 56 sen
If the total capacity exceeds 1kVA and is up to 3kVA,
69 yen 34 sen
0 yen 50 sen
0 yen 56 sen
Temporary Power Plan
(per day)
For contract power up to 0.5kW
46 yen 93 sen
0 yen 27 sen
0 yen 30 sen
Contract power: from 1kW to 5kW, for every 1kW
93 yen 86 sen
0 yen 53 sen
0 yen 59 sen
Late Night Power A
Per 1contract
1,027 yen 00 sen
8 yen 00 sen
9 yen 00 sen
Agriculture Power Plan B
(per day)
Contract power: 0.5kW
16 yen 89 sen
0 yen 13 sen
0 yen 15 sen
Contract power: 1kW
33 yen 78 sen
0 yen 26 sen
0 yen 30 sen
Contract power: 2kW
67 yen 57 sen
0 yen 53 sen
0 yen 59 sen
Contract power: 3kW
101 yen 34 sen
0 yen 79 sen
0 yen 89 sen
Contract power: 4kW
135 yen 13 sen
1 yen 05 sen
1 yen 18 sen
Contract power: 5kW
168 yen 91 sen
1 yen 32 sen
1 yen 48 sen
- This calculation is based on Kyushu Electric Power Transmission and Distribution Co., Ltd.'s transmission and supply terms and conditions.
- This is a re-posting of the connection transmission service fee (equivalent to the demand side Wheeling Charge) included in the electricity bill, and is a reference value.
- Adjustments for universal service to remote islands are not taken into account.
- Power transmission consignment charge includes Compensation surcharge stipulated by law (Note 5) and Nuclear decommissioning surcharge (Note 6).
- Compensation surcharge is the amount equivalent to the costs that should have been prepared for compensation for nuclear damage before the Fukushima Daiichi Nuclear Power Plant accident.
- Nuclear decommissioning surcharge is the amount equivalent to the cost of smoothly decommissioning a nuclear power plant, in line with the basic energy policy of reducing dependency on nuclear power.