1. Contract details, etc.
(1) Contract Outline
(To be implemented on April 1, 2024)
(Implemented on April 1, 2023)
(Implemented on July 1, 2022)
(For an overview of the system changes accompanying the April 2022 amendment to the Renewable Energy Special Measures Act, please click here.)
(Reference) For information on the amendment to the Renewable Energy Act, please see the Agency for Natural Resources and Energy website here.
2. Registration Procedure
For inquiries regarding grid interconnection, please contact Kyushu Electric Power Transmission and Distribution
3. Application documents
Where to submit your application
If FIT certification is planned
If you have a contract with us for retail purchase (note), and would like to apply for equipment changes, please apply as follows. Please note that applications are only accepted for the addition or reduction of Power generation equipment that does not have a sub-meter installed.
- If you have applied for re-instatement of your purchase contract after April 2017, this will be treated as a transmission and distribution purchase, so please submit the application to the transmission and distribution purchase destination.
- For information on purchasing entities (retail purchase/transmission and distribution purchase), please check the latest "Notice of Purchased power amount."
Grid voltage
Power source type
Where to submit
Renewable energy facilities other than solar power
Contract and Billing Center Reception Group
High voltage/special high voltage
Solar
Renewable energy facilities other than solar power
List of Contract and Billing Center addresses
For applications other than low-voltage solar power, please submit the complete application form by mail to the reception group at your local contract fee center.
Reception desk
location
Kitakyushu Contract and Fee Center
Reception Group
〒802-8524
Kitakyushu City, Kokurakita Ward, Yonemachi 2-3-1
Fukuoka Contract and Fee Center
Reception Group
〒810-0004
2-1-82 Watanabedori, Chuo-ku, Fukuoka City
Saga Contract and Fee Center
Reception Group
〒840-0804
2-3-6 Kannohigashi, Saga City
Nagasaki Contract and Fee Center
Reception Group
〒852-8510
3-19 Shiroyama-cho, Nagasaki City
Oita Contract and Fee Center
Reception Group
〒870-0026
2-3-4 Kanaikecho, Oita City
Kumamoto Contract and Fee Center
Reception Group
〒862-0951
1-6-36 Kamisuizenji, Chuo Ward, Kumamoto City
Miyazaki Contract and Fee Center
Reception Group
〒880-8544
Miyazaki City Tachibanadori Nishi 4-2-23
Kagoshima Contract and Fee Center
Reception Group
〒890-8558
2-6-16 Yojiro, Kagoshima City
- Please call the number of the office that has jurisdiction over the area where you will be using the service.
(1) In the case of an application for low-voltage Power generation equipment that is scheduled to obtain FIT certification
Purchase contract application documents
Required Documents
Changes in Power generation equipment
Name change
Decline
Change account
Application for sales of electricity from renewable energy Power generation equipment [low voltage] (for retail purchase)
(Note 1) This form must also be submitted if you are also installing storage batteries or Power generation equipment other than solar power.
(Note 2) As of October 24, 2018, it is possible to transfer funds to financial institutions that are members of the National Bank Cooperative Association. (Please check the application form for details.)
○しろまる
○しろまる
○しろまる
Additional documents for applications regarding sales of electricity from renewable energy sources
(Note 1) Please submit this form when adding or removing Power generation equipment or installing multiple inverters.
(Note 2) Please submit this form if you are also installing Power generation equipment other than storage batteries or solar power generation equipment.
○しろまる
Technical study materials
If there are any changes to Power generation equipment that have concluded a purchase agreement with our company, you will need to submit an application for technical review to our company.
If you are building or expanding Power generation equipment with low voltage of 10kW or above, you will need to submit a "Consent Form for application for power supply contract taking into account non-farm type connection".
Application documents for supply contract
Required Documents
Changes in Power generation equipment
Name change
Decline
Change account
- "Electricity Use Application Form and Customer Equipment Construction Design Drawings (Completion Notification) and Construction Certificate"
- "Attached wiring diagram"
(Note) You will need to submit the application documents for the supply contract together with the application documents for the electricity supply contract.
○しろまる
others
Required Documents
Changes in Power generation equipment
Name change
Decline
Change account
Business succession notification form
(Note) Please also submit the change approval notice or a copy of the notification form with the acceptance seal of the Bureau of Economy, Trade and Industry.
○しろまる
○しろまる
When changing the name
When applying for a name change, please submit the following documents by mail to the reception operations group at your local contract fee center.
- Application for sales of electricity from renewable energy Power generation equipment [low voltage] (for retail purchase)
- As a document to prove that the change procedure has been carried out, the change approval notice must be a copy of the notification form with the acceptance seal of the Bureau of Economy, Trade and Industry.
- Business succession notification form
In the case of re-start (moving to a house with Power generation equipment installed and using electricity)
- After we receive your application to start using electricity, please submit the following documents to the reception group at your local contract fee center by mail to conclude the solar power purchase contract.
- A copy of the change approval notice or notification form with the acceptance seal of the Bureau of Economy, Trade and Industry affixed as a document to prove that the change procedure has been carried out.
(For those who installed a measuring device themselves before March 2008)
- For inquiries, please contact the sales office in your area.
(2) In the case of applications for high-voltage or extra-high-voltage Power generation equipment that are scheduled to obtain FIT certification
If there are any changes to Power generation equipment that have concluded a purchase agreement with our company, you will need to submit an application for technical review to our company.
Advance consultation (optional)
Connection Considerations
- When applying for high voltage, please be sure to check the "Checklist of items to be confirmed when applying", which lists points to note when applying, and submit one copy of the checklist with all boxes checked along with the application form.
Required Documents
For the application form for connection consideration, please refer to the Contract Guidelines, Application Procedures, Technical Standards, etc. page.
When constructing new or Power generation equipment at high or extra-high voltage, you will need to submit a "Consent Form for application for electricity supply contract taking into account non-farm type connection."
Application for power supply contract based on "non-farm type connection" [Agreement form]
Submit to our company
Each contract fee center
Connection Considerations
Required Documents
For the form regarding the connection contract, please refer to the Contract Guidelines, Application Guidelines, Technical Standards, etc. page.
Submit to our company
Each contract fee center
Statement of intent
Required Documents
Electricity Use Application Form
Application form for selling electricity from renewable energy sources [high voltage/extra high voltage] (for retail purchase)
Regarding the format of the statement of intent, Contract Guidelines, Application Guidelines, Technical Standards, etc.
Notification of change to business plan approval (copy)
(Note) After concluding the interconnection contract, please complete the "change approval" procedure promptly and submit a copy of the Change Approval Notice to the Reception Operations Group at your respective Contract and Rate Center.
Submit to our company
Each contract fee center
others
Required Documents
Changes in Power generation equipment
Name change
Decline
Change account
Business succession notification form
(Note) Please also submit the change approval notice or a copy of the notification form with the acceptance seal of the Bureau of Economy, Trade and Industry.
○しろまる
○しろまる
When changing the name
When applying for a name change, please submit the following documents by mail to the reception operations group at your local contract fee center.
- Application form for selling electricity generated from renewable energy sources [high voltage/extra high voltage] (for retail purchase)
- As a document to prove that the change procedure has been carried out, the change approval notice must be a copy of the notification form with the acceptance seal of the Bureau of Economy, Trade and Industry.
- Business succession notification form
remarks
Please submit your application by post (registered mail or letter pack).
If you are not planning to obtain FIT certification
If you would like to sell electricity to us without planning to obtain FIT certification, please contact us at the number of the office that has jurisdiction over your location.
- If you have no plans to obtain FIT certification and have no intention of selling electricity, please contact the electricity distribution company contact information listed below.
- If you wish to sell electricity to our retail division without planning to obtain FIT certification, please contact the Reception Group at your local Contract and Rate Center.
(3) In the case of an application for low-voltage Power generation equipment without plans to obtain FIT certification
If you are building new Power generation equipment that have signed a purchase agreement with us, you will need to submit an application for technical review to us.
- When applying, please be sure to check the "Checklist of items to be checked when applying", which lists points to note when applying. Please submit one copy of the checklist with all boxes checked together with your application form.
Required Documents
New construction or changes to Power generation equipment
Name change
Decline
Change account
[Non-FIT] Application for selling electricity from renewable energy Power generation equipment
(Note 1) This form must also be submitted if you are also installing storage batteries or Power generation equipment other than solar power.
(Note 2) As of October 24, 2018, it is possible to transfer funds to financial institutions that are members of the National Bank Cooperative Association. (Please check the application form for details.)
○しろまる
○しろまる
○しろまる
Additional documents for applications regarding sales of electricity from renewable energy sources
(Note 1) Please submit this form when increasing or decreasing the size of Power generation equipment, when building new non-FIT facilities, or when installing multiple inverters.
(Note 2) Please submit this form if you are also installing Power generation equipment other than storage batteries or solar power generation equipment.
○しろまる
Technical study materials
If you are building new Power generation equipment that have signed a purchase agreement with us, you will need to submit an application for technical review to us.
Required Documents
For the form regarding the connection contract, please refer to the Contract Guidelines, Application Guidelines, Technical Standards, etc. page.
Submit to our company
Each contract fee center
Application documents for supply contract
Required Documents
New construction or changes to Power generation equipment
Name change
Decline
Change account
- "Electricity Use Application Form and Customer Equipment Construction Design Drawings (Completion Notification) and Construction Certificate"
- "Attached wiring diagram"
(Note) You will need to submit the application documents for the supply contract together with the application documents for the electricity supply contract.
○しろまる
others
Required Documents
New construction or changes to Power generation equipment
Name change
Decline
Change account
(Note) Please submit this when withdrawing your application.
○しろまる
In the case of re-start (moving to a house with Power generation equipment installed and using electricity)
- After we receive your application to start using electricity, please submit the following documents to the reception group at your local contract fee center by mail to conclude the solar power purchase contract.
- A copy of the change approval notice or notification form with the acceptance seal of the Bureau of Economy, Trade and Industry affixed as a document to prove that the change procedure has been carried out.
(For those who installed a measuring device themselves before March 2008)
- For inquiries, please contact the sales office in your area.
(4) In the case of applications for high-voltage or extra-high-voltage Power generation equipment without plans to obtain FIT certification
Connection Considerations
- When applying for high voltage, please be sure to check the "Checklist of items to be confirmed when applying", which lists points to note when applying, and submit one copy of the checklist with all boxes checked along with the application form.
Required Documents
For the application form for connection consideration, please refer to the Contract Guidelines, Application Procedures, Technical Standards, etc. page.
Submit to our company
Each contract fee center
others
Required Documents
Submit to our company
List of submission destinations
(Note) This is the same as "Where to submit your application."
remarks
Please submit your application by post (registered mail or letter pack).
Submit to our company
Each contract fee center
Reception Group
Connection contract
Required Documents
For the form regarding the connection contract, please refer to the Contract Guidelines, Application Guidelines, Technical Standards, etc. page.
Submit to our company
Each contract fee center
Statement of intent
Required Documents
Electricity Use Application Form
[Non-FIT] Application for selling electricity from renewable energy Power generation equipment [high voltage/extra high voltage] (for retail purchase)
Regarding the format of the statement of intent, Contract Guidelines, Application Guidelines, Technical Standards, etc. page
Notification of change to business plan approval (copy)
(Note) After concluding the interconnection contract, please complete the "change approval" procedure promptly and submit a copy of the Change Approval Notice to the Reception Operations Group at your respective Contract and Rate Center.
Submit to our company
Each contract fee center
others
Required Documents
New construction or changes to Power generation equipment
Name change
Decline
Change account
(Note) Please submit this when withdrawing your application.
○しろまる
remarks
Please submit your application by post (registered mail or letter pack).
(5) Battery interconnection
Customers who have signed a purchase agreement with us and wish to install solar power and storage batteries together should submit an application form to the reception operations group at their respective contract and fee center.
Required Documents
For application form, please refer to the Contract Guidelines, Application Procedures, Technical Standards, etc. page.
(Note) When installing a storage battery, you will need to apply for a supply contract (facility change) in addition to applying for grid connection.
Submit to our company
Low voltage: Easy Net
High voltage/special high voltage: Reception group of each contract fee center
(6) Interconnection of Power generation equipment with reverse power flow of less than 50 kW
For high-voltage interconnections where the reverse power flow from Power generation equipment is less than 50 kW, please use the following form.
In addition, in the case of "extra-high voltage interconnection" or "reverse power flow of 50 kW or more," connection consideration is required, so please submit a connection consideration application form to the reception operations group at your respective contract and rate center.
Application documents (technical review document format)
Required Documents
For application form, please refer to the Contract Guidelines, Application Procedures, Technical Standards, etc. page.
Submit to our company
Each contract fee center