Plant-related Parameters

Plant-related data is made available.

Real-time Data

Temperature of
reactor pressure vessel
Unit 1 Unit 2 Unit 3
Temperature in
primary containment vessel
Unit 1 Unit 2 Unit 3
Radiation levels in
primary containment vessel
Unit 1 Unit 2 Unit 3
Hydrogen concentration in
primary containment vessel
Unit 1 Unit 2 Unit 3

Main monitoring parameters can be confirmed as water injection flow rate to the reactors is reduced.

  • Water injection flow rate to reactor, containment vessel gas control system dust monitor Hourly data (CSV), Six-hourly data (CSV)
  • Temperature in containment vessel, water injection flow rate to reactor Temperature in primary containment vessel

Plant Data

Plant-related Parameters

Summary Table Summary Table

Hourly/Six-hourly data (CSV)

Hourly Unit 1 Unit 2 Unit 3 Unit 5,6
Six-hourly Unit 1 Unit 2 Unit 3,4

Updated 2018年12月25日 (For Reference) Installed position of primary containment vessel water level gauges (53.5KB)

Main monitoring parameters can be confirmed as water injection flow rate to the reactors is reduced.

  • Water injection flow rate to reactor, containment vessel gas control system dust monitor Hourly data (CSV), Six-hourly data (CSV)
  • Other monitoring parameters (temperature at upper part of reactor pressure vessel, containment vessel pressure, containment vessel water level) Six-hourly data (CSV)

Notice

  • There was a name change and an addition on "Unit 3,4 six-hourly data (CSV)".
    The name of "Water level inside PCV" has been changed to "Water level inside PCV (bubbler water level)".
    There was an addition of "Water level inside PCV (Water level converted from S/C pressure)".
  • Display of water level inside PCV in "Unit 3,4 six-hourly data (CSV)" has been changed to the water level gauge reading from 5:00 on September 1, 2025.
  • As the water level gauge in the Unit 6 reactor was updated, the water level has been recorded by a digital gauge instead of an analog gauge since July 8, 2025.
  • Following change was made to "Unit 2 six-hourly data (CSV)" on November 11, 2024 due to installation of the Unit 2 fuel removal work platform:
    Name of "Dust concentrations in the exhaust gas from the reactor building" was changed to "Dust concentrations in the exhaust gas from the reactor building and the fuel removal work platform."
  • ""Due to modification of Centralization Remote Monitoring System at the Unit 1-4, following changes have been made in Unit 1-4 "six-hourly data (CSV)":
    The name of the plant data "Airborne radioactive concentration (dust) at the nitrogen gas injection system to PCV" has been changed to "Airborne radioactive concentration (dust) (A) at the nitrogen gas injection system to PCV".
    The name of the plant data "Airborne radioactive concentration (long half-life noble gas) at the nitrogen gas injection system to PCV" has been changed to "Airborne radioactive concentration (long half-life noble gas) (A) at the nitrogen gas injection system to PCV".
    Plant data "Airborne radioactive concentration (dust) (B) at the nitrogen gas injection system to PCV" and "Airborne radioactive concentration (long half-life noble gas) (B) at the nitrogen gas injection system to PCV" have been added.
  • Gaps in data may occur due to equipment maintenance inspections, etc.
  • Steam (mist) may occur at the upper part of the reactor building due to outside temperature and humidity conditions.

Archives and History of Changes, Etc.

  1. HOME
  2. Our Responsibilities to Fukushima
  3. Fukushima Daiichi decommissioning project
  4. Data
  5. Plant-related Parameters

Tokyo Electric Power Company Holdings

© Tokyo Electric Power Company Holdings, Inc.

AltStyle によって変換されたページ (->オリジナル) /