TEPCO Tokyo Electric Power Company Holdings

Caution
Beware of Fake, Phishing and Spoofing Emails Please find the details here.
Caution
Beware of Fake, Phishing and Spoofing Emails Please find the details here.

Status of the Decommissioning Work

What Is the Decommissioning Work

The decommissioning work at the Fukushima Daiichi Nuclear Power Station, being carried out based on the “Mid-and-Long-Term Roadmap towards the Decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Station,” consists of measures to deal with contaminated water, removal of fuel rod assemblies from spent fuel pools, retrieval of fuel debris, measures to deal with waste materials, and other operations.

  • Approach to Decommissioning

    • A risk mitigation plan is being implemented with top priority to ensuring safety.
    • The decommissioning is being carried out in full transparency, to ensure public understanding.
    • The work will undergo continued review, responding to new situations that may arise.
    • It will be carried out in cooperation with government and other related agencies.

Main Initiatives

  • Contaminated Water Measures

    For the sake of stable control of groundwater, multilayer measures are being taken to deal with contaminated water, in line with the three fundamental policies of (1) removing contamination sources, (2) keeping water away from contamination sources, and (3) not allowing contaminated water to leak.

  • Removal of Fuel Rod Assemblies

    Preparations are being made to remove fuel assemblies from spent fuel pools in the reactor buildings.

  • Retrieval of Fuel Debris

    Melted fuel in Units 1 to 3 is being cooled stably and kept in cold shutdown state. Surveys are being carried out inside the containment vessels on the way to retrieval of fuel debris, fuel that has melted down inside the reactors.

  • [画像:Measures to Deal with Waste Materials]

    Measures to Deal with Waste Materials

    Measures to Deal with Waste Materials

  • Work and Labor Environment

    We are working to mitigate risks, including those from radioactive materials, and to improve the labor environment, giving highest priority to ensuring the safety of people in the local communities, workers and employees, and the surrounding environment.

  • Research and Development

    Research and development efforts are proceeding in such areas as use of remote robots for decommissioning work, drawing on the collective expertise of research institutions, corporations, and others in Japan and overseas.

  • Efforts to Improve Safety

    Initiatives of many different kinds are being advanced to ensure the decommissioning is carried out safely and effectively.

  1. HOME
  2. Our Responsibilities to Fukushima
  3. Fukushima Daiichi decommissioning project
  4. Status of the Decommissioning Work

Tokyo Electric Power Company Holdings

© Tokyo Electric Power Company Holdings, Inc.

AltStyle によって変換されたページ (->オリジナル) /