• Bridge: Bill Emerson Memorial Bridge
• Structure ID: NBI 000002003632986
• City: Cape Girardeau
• State: Missouri
• Country: USA
• Carries: IL-164/MO-74
• Crosses: Mississippi River
• Date Opened: December 13, 2003
• Total Length: 3,955 Feet
• Longest Span: 1,149 Feet
• Tower Height: 330 Feet
• Deck Width: 94 Feet
• Number Of Lanes: 4
• Number Of Spans: 1
• Height Above Water: 60 Feet
• Traffic Count: 10,600 (2003)
While the new Bill Emerson Memorial Bridge is an engineering wonder that has been widely praised, it has just as widely been criticized as being a classic example of pork barrel spending. Southern Illinois is mostly swamp and largely uninhabited, yet a bridge large enough for a 6-lane highway was constructed. At the same time, many New York City area bridges are struggling to find funding just to keep ahead of falling apart, let along build a six lane wide bridge for such a major highway as I-287.

Building cable stayed bridges is pretty much a cookie-cutter science these days. As a result, the bridge was built with few problems. The biggest issue was fissures found in the bedrock under one of the towers. The original contractor was in over their heads, and a new contractor had to be brought in to solve the problem and complete the bridge. The solution to the fissure problem was to jet-grout concrete into the cracks. Later, a major flood threatened progress. The contractor feared that the caisson on the Missouri side would be overtopped and flood. To beat the flood, they poured 4,700 cubic yards of concrete in around the clock shifts. As it turned out, the concrete was complete before the river flooded. Had they not pushed the pour, it would have set the project back more than two months to wait for the river to go back down and to pump out the caisson.

The road deck is made out of a concrete mixed with silica fume, made from silicon metal. This is supposed to give the deck a 50 year lifespan.

Bill Emerson served in the House of Representatives from 1980 until 1996, when he lost his battle with lung cancer. Emerson served on the Public Works and Transportation committees, and was instrumental in getting this bridge approved.

This bridge replaced an older multi-span truss bridge, which was closed and removed once the new cable stayed bridge opened. As the main spans of the old bridge were imploded, two more spans of the bridge unexpectedly collapsed and fell into the Mississippi River.


[画像:Bill Emerson Memorial Bridge]
[画像:Bill Emerson Memorial Bridge]
[画像:Bill Emerson Memorial Bridge]
[画像:Bill Emerson Memorial Bridge]
[画像:Bill Emerson Memorial Bridge]

Made With Macintosh
Authored by John A. Weeks III, Copyright © 1996—2016, all rights reserved.
For further information, contact: john@johnweeks.com

AltStyle によって変換されたページ (->オリジナル) /