Handouts at Press Conference

Handouts at Press Conference

2025

Aug 28, 2025
Non-destructive analysis results of the second fuel debris sample (Follow-up report) and fractionation results
Aug 28, 2025
Fukushima Daiichi Nuclear Power Station Unit3 PCV Internal Investigation(non-submerged area) using a Micro-drone
Aug 28, 2025
Fukushima Daiichi Nuclear Power Station Unit 2 Progress of Fuel Removal from Spent Fuel Pool
Aug 28, 2025
ALPS Treated Water Discharge Status Update
Aug 28, 2025
Fukushima Daiichi Nuclear Power Station Unit 2 PCV Internal Investigation / Status of Fuel Debris Trial Retrieval
Aug 25, 2025
Fukushima Daiichi Nuclear Power Station Completion of the Third Discharge of ALPS Treated Water in FY2025
Aug 18, 2025
Fukushima Daichi Nuclear Power Station Unit 3 Commencement of Personnel Access Lock Room Investigation
Aug 7, 2025
Fukushima Daiichi Nuclear Power Station Commencement of the Discharge of ALPS Treated Water into the Sea (Third Discharge in FY2025)
Aug 5, 2025
Fukushima Daiichi Nuclear Power Station Analysis Results of ALPS Treated Water Sampled from the Measurement/Confirmation Facility Tank Group A and the Scheduled Date of the Commencement of the Third Discharge in FY2025
Aug 4, 2025
Fukushima Daiichi Nuclear Power Station Completion of the Second Discharge of ALPS Treated Water in FY2025
Aug 4, 2025
Fukushima Daiichi Nuclear Power Station Reevaluation of Nuclides Targeted for Measurement/Assessment during FY2025
Jul 31, 2025
Analysis results of the first fuel debris sample
Jul 31, 2025
ALPS Treated Water Discharge Status Update
Jul 31, 2025
Fukushima Daiichi Nuclear Power Station Unit2 PCV Internal Investigation/Status of Fuel Debris Trial Retrieval
Jul 14, 2025
Fukushima Daiichi Nuclear Power Station Commencement of the discharge of ALPS treated water into the sea (Second discharge in FY2025)
Jul 10, 2025
Fukushima Daiichi Nuclear Power Station Analysis Results of ALPS Treated Water Sampled from the Measurement/Confirmation Facility Tank Group C and the Scheduled Date of the Commencement of the Second Discharge in FY2025
Jul 3, 2025
ALPS Treated Water Discharge Status Update
Jul 3, 2025
Fukushima Daiichi Nuclear Power Station Unit 1 Progress of Fuel Removal from Spent Fuel Pool
Jul 3, 2025
Fukushima Daiichi Nuclear Power Station Unit 2 Progress of Fuel Removal from Spent Fuel Pool
Jun 30, 2025
Fukushima Daiichi Nuclear Power Station Status of Unit 1 Large Cover Installation Crane
Jun 30, 2025
Fukushima Daiichi Nuclear Power Station Completion of installing an additional cover over the Unit 1 spent fuel pool gate
Jun 26, 2025
Fukushima Daiichi Nuclear Power Station Installing an additional cover over the Unit 1 spent fuel pool gate
Jun 23, 2025
Fukushima Daiichi Nuclear Power Station Unit 1 Large Cover Installation: Inability to Lower a Main Hook of a 1,250 Ton Crawler Crane
Jun 12, 2025
Fukushima Daiichi Nuclear Power Station The high flow rate alarm occurred at the liner drain of the spent fuel common pool (occurred on June 10, 2025)
Jun 12, 2025
Fukushima Daiichi Nuclear Power Station Measurement/confirmation tank Group B inspection results (corrosion on the manhole)
Jun 12, 2025
Fukushima Daiichi Nuclear Power Station Cause and a direction of countermeasures of the fire that occurred in the periodic inspection equipment storage warehouse B (site of horizontal tanks dismantling)
Apr 28, 2025
Fukushima Daiichi Nuclear Power Station Completion of the First Discharge of ALPS Treated Water in FY2025
Apr 25, 2025
Fukushima Daiichi Nuclear Power Station Second Fuel Debris Trial Retrieval from Unit 2 Completion of Transportation of the Sampled Fuel Debris to Off-site Analysis Facilities
Apr 24, 2025
Fukushima Daiichi Nuclear Power Station Measurement Results Taken in Preparation to Transport the Fuel Debris Sampled During the Second Fuel Debris Trial Retrieval from Unit 2 to Off-site Analysis Facility
Apr 24, 2025
Fukushima Daiichi Nuclear Power Station Unit 2 PCV Internal Investigation/Status of Fuel Debris Trial Retrieval
Apr 24, 2025
ALPS Treated Water Discharge Status Update
Apr 23, 2025
Fukushima Daiichi Nuclear Power Station Completion of Second Fuel Debris Trial Retrieval from Unit 2
Apr 22, 2025
Fukushima Daiichi Nuclear Power Station Status of Second Fuel Debris Trial Retrieval from Unit 2 (Placement of Sample in Transportation Box)
Apr 21, 2025
Fukushima Daiichi Nuclear Power Station Status of the Second Fuel Debris Trial Retrieval from Unit 2 (Fuel debris dose measurement)
Apr 17, 2025
Fukushima Daiichi Nuclear Power Station Completion of Fuel Debris Grasping Work during the Second Fuel Debris Trial Retrieval from Unit 2
Apr 15, 2025
Fukushima Daiichi Nuclear Power Station Status of the Second Fuel Debris Trial Retrieval from Unit 2
Apr 10, 2025
Fukushima Daiichi Nuclear Power Station Replacing the Cameras/Improved End Jig in Preparation for the Second Fuel Debris Trial Retrieval from Unit 2
Apr 10, 2025
Fukushima Daiichi Nuclear Power Station Commencement of the discharge of ALPS treated water into the sea (first discharge in FY2025)
Apr 8, 2025
Fukushima Daiichi Nuclear Power Station Analysis Results of ALPS Treated Water Sampled from the Measurement/Confirmation Facility Tank Group A and the Scheduled Date of the Commencement of the First Discharge in FY2025
Apr 3, 2025
Fukushima Daiichi Nuclear Power Station Replacing the Cameras/End Jig in Preparation for the Second Fuel Debris Trial Retrieval from Unit 2
Mar 31, 2025
Fukushima Daiichi Nuclear Power Station Completion of the Seventh Discharge of ALPS Treated Water in FY2024
Mar 27, 2025
Fukushima Daiichi Nuclear Power Station Progress with Preparations for Unit 1 Fuel Removal from the Spent Fuel Pool
Mar 27, 2025
Fukushima Daiichi Nuclear Power Station Unit 2 Progress of Fuel Removal from Spent Pools
Mar 27, 2025
Fukushima Daiichi Nuclear Power Station Unit 2 PCV Internal Investigation/ Status of Fuel Debris Trial Retrieval
Mar 27, 2025
ALPS Treated Water Discharge Status Update and FY2025 ALPS Treated Water Discharge Plan
Mar 27, 2025
Fukushima Daiichi Nuclear Power Station Status of Progress with Marine Organisms Rearing Tests and Completion of the Rearing Tests
Mar 19, 2025
Fukushima Daiichi Nuclear Power Station Status of preparations for the second fuel debris trial retrieval from Unit 2
Mar 19, 2025
Fukushima Daiichi Nuclear Power Station Measures Pertaining to the Fish inside the Port (Seawater and Seabed Soil Investigation Results from inside the Port)
Mar 14, 2025
Fukushima Daiichi Nuclear Power Station Completion of Runway Girder Installation for the Fuel Removal from the Unit 2 Spent Fuel Pool
Mar 12, 2025
Fukushima Daiichi Nuclear Power Station seventh discharge in FY2024 Commencement of the Second stage of the discharge of ALPS treated water into the sea (discharge in two-stage)
Mar 12, 2025
Fukushima Daiichi Nuclear Power Station seventh discharge in FY2024 Analysis Results of the First stage of the discharge of ALPS treated water into the sea (discharge in two-stage)
Mar 10, 2025
Fukushima Daiichi Nuclear Power Station seventh discharge in FY2024 Commencement of the First stage of the discharge of ALPS treated water into the sea (discharge in two-stage)
Mar 6, 2025
Fukushima Daiichi Nuclear Power Station Analysis Results of ALPS Treated Water Sampled from the Measurement/Confirmation Facility Tank Group C and the Scheduled Date of the Commencement of the Seventh Discharge in FY2024
Mar 4, 2025
Fukushima Daiichi Nuclear Power Station Progress with the dismantling of the J9 area tanks

2024

Nov 28, 2024
Causes and Countermeasures for the Decrease in Water Level of the Unit 2 SFP Skimmer Surge Tank and Going Forward Measures
Nov 28, 2024
Results of an In-House Investigation Performed in the Vicinity of the Unit 1 X-25 Penetration to Confirm Accessibility
Nov 28, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 PCV Internal Investigation/Status of Fuel Debris Trial Retrieval
Nov 28, 2024
ALPS Treated Water Discharge Status Update
Nov 28, 2024
K4 Area Tank Inspection Status
Nov 25, 2024
Fukushima Daiichi Nuclear Power Station Inspection Results of Measurement/Confirmation Facility Tank Group C
Nov 21, 2024
Fukushima Daiichi Nuclear Power Station Completion of the Investigation into the Cause of the Unit 2 SFP Primary Cooling System Pipe Rupture
Nov 18, 2024
Fukushima Daiichi Nuclear Power Station Unit 1 Pre-checks for an investigation of vicinity of the X-25 penetration
Nov 12, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 Fuel Debris Trial Retrieval Completion of Transportation of the Sampled Fuel Debris to Off-site Analysis Facilities
Nov 7, 2024
Fukushima Daiichi Nuclear Power Station Completion of fuel debris trial retrieval from Unit 2
Nov 5, 2024
Fukushima Daiichi Nuclear Power Station Completion of the Sixth Discharge of ALPS Treated Water in FY2024
Oct 31, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 PCV Internal Investigation/Status of Fuel Debris Trial Retrieval
Oct 31, 2024
Analysis of fuel debris sampled from Unit 2 on a trial basis
Oct 31, 2024
ALPS Treated Water Discharge Status Update
Oct 30, 2024
Fukushima Daiichi Nuclear Power Station Recommencement of the Unit 2 Fuel Debris Trial Retrieval (completion of fuel debris grasping work)
Oct 28, 2024
Fukushima Daiichi Nuclear Power Station Recommencement of the Unit 2 fuel debris trial retrieval
Oct 21, 2024
Fukushima Daiichi Nuclear Power Station Completion of the replacement of cameras used for Unit 2 fuel debris trial retrieval work
Oct 17, 2024
Fukushima Daiichi Nuclear Power Station Commencement of the discharge of ALPS treated water into the sea (sixth discharge in FY2024)
Oct 15, 2024
Fukushima Daiichi Nuclear Power Station Analysis Results of ALPS Treated Water Sampled from the Measurement/Confirmation Facility Tank Group B and the Scheduled Date of the Commencement of the Sixth Discharge in FY2024
Oct 15, 2024
Fukushima Daiichi Nuclear Power Station Completion of the Fifth Discharge of ALPS Treated Water in FY2024
Oct 7, 2024
Fukushima Daiichi Nuclear Power Station Replacing the Cameras for the Unit 2 Fuel Debris Trial Retrieval
Oct 3, 2024
Results of the investigation to identify the location of leaks in conjunction the Unit 2 Spent Fuel Pool Skimmer Surge Tank Water Level Decrease
Sep 30, 2024
Fukushima Daiichi Nuclear Power Station Status of investigation into camera malfunctions during trial fuel debris retrieval at Unit 2
Sep 26, 2024
Fukushima Daiichi Nuclear Power Station Commencement of the discharge of ALPS treated water into the sea (fifth discharge in FY2024)
Sep 26, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 PCV Internal Investigation/Preparation Status of Fuel Debris Trial Retrieval
Sep 26, 2024
ALPS Treated Water Discharge Status Update
Sep 24, 2024
Fukushima Daiichi Nuclear Power Station Status of the Investigation into Camera Malfunctions during the Trial Retrieval of Fuel Debris at Unit 2
Sep 24, 2024
Fukushima Daiichi Nuclear Power Station Analysis Results of ALPS Treated Water Sampled from the Measurement/Confirmation Facility Tank Group A And the Scheduled Date of the Commencement of the Fifth Discharge in FY2024
Sep 24, 2024
Fukushima Daiichi Nuclear Power Station Commencement of marine organism rearing tests using water that has been discharged into the environment
Sep 19, 2024
Fukushima Daiichi Nuclear Power Station The status of Unit 2 fuel debris trial retrieval
Sep 10, 2024
Fukushima Daiichi Nuclear Power Station Commencement of the Unit 2 fuel debris trial retrieval
Sep 9, 2024
Fukushima Daiichi Nuclear Power Station Completion of the correction of the order of push pipes for recommencement of Unit 2 fuel debris trial retrieval
Sep 5, 2024
Causes and Countermeasures for Suspension of Unit 2 PCV Fuel Debris Trial Retrieval
Sep 4, 2024
Creation of Fukushima Daiichi Nuclear Power Station "Fuel Debris Portal Site"
Aug 29, 2024
Plans to perform internal investigations of the Unit 1 and 3 PCVs
Aug 29, 2024
ALPS Treated Water Discharge Status Update
Aug 26, 2024
Fukushima Daiichi Nuclear Power Station Completion of the Fourth Discharge of ALPS Treated Water in FY2024
Aug 22, 2024
Fukushima Daiichi Nuclear Power Station Status of the Unit 2 PCV Internal Investigation and Fuel Debris Trial Retrieval
Aug 19, 2024
Fukushima Daiichi Nuclear Power Station Addressing the Decrease in Water Level in the Unit 2 Spent Fuel Pool Skimmer Surge Tank
Aug 13, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 Spent Fuel Pool Skimmer Surge Tank Water Level Decrease
Aug 7, 2024
Fukushima Daiichi Nuclear Power Station Commencement of the discharge of ALPS treated water into the sea (fourth discharge in FY2024) <Corrected>
Aug 5, 2024
Fukushima Daiichi Nuclear Power Station Analysis Results of ALPS Treated Water Sampled from the Measurement/Confirmation Facility Tank Group C And the Scheduled Date of the Commencement of the Fourth Discharge in FY2024
Aug 1, 2024
Fukushima Daiichi Nuclear Power Station Results from the FY2023 investigative analysis of the six nuclides targeted for monitoring in contaminated water prior to ALPS treatment
Jul 25, 2024
Fukushima Daiichi Nuclear Power Station Preparation Status of the Unit 2 PCV Internal Investigation and Fuel Debris Trial Retrieval Connection Work of the Telescopic Device and the X‐6 Penetration Connection Structure / Pipe
Jul 25, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 PCV Internal Investigation/Preparation Status of Fuel Debris Trial Retrieval
Jul 25, 2024
ALPS Treated Water Discharge Status Update
Jul 19, 2024
Fukushima Daiichi Nuclear Power Station Preparation Status of the Unit 2 PCV Internal Investigation and Fuel Debris Trial Retrieval Carrying the Telescopic Device into the Reactor Building
Jul 16, 2024
Fukushima Daiichi Nuclear Power Station Completion of the Third Discharge of ALPS Treated Water in FY2024(534KB)
Jul 10, 2024
Fukushima Daiichi Nuclear Power Station Preparation Status of the Unit 2 PCV internal investigation and fuel debris trial retrieval Arrival of the telescopic device at Fukushima Daiichi Nuclear Power Station(515KB)
Jul 3, 2024
Fukushima Daiichi Nuclear Power Station Preparation Status of the Unit 2 PCV internal investigation and fuel debris trial retrieval Commencement of transport of the telescopic device(304KB)
Jun 28, 2024
Fukushima Daiichi Nuclear Power Station Commencement of the discharge of ALPS treated water into the sea (third discharge in FY2024)(1.78MB)
Jun 27, 2024
Unit 3 Reactor Building Internal Investigation Results(2.77MB)
Jun 27, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 PCV Internal Investigation/ Preparation Status of Fuel Debris Trial Retrieval(2.63MB)
Jun 27, 2024
ALPS Treated Water Discharge Status Update(8.29MB)
Jun 26, 2024
Fukushima Daiichi Nuclear Power Station Analysis Results of ALPS Treated Water Sampled from the Measurement/Confirmation Facility Tank Group B And the Scheduled Date of the Commencement of the Third Discharge in FY2024(578KB)
Jun 13, 2024
Measures pertaining to the fish inside the port of Fukushima Daiichi Nuclear Power Station (Completion of the construction to re-cover the seafloor of the Units 1-4 intake open channel)(1.30MB)
Jun 4, 2024
Fukushima Daiichi Nuclear Power Station Completion of the Second Discharge of ALPS Treated Water in FY2024(534KB)
May 30, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 PCV Internal Investigation/Preparation Status of Fuel Debris Trial Retrieval(2.39MB)
May 30, 2024
Progress with the Unit 3 Reactor Building Internal Investigation
May 30, 2024
ALPS Treated Water Discharge Status Update(3.78MB)
May 27, 2024
Operational Safety Inspection Implementation Status(186KB)
May 17, 2024
Fukushima Daiichi Nuclear Power Station Commencement of the discharge of ALPS treated water into the sea (second discharge in FY2024)(827KB)
May 15, 2024
Fukushima Daiichi Nuclear Power Station Analysis Results of ALPS Treated Water Sampled from the Measurement/Confirmation Facility Tank Group A And the Scheduled Date of the Commencement of the Second Discharge in FY2024(431KB)
May 13, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation/Trial Retrieval Preparations Completion of deposit removal inside the X-6 penetration(423KB)
May 7, 2024
Operational safety inspection to be implemented at the Fukushima Daiichi Nuclear Power Station(288KB)
May 7, 2024
Fukushima Daiichi Nuclear Power Station Completion of the First Discharge of ALPS Treated Water in FY2024(547KB)
Apr 25, 2024
Fukushima Daiichi Nuclear Power Station A loss of the on-site electric power system A, and injured person (Update)(565KB)
Apr 25, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 PCV Internal Investigation/Preparation Status of Fuel Debris Trial Retrieval(2.93MB)
Apr 25, 2024
ALPS Treated Water Discharge Status Update(3.31MB)
Apr 24, 2024
Fukushima Daiichi Nuclear Power Station Suspension of the operation of the ALPS treated water dilution/discharge facility in conjunction with a loss of on-site power, and injured person(260KB)
Apr 19, 2024
Fukushima Daiichi Nuclear Power Station Commencement of the discharge of ALPS treated water into the sea (first discharge in FY2024)(814KB)
Apr 17, 2024
Fukushima Daiichi Nuclear Power Station Analysis Results of ALPS Treated Water Sampled from the Measurement/Confirmation Facility Tank Group C(400KB)
Apr 11, 2024
Fukushima Daiichi Nuclear Power Station K4 Area Tank Group E Internal Inspection Implementation Status(704KB)
Mar 28, 2024
Fukushima Daiichi Nuclear Power Station Status of Progress of the Marine Organisms Rearing Test(1.66MB)
Mar 28, 2024
ALPS Treated Water Discharge Status Update(6.66MB)
Mar 28, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 PCV Internal Investigation/Preparation Status of Fuel Debris Trial Retrieval(3.04MB)
Mar 28, 2024
Unit 1 PCV Internal Investigation (Non-submerged area)(11.4MB)
Mar 18, 2024
Fukushima Daiichi Nuclear Power Station Unit 1 Primary Containment Vessel Internal Investigation (Non-Submerged Area) Status Inside the Pedestal (Revised)(1.73MB)
Mar 18, 2024
Fukushima Daiichi Nuclear Power Station Completion of the Discharge from Measurement/Confirmation Facility Tank Group B (Fourth Discharge)(520KB)
Mar 14, 2024
Fukushima Daiichi Nuclear Power Station Unit 1 Primary Containment Vessel Internal Investigation (Non Submerged Area) Implementation Status (Day 2)(385KB)
Mar 11, 2024
Fukushima Daiichi Nuclear Power Station Unit 1 Primary Containment Vessel Internal Investigation (Non submerged area) Causes and Countermeasures for Snake like Robot Cable Issues(618KB)
Mar 4, 2024
Measures pertaining to the fish inside the port of Fukushima Daiichi Nuclear Power Station (completion of the replacement of the net to prevent fish from leaving at the east sea wall, etc.)(2.05MB)
Feb 29, 2024
Fukushima Daiichi Nuclear Power Station Status of Progress of the Marine Organisms Rearing Test(1.56MB)
Feb 29, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 PCV Internal Investigation/Preparation Status of Fuel Debris Trial Retrieval(2.62MB)
Feb 29, 2024
Unit 1 PCV Internal Investigation (Non-submerged area)(5.48MB)
Feb 29, 2024
ALPS Treated Water Discharge Status Update(7.33MB)
Feb 28, 2024
Fukushima Daiichi Nuclear Power Station Unit 1 Primary Containment Vessel Internal Investigation (non-submerged area) Implementation Status (Day 1)(313KB)
Feb 28, 2024
Fukushima Daiichi Nuclear Power Station Commencement of the fourth discharge for FY2023(624KB)
Feb 26, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation/Trial Retrieval Preparations Status of progress with deposit removal(335KB)
Feb 26, 2024
Fukushima Daiichi Nuclear Power Station Analysis Results of ALPS Treated Water Sampled from the Measurement/Confirmation Facility Tank Group B(441KB)
Feb 16, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 Telescopic Fuel Debris Trial Retrieval Device(1.00MB)
Feb 15, 2024
Causes and Countermeasures for the Leak of Water Containing Radioactive Substances from the High Temperature Incinerator Building(1.04MB)
Feb 8, 2024
Fukushima Daiichi Nuclear Power Station Committed effective dose assessment for the worker engaged in environmental improvement work in the Unit 2 reactor building(567KB)
Feb 7, 2024
Fukushima Daiichi Nuclear Power Station Water leak from the east side wall of the high-temperature incinerator building(449KB)
Jan 31, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation/Trial Retrieval Preparations Status of progress with deposit removal(512KB)
Jan 25, 2024
Fukushima Daiichi Nuclear Power Station Status of Progress of the Marine Organisms Rearing Test(1.57MB)
Jan 25, 2024
ALPS Treated Water Discharge Status Update(3.56MB)
Jan 25, 2024
Unit 2 PCV Internal Investigation / Preparation Status of Fuel Debris Trial Retrieval(6.41MB)
Jan 18, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation/Trial Retrieval Preparations Status of progress with deposit removal(2.85MB)
Jan 11, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation/Trial Retrieval Preparations Status of progress with deposit removal(1.25MB)
Jan 10, 2024
Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation/Trial Retrieval Preparations Status of progress with deposit removal(502KB)

2023

Nov 30, 2023
Progress of measures pertaining to the fish inside the port(1.13MB)
Nov 30, 2023
Fukushima Daiichi Nuclear Power Station Status of Progress of the Marine Organisms Rearing Test(1.67MB)
Nov 30, 2023
ALPS Treated Water Discharge Status Update(2.46MB)
Nov 20, 2023
Fukushima Daiichi Nuclear Power Station Completion of the Discharge from Measurement/Confirmation Facility Tank Group A (Third Discharge)(414KB)
Nov 16, 2023
Response to the Body Contamination That Occurred during the Cleaning of Additionally Installed ALPS Pipes(1.19MB)
Nov 2, 2023
Fukushima Daiichi Nuclear Power Station Commencement of the Second Stage of the third discharge for FY2023(1.00MB)
Nov 1, 2023
Fukushima Daiichi Nuclear Power Station Analysis Results for the Water Stored in the Discharge Vertical Shaft (Upper-stream Storage) as Part of the First Stage of the Third Discharge in FY2023(584KB)
Oct 31, 2023
Fukushima Daiichi Nuclear Power Station Commencement of the First Stage of the third discharge for FY2023(1.23M)
Oct 30, 2023
Fukushima Daiichi Nuclear Power Station Facility inspection results and preparations for the First Stage of the third discharge of FY2023(533KB)
Oct 26, 2023
Fukushima Daiichi Nuclear Power Station Status of Progress of the Marine Organisms Rearing Test(1.56MB)
Oct 26, 2023
ALPS Treated Water Discharge Status Update(3.06MB)
Oct 26, 2023
Body contamination during the cleaning of additionally installed ALPS pipes(617KB)
Oct 23, 2023
Fukushima Daiichi Nuclear Power Station Completion of the Discharge from Measurement/Confirmation Facility Tank Group C (Second Discharge)(424KB)
Oct 19, 2023
Fukushima Daiichi Nuclear Power Station Analysis Results of ALPS Treated Water Sampled from the Measurement/Confirmation Facility Tank Group A(584KB)
Oct 13, 2023
Measures pertaining to the fish inside the port at the Fukushima Daiichi Nuclear Power Station (Progress of construction for main installation work for the net to prevent the fish from leaving at the east sea wall, and the commencement of re-cover of the seabed soil in units 1-4 intake open channel, etc. )(3.96MB)
Oct 5, 2023
Fukushima Daiichi Nuclear Power Station Commencement of the Second Stage of the second discharge for FY2023(966KB)
Oct 4, 2023
Fukushima Daiichi Nuclear Power Station Analysis Results for the Water Stored in the Discharge Vertical Shaft (Upper-stream Storage) as Part of the First Stage of the Second Discharge in FY2023(622KB)
Oct 3, 2023
Fukushima Daiichi Nuclear Power Station Commencement of the First Stage of the second discharge for FY2023(3.58MB)
Sep 28, 2023
Fukushima Daiichi Nuclear Power Station Status of Progress of the Marine Organisms Rearing Test(1.57MB)
Sep 28, 2023
ALPS Treated Water Discharge Status Update(7.34MB)
Sep 21, 2023
Fukushima Daiichi Nuclear Power Station Analysis Results of ALPS Treated Water Sampled from the Measurement/Confirmation Facility Tank Group C(493KB)
Sep 19, 2023
Addition of quick measurement data from each agency to the website “Overarching Radiation-monitoring data Browsing System (ORBS)”(995KB)
Sep 11, 2023
Fukushima Daiichi Nuclear Power Station Completion of the Discharge from Measurement/Confirmation Facility Tank Group B (First Discharge)(386KB)
Sep 7, 2023
Fukushima Daiichi Nuclear Power Station Status of Measurement/Confirmation Facility Tank Group B Discharge and Discharge Completion Process(673KB)
Sep 1, 2023
Fukushima Daiichi Nuclear Power Station Tritium concentration analysis results from sea area monitoring (within 3km of the power station (near the discharge outlet))(4.01MB)
Aug 31, 2023
Fukushima Daiichi Nuclear Power Station Status of Progress of the Marine Organisms Rearing Test(1.65MB)
Aug 25, 2023
Fukushima Daiichi Nuclear Power Station Tritium concentration analysis results of seawater pipes and sea area monitoring pertaining to ALPS treated water discharge into the sea(803KB)
Aug 24, 2023
Fukushima Daiichi Nuclear Power Station Commencement of the Discharge of ALPS Treated Water into the Sea(320KB)
Aug 24, 2023
Fukushima Daiichi Nuclear Power Station Commencement of the Initial Discharge of ALPS Treated Water (Stage 2)(1.18MB)
Aug 23, 2023
Fukushima Daiichi Nuclear Power Station Commencement of preparations for the initial discharge of ALPS-treated water (First Stage)(776KB)
Aug 22, 2023
Fukushima Daiichi Nuclear Power Station Commencement of preparations for the First Stage of the initial discharge of ALPS treated water(203KB)
Mar 30, 2023
Fukushima Daiichi Nuclear Power Station Status of Progress of the Marine Organisms Rearing Test(492KB)
Mar 30, 2023
Status of Progress of the installation of ALPS treated water dilution/discharge facility and related facilities(2.66MB)
Mar 27, 2023
Sampling from the measurement/confirmation facility that is part of ALPS treated water dilution/discharge facility in the Fukushima Daiichi Nuclear Power Station(470KB)
Mar 16, 2023
Completion of pre-use inspections of ALPS treated water dilution/discharge facility measurement/confirmation facility at the Fukushima Daiichi Nuclear Power Station and commencement to operate circulation/agitation equipment(480KB)
Mar 13, 2023
Launching of Overarching Radiation-monitoring data Browsing System (ORBS)(821KB)
Mar 13, 2023
The Construction of ALPS Treated Water Dilution/Discharge Facilities and Ancillary Facilities at the Fukushima Daiichi Nuclear Power Station Commencement of the removal of temporary structures such as the guiding scaffolds(906KB)
Mar 9, 2023
Signing of nondisclosure agreement pertaining to feasibility study on technology for separating tritium from ALPS treated water, etc.(215KB)

2022

May 26, 2022
Status of Sea Area Monitoring for the Handling of ALPS Treated Water(3.35MB)
May 26, 2022
Status of Unit 1 PCV internal investigation(3.42MB)
May 26, 2022
(Report) Improvements in the Surroundings of ALPS Treated Water Dilution/Discharge Facilities at the Fukushima Daiichi Nuclear Power Station(1.50MB)
May 23, 2022
Fukushima Daiichi Nuclear Power Station Unit 1 Primary Containment Vessel Internal Investigation Completion of the detailed visual investigation of the perimeter of the pedestal using submersible ROV-A2(3.88MB)
May 19, 2022
Implementation Status of the Fukushima Daiichi Nuclear Power Station Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (work conducted on May 17 and 18)(3.65MB)
May 19, 2022
IAEA Director General Grossi’s visit to the Fukushima Daiichi Nuclear Power Station (May 19)(648KB)
Mar 31, 2022
Progress Report on the High-Performance ALPS Adjustment Operation for Pre-service Inspection(341KB)
Mar 31, 2022
(Report) Progress of Necessary Improvements in the Surroundings for Construction of ALPS Treated Water Dilution/Discharge Facilities(549KB)
Mar 28, 2022
Analysis Results of Fish <Sampled within a 20km Radius of the Fukushima Daiichi Nuclear Power Station> Samples collected in the third quarter of FY2021(83.6KB)
Mar 28, 2022
Analysis Results of Fish <Sampled within a 20km Radius of the Fukushima Daiichi Nuclear Power Station>(77.5KB)
Mar 28, 2022
Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station>(64.3KB)
Mar 25, 2022
Observation by IAEA review team of the sampling of ALPS treated water at the TEPCO Fukushima Daiichi Nuclear Power Station (March 24)(217KB)
Mar 24, 2022
Sea Area Monitoring Plan for the Handling of ALPS Treated Water Fukushima Daiichi Nuclear Power Station(1.40MB)
Mar 24, 2022
Implementation Status of the Fukushima Daiichi Nuclear Power Station Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (work conducted between March 14~16)(4.00MB)
Mar 22, 2022
Conditions at the Fukushima Daiichi Nuclear Power Station after the Earthquake of March 16(Update 2)(951KB)
Mar 18, 2022
Conditions at the Fukushima Daiichi Nuclear Power Station after the Earthquake of March 16 (Update)(527KB)
Mar 17, 2022
Fukushima Daiichi Nuclear Power Station Commencement of training on marine organism rearing test(881KB)
Mar 17, 2022
Conditions at the Fukushima Daiichi Nuclear Power Station after the Earthquake of March 16(496KB)
Mar 14, 2022
Implementation Status of the Fukushima Daiichi Nuclear Power Station Unit 1 Primary Containment Vessel Internal Investigation (ROV-A2) (Preliminary report)(3.02MB)
Mar 10, 2022
Secondary assessment of proposals from Period 1 and primary assessment of proposals from Period 2 on technology for separating tritium from ALPS treated water, etc.(230KB)
Feb 25, 2022
Analysis Results of Fish <Sampled within a 20km Radius of the Fukushima Daiichi Nuclear Power Station>(77.4KB)
Feb 25, 2022
Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station>(68.9KB)
Feb 24, 2022
Progress Status of Discussions Regarding Marine Organism Rearing Test Fukushima Daiichi Nuclear Power Station(273KB)
Feb 16, 2022
IAEA review team conducts field inspection during safety review of ALPS treated water (February 15) at the Fukushima Daiichi Nuclear Power Station(913KB)
Feb 10, 2022
Implementation Status of the Fukushima Daiichi Nuclear Power Station Unit 1 Primary Containment Vessel Internal Investigation (As of February 10)(3.97MB)
Feb 9, 2022
Implementation Status of the Fukushima Daiichi Nuclear Power Station Unit 1 Primary Containment Vessel Internal Investigation (As of February 9)(3.69MB)
Feb 8, 2022
Implementation Status of the Fukushima Daiichi Nuclear Power Station Unit 1 Primary Containment Vessel Internal Investigation (Preliminary report)(2.70MB)
Feb 7, 2022
Progress status of the investigation into the causes of nonconformities discovered during preparations for the Unit 1 PCV internal investigation at the Fukushima Daiichi Nuclear Power Station (Update 4)(199KB)
Feb 3, 2022
Results of the geological survey (boring survey) for discharge facilities for water treated with multi-nuclide removal equipment at the Fukushima Daiichi Nuclear Power Station(3.66MB)

2021

Dec 27, 2021
Analysis Results of Fish <Sampled within a 20km Radius of the Fukushima Daiichi Nuclear Power Station> Samples collected in the second quarter of FY2021(83.6KB)
Dec 27, 2021
Analysis Results of Fish <Sampled within a 20km Radius of the Fukushima Daiichi Nuclear Power Station>(80.5KB)
Dec 27, 2021
Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station>(68.4KB)
Dec 27, 2021
Completion of the geological survey in ocean areas relevant to the deliberation of facilities for water treated with ALPS, etc. at the Fukushima Daiichi Nuclear Power Station(789KB)
Dec 16, 2021
Primary assessment of proposals (Period 1) on technology for separating tritium from ALPS treated water, etc.(211KB)
Dec 6, 2021
Fukushima Daiichi Nuclear Power Station Investigation of the rising temperature of land-side impermeable wall (frozen-soil wall) temperature measuring tube 150-7S (update 4)(769KB)
Nov 29, 2021
Analysis Results of Fish <Sampled within a 20km Radius of the Fukushima Daiichi Nuclear Power Station>(77.9KB)
Nov 29, 2021
Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station>(52.2KB)
Nov 29, 2021
Geological survey in sea areas relevant in deliberating facilities for water treated with ALPS, etc. at the Fukushima Daiichi Nuclear Power Station (Update)(288KB)
Nov 26, 2021
Geological survey in sea areas relevant in deliberating facilities for water treated with ALPS, etc. at the Fukushima Daiichi Nuclear Power Station(473KB)
Nov 25, 2021
Status of Investigation into the Rise in Temperature of Temperature Measuring Tube 150-7S for the Land-Side Impermeable Wall (frozen-soil wall)(2.78KB)
Nov 17, 2021
Visit to the Fukushima Daiichi Nuclear Power Station by the IAEA review mission to assess the safety of ALPS treated water (November 16)(461KB)
Nov 17, 2021
Fukushima Daiichi Nuclear Power Station Sample Tank (K4 Tank Group) Agitation Demonstration Experiments(896KB)
Sep 29, 2021
Analysis Results of Fish <Sampled within a 20km Radius of the Fukushima Daiichi Nuclear Power Station> Samples collected in the first quarter of FY2021(83.6KB)
Sep 29, 2021
Analysis Results of Fish <Sampled within a 20km Radius of the Fukushima Daiichi Nuclear Power Station>(78.0KB)
Sep 29, 2021
Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station>(64.7KB)
Sep 27, 2021
Multi-nuclide removal equipment (ALPS) and high integrity container (HIC) exhaust filters (Update 2)(824KB)
Sep 21, 2021
Multi-nuclide removal equipment (ALPS) and high integrity container (HIC) exhaust filters (Update)(2.21MB)
Sep 16, 2021
Multi-nuclide removal equipment (ALPS) and high integrity container (HIC) exhaust filters(1.06MB)
Sep 9, 2021
Visit to the Fukushima Daiichi Nuclear Power Station by the IAEA review mission to assess the safety of ALPS treated water (September 8)(491KB)
Sep 8, 2021
Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station> (Preliminary Report)(64.1KB)
Jul 29, 2021
Analysis Results of Fish <Sampled within a 20km Radius of the Fukushima Daiichi Nuclear Power Station>(82.2KB)
Jul 29, 2021
Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station> (65.3KB)
Jul 28, 2021
Commencement of Construction Works of Tanks for ALPS Treated Water etc. in G4 North/G5 Areas of the Fukushima Daiichi NPS (235KB)
Jul 19, 2021
Decisions and countermeasures under 1F Rules Article 18-10 regarding temporary rise of total β value of temporary storage area P catch basin at Fukushima Daiichi Nuclear Power Station(5.54MB)
Jul 8, 2021
Status of E Area D1/D2 Tank (Flange Type) Disassembly(781KB)
Jul 1, 2021
Status of Visual Inspections of Containers Stored in the Temporary Storage Areas at the Fukushima Daiichi Nuclear Power Station(161KB)
Mar 31, 2021
"High Alarm" from Plastic Scintillation Fiber monitor (PSF monitor) monitoring the wharf drainage channel at the Fukushima Daiichi Nuclear Power Station (Continued report)(318KB)
Mar 29, 2021
Analysis Results of Fish <Sampled within a 20km Radius of the Fukushima Daiichi Nuclear Power Station> Samples collected in the third quarter of FY2020(83.2KB)
Mar 29, 2021
Analysis Results of Fish <Sampled within a 20km Radius of the Fukushima Daiichi Nuclear Power Station>(78.2KB)
Mar 29, 2021
Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station>(52.2KB)
Mar 29, 2021
“High Alarm” from Plastic Scintillation Fiber monitor (PSF monitor) monitoring the wharf drainage channel at the Fukushima Daiichi Nuclear Power Station(540KB)
Mar 26, 2021
Conditions at the Fukushima Daiichi Nuclear Power Station after the earthquake on March 20 (Continued report) (0.99MB)
Mar 25, 2021
Handling of the PCV Water Level Drops at Units 1 and 3(3.61MB)
Mar 22, 2021
Conditions at the Fukushima Daiichi Nuclear Power Station after the earthquake on March 20(794KB)
Mar 19, 2021
Seismometers installed in the Fukushima Daiichi NPS Unit 3 reactor building (Recommencement of trial usage)(360KB)
Mar 18, 2021
Drop in Water Levels in the Fukushima Daiichi Unit 1 and Unit 3 Primary Containment Vessels (Continued report II)(1.22MB)
Mar 11, 2021
Rising trend in accumulated water levels in the northeastern area of the Fukushima Daiichi Unit 3 reactor building (Continued report II)(484KB)
Mar 11, 2021
Rising trend in accumulated water levels in the northeastern area of the Fukushima Daiichi Unit 3 reactor building (Continued report)(319KB)
Mar 10, 2021
Rising trend in accumulated water levels in the northeastern area of the Fukushima Daiichi Unit 3 reactor building(303KB)
Mar 4, 2021
Drop in Water Levels in the Fukushima Daiichi Unit 1 and Unit 3 Primary Containment Vessels (Continued report)(1.10MB)

2020

Jun 26, 2020
Nuclide Analysis Results of Fish and Shellfish <Sampled from the Ocean Area within a 20km Radius of the Fukushima Daiichi Nuclear Power Station>Samples collected in the fourth quarter of FY2019 (58.8KB)
Jun 26, 2020
Nuclide Analysis Results of Fish and Shellfish (Sampled from the Ocean Area within a 20km Radius of the Fukushima Daiichi Nuclear Power Station) (excluding the port) (64.3KB)
Jun 26, 2020
Nuclide Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station> (28.2KB)
Jun 11, 2020
Completion of air mortar injection into the Fukushima Daiichi Nuclear Power Station Unit 1 SFP cover bag(349KB)
Jun 11, 2020
Completion of the Internal Investigation of the Unit 2 Spent Fuel Pool (SFP) at the Fukushima Daiichi Nuclear Power Station(203KB)
Jun 10, 2020
Start of Internal Investigation of the Fukushima Daiichi Nuclear Power Station Unit 2 Spent Fuel Pool (SFP)(211KB)
May 28, 2020
Covid-19 Countermeasures at the Fukushima Daiichi Nuclear Power Station(83.1 KB)
May 27, 2020
Nuclide Analysis Results of Fish and Shellfish (Sampled from the Ocean Area within a 20km Radius of the Fukushima Daiichi Nuclear Power Station) (excluding the port)(64.2 KB)
May 27, 2020
Nuclide Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station>(28.4 KB)
May 18, 2020
Construction to Return J Village and the Naraha Municipal Parking Lot to their Original Condition, and Dose Reduction Measures(299 KB)
May 12, 2020
Submersible ROV Operation Training in Preparation for the Unit 2 Spent Fuel Pool Internal Investigation at the Fukushima Daiichi Nuclear Power Station(164 KB)
May 1, 2020
Completion of Unit 1/2 exhaust stack dismantling at Fukushima Daiichi Nuclear Power Station (890 KB)
Mar 27, 2020
Slurry Stabilization Treatment System Installation Plan Status(547 KB)
Mar 27, 2020
Covid-19 Countermeasures at the Fukushima Daiichi Nuclear Power Station(632 KB)
Mar 27, 2020
Nuclide Analysis Results of Fish and Shellfish <Sampled from the Ocean Area within a 20km Radius of the Fukushima Daiichi Nuclear Power Station> Samples collected in the third quarter of FY2019(57 KB)
Mar 27, 2020
Nuclide Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Poer Station>(59 KB)
Mar 27, 2020
Nuclide Analysis Results of Fish and Shellfish Shellfish (Sampled from the Ocean Area within a 20km Radius of the Fukushima Daiichi Nuclear Power Station) (excluding the port)(240 KB)
Mar 26, 2020
Restoration and decontamination work at Narahatown-managed parking lot(3.6 MB)
Mar 25, 2020
Evaluation of the exposure dose of workers engaged in radiation work at the Fukushima Daiichi Nuclear Power Station(186.2 KB)
Mar 24, 2020
TEPCO Draft Study Responding to the Subcommittee Report on Handling ALPS Treated Water(1.8 MB)
Mar 24, 2020
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(234.6 KB)
Mar 24, 2020
Situation of Storage and Treatment of Accumulated Water containing Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (444th Release)(342.1 KB)
Mar 16, 2020
Situation of Storage and Treatment of Accumulated Water containing Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (443rd Release)(327.9 KB)
Mar 16, 2020
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(234.9 KB)
Mar 9, 2020
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(234.1 KB)
Mar 9, 2020
Situation of Storage and Treatment of Accumulated Water containing Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (442nd Release)(339.3 KB)
Mar 2, 2020
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(432.4 KB)
Mar 2, 2020
Situation of Storage and Treatment of Accumulated Water containing Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (441st Release)(339.5 KB)
Feb 28, 2020
Evaluation of the exposure dose of workers engaged in radiation work at the Fukushima Daiichi Nuclear Power Station(186.3 KB)
Feb 26, 2020
Nuclide Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station>(39.7 KB)
Feb 26, 2020
Nuclide Analysis Results of Fish and Shellfish (Sampled from the Ocean Area within a 20km Radius of the Fukushima Daiichi Nuclear Power Station) (excluding the port)(125.2 KB)
Feb 25, 2020
Situation of Storage and Treatment of Accumulated Water containing Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (440th Release)(342.7 KB)
Feb 25, 2020
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(234.6 KB)
Feb 17, 2020
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(235.2 KB)
Feb 17, 2020
Situation of Storage and Treatment of Accumulated Water containing Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (439th Release)(374.7 KB)
Feb 10, 2020
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(234.6 KB)
Feb 10, 2020
Situation of Storage and Treatment of Accumulated Water containing Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (438th Release)(327.8 KB)
Feb 6, 2020
Results of Internal Inspection of Storage Tanks for Water treated with Multi–nuclide Removal Equipment at the Fukushima Daiichi NPS(434.7 KB)
Feb 3, 2020
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(235.0 KB)
Feb 3, 2020
Situation of Storage and Treatment of Accumulated Water containing Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (437th Release)(338.9 KB)
Jan 31, 2020
Evaluation of the exposure dose of workers engaged in radiation work at the Fukushima Daiichi Nuclear Power Station(661.8 KB)
Jan 29, 2020
Nuclide Analysis Results of Fish and Shellfish (Sampled from the Ocean Area within a 20km Radius of the Fukushima Daiichi Nuclear Power Station) (excluding the port)(243.0 KB)
Jan 29, 2020
Nuclide Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station>(60.7 KB)
Jan 27, 2020
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(235.2 KB)
Jan 27, 2020
Situation of Storage and Treatment of Accumulated Water containing Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (436th Release)(371.3 KB)
Jan 20, 2020
Situation of Storage and Treatment of Accumulated Water containing Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (435th Release)(323.8 KB)
Jan 20, 2020
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(235.2 KB)
Jan 14, 2020
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(454.3 KB)
Jan 14, 2020
Situation of Storage and Treatment of Accumulated Water containing Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (434th Release)(326.8 KB)
Jan 9, 2020
Situation of Storage and Treatment of Accumulated Water containing Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (433rd Release)(412.9 KB)
Jan 9, 2020
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(444.8 KB)

2019

Dec 25, 2019
Nuclide Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station>(39.2 KB)
Dec 25, 2019
Evaluation of the exposure dose of workers engaged in radiation work at the Fukushima Daiichi Nuclear Power Station(186.6 KB)
Dec 25, 2019
Nuclide Analysis Results of Fish and Shellfish (Sampled from the Ocean Area within a 20km Radius of the Fukushima Daiichi Nuclear Power Station) (excluding the port)(181.2 KB)
Dec 25, 2019
Nuclide Analysis Results of Fish and Shellfish <Sampled from the Ocean Area within a 20km Radius of the Fukushima Daiichi Nuclear Power Station> Samples collected in the second quarter of FY2019(55.4 KB)
Dec 23, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (432nd Release)(344.3 KB)
Dec 23, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(235.4 KB)
Dec 19, 2019
Status of Deliberations on Fuel Debris Removal(1.4 MB)
Dec 19, 2019
Status of Deliberations on Unit 1 Fuel Removal Plans(809.6 KB)
Dec 16, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (431st Release)(324.4 KB)
Dec 16, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(340.3 KB)
Dec 9, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(235.7 KB)
Dec 9, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (430th Release)(344.1 KB)
Dec 2, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (429th Release)(325.7 KB)
Dec 2, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(238.6 KB)
Nov 29, 2019
Evaluation of the exposure dose of workers engaged in radiation work at the Fukushima Daiichi Nuclear Power Station(186.4 KB)
Nov 25, 2019
Nuclide Analysis Results of Fish and Shellfish (Sampled from the Ocean Area within a 20km Radius of the Fukushima Daiichi Nuclear Power Station) (excluding the port)(179.6 KB)
Nov 25, 2019
Nuclide Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station>(32.6 KB)
Nov 25, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (428th Release)(325.5 KB)
Nov 25, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(235.6 KB)
Nov 18, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (427th Release)(325.6 KB)
Nov 18, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(236.0 KB)
Nov 11, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (426th Release)(328.6 KB)
Nov 11, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(236.8 KB)
Nov 5, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(235.5 KB)
Nov 5, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (425th Release)(326.4 KB)
Oct 31, 2019
Evaluation of the exposure dose of workers engaged in radiation work at the Fukushima Daiichi Nuclear Power Station(659.1 KB)
Oct 31, 2019
Evaluation of Unit 2 Fuel Removal Method(1.1 MB)
Oct 30, 2019
Nuclide Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station>(31.3 KB)
Oct 30, 2019
Nuclide Analysis Results of Fish and Shellfish (Sampled from the Ocean Area within a 20km Radius of the Fukushima Daiichi Nuclear Power Station) (excluding the port)(160.7 KB)
Oct 28, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (424th Release)(324.0 KB)
Oct 28, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(236.9 KB)
Oct 21, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(236.1 KB)
Oct 21, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (423rd Release)(323.8 KB)
Oct 15, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(236.5 KB)
Oct 15, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (422nd Release)(322.0 KB)
Oct 7, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (421st Release)(323.0 KB)
Oct 7, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(236.2 KB)
Sep 30, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (420th Release)(342.9 KB)
Sep 30, 2019
Evaluation of the exposure dose of workers engaged in radiation work at the Fukushima Daiichi Nuclear Power Station(186.1 KB)
Sep 30, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(235.7 KB)
Sep 26, 2019
Nuclide Analysis Results of Fish <Sampled from the Port Area of the Fukushima Daiichi Nuclear Power Station>(32.6 KB)
Sep 26, 2019
Nuclide Analysis Results of Fish and Shellfish <Sampled from the Ocean Area within a 20km Radius of the Fukushima Daiichi Nuclear Power Station> Samples collected in the first quarter of FY2019(35.6 KB)
Sep 26, 2019
Nuclide Analysis Results of Fish and Shellfish (Sampled from the Ocean Area within a 20km Radius of the Fukushima Daiichi Nuclear Power Station) (excluding the port)(159.0 KB)
Sep 24, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (419th Release)(364.4 KB)
Sep 24, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(237.2 KB)
Sep 17, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (418th Release)(364.7 KB)
Sep 17, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(237.4 KB)
Sep 11, 2019
Nuclide Analysis Results from Fish and Shellfish <Sampled from the Ocean Area within a 20km Radius of the Fukushima Daiichi Nuclear Power Station> Samples collected in the first quarter of FY2019(538.7 KB)
Sep 9, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (417th Release)(322.4 KB)
Sep 9, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(238.5 KB)
Sep 2, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (416th Release)(350.3 KB)
Sep 2, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(239.1 KB)
Aug 30, 2019
Evaluation of the exposure dose of workers engaged in radiation work at the Fukushima Daiichi Nuclear Power Station(185.9 KB)
Aug 28, 2019
Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(204.6 KB)
Aug 28, 2019
Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station>(55.0 KB)
Aug 26, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(238.9 KB)
Aug 26, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (415th Release)(342.1 KB)
Aug 21, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(484.5 KB)
Aug 21, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (414th Release)(372.7 KB)
Aug 5, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (413rd Release)(338.2 KB)
Aug 5, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(238.2 KB)
Jul 31, 2019
Evaluation of the exposure dose of workers at the Fukushima Daiichi Nuclear Power Station(702.1 KB)
Jul 29, 2019
Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(269.1 KB)
Jul 29, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(237.8 KB)
Jul 29, 2019
Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station>(78.7 KB)
Jul 29, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (412nd Release)(360.6 KB)
Jul 25, 2019
Covering the Unit 1 Spent Fuel Pool(970.6 KB)
Jul 22, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (411st Release)(336.3 KB)
Jul 22, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(236.4 KB)
Jul 18, 2019
Commencement of well plug exploration using remotely operated robot on the operating floor of Fukushima Daiichi Nuclear Power Station Unit 1(552.1 KB)
Jul 16, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(338.9 KB)
Jul 16, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (410th Release)(335.5 KB)
Jul 8, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(238.1 KB)
Jul 8, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (409th Release)(362.4 KB)
Jul 1, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (408th Release)(361.0 KB)
Jul 1, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(235.9 KB)
Jun 27, 2019
Evaluation of the exposure dose of workers engaged in radiation work at the Fukushima Daiichi Nuclear Power Station(185.8 KB)
Jun 25, 2019
Nuclide Analysis Results of Fish and Shellfish <Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station> Samples collected in the fourth quarter of FY2018(39.4 KB)
Jun 25, 2019
Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(254.6 KB)
Jun 25, 2019
Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station>(74.9 KB)
Jun 24, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(435.1 KB)
Jun 24, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (407th Release)(346.6 KB)
Jun 17, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (406th Release)(324.2 KB)
Jun 17, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(235.4 KB)
Jun 10, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(238.4 KB)
Jun 10, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (405th Release)(324.2 KB)
Jun 4, 2019
Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(231.4 KB)
Jun 3, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(194.2 KB)
Jun 3, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (404th Release)(324.6 KB)
May 31, 2019
Evaluation of the exposure dose of workers engaged in radiation work at the Fukushima Daiichi Nuclear Power Station(185.3 KB)
May 28, 2019
Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(256.6 KB)
May 28, 2019
Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station>(39.5 KB)
May 27, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (403rd Release)(338.7 KB)
May 27, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(195.7 KB)
May 20, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (402nd Release)(358.9 KB)
May 20, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(193.2 KB)
May 13, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(536.2 KB)
May 13, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (401st Release)(403.9 KB)
Apr 24, 2019
Evaluation of the exposure dose of workers at the Fukushima Daiichi Nuclear Power Station(649.9 KB)
Apr 23, 2019
Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(234.9 KB)
Apr 23, 2019
Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station>(39.6 KB)
Apr 22, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(255.0 KB)
Apr 22, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (400th Release)(375.2 KB)
Apr 15, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(203.0 KB)
Apr 15, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (399th Release)(356.3 KB)
Apr 15, 2019
Fuel removal work from Unit 3 spent fuel pool started at Fukushima Daiichi Nuclear Power Station(517.2 KB)
Apr 8, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(205.6 KB)
Apr 8, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (398th Release)(357.9 KB)
Apr 1, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (397th Release)(322.1 KB)
Apr 1, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(205.7 KB)
Mar 28, 2019
Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station>(81.9 KB)
Mar 28, 2019
Nuclide Analysis Results of Fish and Shellfish <Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station> Samples collected in the third quarter of FY2018(39.4 KB)
Mar 28, 2019
Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(257.1 KB)
Mar 27, 2019
Evaluation of the exposure dose of workers at the Fukushima Daiichi Nuclear Power Station(185.4 KB)
Mar 27, 2019
Completion of the transfer of ALPS etc. treated water previously stored in flange tanks(639.7 KB)
Mar 26, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(205.7 KB)
Mar 26, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (396th Release)(342.6 KB)
Mar 18, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(220.0 KB)
Mar 18, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (395th Release)(369.9 KB)
Mar 11, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(222.3 KB)
Mar 11, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (394th Release)(343.0 KB)
Mar 4, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(220.4 KB)
Mar 4, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (393rd Release)(320.0 KB)
Feb 28, 2019
Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation Results(2.3 MB)
Feb 27, 2019
Evaluation of the exposure dose of workers at the Fukushima Daiichi Nuclear Power Station(185.6 KB)
Feb 26, 2019
Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station>(39.4 KB)
Feb 26, 2019
Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(235.2 KB)
Feb 25, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (392nd Release)(339.0 KB)
Feb 25, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(222.0 KB)
Feb 18, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(204.6 KB)
Feb 18, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (391st Release)(338.7 KB)
Feb 14, 2019
Internal investigation of Unit 2 primary containment vessel (February 13, 2019)(715.3 KB)
Feb 13, 2019
Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation Results (Preliminary Report)(3.0 MB)
Feb 12, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (390th Release)(317.9 KB)
Feb 12, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(207.2 KB)
Feb 4, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(205.9 KB)
Feb 4, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (389th Release)(317.5 KB)
Jan 30, 2019
Evaluation of the exposure dose of workers at the Fukushima Daiichi Nuclear Power Station(644.1 KB)
Jan 28, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (388th Release)(338.4 KB)
Jan 28, 2019
Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station>(39.2 KB)
Jan 28, 2019
Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(258.0 KB)
Jan 28, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(205.8 KB)
Jan 21, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(206.7 KB)
Jan 21, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (387th Release)(338.8 KB)
Jan 15, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(266.4 KB)
Jan 15, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (386th Release)(391.5 KB)
Jan 9, 2019
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (385th Release)(362.3 KB)
Jan 9, 2019
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(390.8 KB)

2018

Dec 27, 2018
Evaluation of the exposure dose of workers at the Fukushima Daiichi Nuclear Power Station(182.9 KB)
Dec 27, 2018
Progress of countermeasures for earthquakes and tsunami(1.5 MB)
Dec 27, 2018
Status of Preparations for the Unit 2 Primary Containment Vessel Internal Investigation(1.1 MB)
Dec 25, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (384th Release)(352.0 KB)
Dec 25, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(205.6 KB)
Dec 20, 2018
Nuclide Analysis Results of Fish and Shellfish<Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station> Samples collected in the second quarter of FY2018(39.3 KB)
Dec 20, 2018
Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station>(60.9 KB)
Dec 20, 2018
Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(213.6 KB)
Dec 17, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(220.2 KB)
Dec 17, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (383rd Release)(354.8 KB)
Dec 10, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(206.1 KB)
Dec 10, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (382nd Release)(354.2 KB)
Dec 3, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(204.8 KB)
Dec 3, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (381st Release)(340.1 KB)
Nov 29, 2018
Evaluation of the exposure dose of workers at the Fukushima Daiichi Nuclear Power Station(182.5 KB)
Nov 28, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (380th Release)(335.4 KB)
Nov 27, 2018
Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station>(39.0 KB)
Nov 27, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(206.0 KB)
Nov 27, 2018
Nuclide Analysis Results of Fish and Shellfish(Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station)(excluding the port)(213.1 KB)
Nov 19, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (379th Release)(339.0 KB)
Nov 19, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(205.4 KB)
Nov 12, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (378th Release)(354.1 KB)
Nov 12, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(269.5 KB)
Nov 8, 2018
Site Inspection for IAEA Decommissioning Review Mission at Fukushima Daiichi NPS (November 7)(529.8 KB)
Nov 8, 2018
Checking the status of cooling of fuel debris at Fukushima Daiichi Nuclear Power Station Unit 2(881.7 KB)
Nov 5, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (377th Release)(353.5 KB)
Nov 5, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(207.8 KB)
Oct 30, 2018
Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(169.9 KB)
Oct 30, 2018
Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station>(39.0 KB)
Oct 30, 2018
Evaluation of the exposure dose of workers at the Fukushima Daiichi Nuclear Power Station(599.5 KB)
Oct 29, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(204.7 KB)
Oct 29, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (376th Release)(322.3 KB)
Oct 25, 2018
Work environment improvements at the Fukushima Daiichi Nuclear Power Station(527.7 KB)
Oct 25, 2018
Radiation dose levels at the Fukushima Daiichi Nuclear Power Station(1.5 MB)
Oct 22, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (375th Release)(323.6 KB)
Oct 22, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(204.6 KB)
Oct 15, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (374th Release)(322.6 KB)
Oct 15, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(208.2 KB)
Oct 9, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (373rd Release)(339.1 KB)
Oct 9, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(204.6 KB)
Oct 1, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildingsand in the amount of groundwater and rainwater flowing into the buildings(205.3 KB)
Oct 1, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (372nd Release)(351.6 KB)
Sep 28, 2018
Evaluation of the exposure dose of workers at the Fukushima Daiichi Nuclear Power Station(182.4 KB)
Sep 26, 2018
Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station>(52.8 KB)
Sep 26, 2018
Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(168.8 KB)
Sep 26, 2018
Nuclide Analysis Results of Fish and Shellfish <Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station> Samples collected in the first quarter of FY2018(39.3 KB)
Sep 25, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (371st Release)(351.4 KB)
Sep 25, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildingsand in the amount of groundwater and rainwater flowing into the buildings(210.9 KB)
Sep 25, 2018
Completion of X brace removal on the west side of the Unit 1 reactor building at the Fukushima Daiichi Nuclear Power Station(327.2 KB)
Sep 18, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (370th Release)(337.2 KB)
Sep 18, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildingsand in the amount of groundwater and rainwater flowing into the buildings(214.7 KB)
Sep 10, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildingsand in the amount of groundwater and rainwater flowing into the buildings(208.5 KB)
Sep 10, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (369th Release)(318.3 KB)
Sep 3, 2018
Situation of Storage and Treatment of Accumulated Water including Highly Concentrated Radioactive Materials at Fukushima Daiichi Nuclear Power Station (368th Release)(335.5 KB)
Sep 3, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(209.1 KB)
Aug 31, 2018
Evaluation of the exposure dose of workers at the Fukushima Daiichi Nuclear Power Station(182.3 KB)
Aug 27, 2018
Nuclide Analysis Results of Fish and Shellfish(Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(257.2 KB)
Aug 27, 2018
Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station>(52.8 KB)
Aug 27, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildingsand in the amount of groundwater and rainwater flowing into the buildings(207.5 KB)
Aug 22, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildingsand in the amount of groundwater and rainwater flowing into the buildings(202.3 KB)
Aug 13, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildingsand in the amount of groundwater and rainwater flowing into the buildings(208.1 KB)
Aug 6, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(290.6 KB)
Jul 30, 2018
Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(279.9 KB)
Jul 30, 2018
Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station>(52.9 KB)
Jul 30, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(126.2 KB)
Jul 26, 2018
Primary Containment Vessel Internal Investigation, Sampling and Analysis(1.1 MB)
Jul 26, 2018
Fuel removal from the spent fuel pool at Fukushima Daiichi Nuclear Power Station Unit 3(2.0 MB)
Jul 26, 2018
Investigation of Operating Floor after making an opening in the Outer West Wall of the Unit 2 Reactor Building(1.8 MB)
Jul 23, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(283.7 KB)
Jul 17, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(283.6 KB)
Jul 9, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(125.4 KB)
Jul 2, 2018
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(124.2 KB)

Click here for Handouts at Press Conference before June 28, 2018.

  1. HOME
  2. Our Responsibilities to Fukushima
  3. Fukushima Daiichi decommissioning project
  4. Information
  5. News Releases
  6. Handouts at Press Conference

Tokyo Electric Power Company Holdings

© Tokyo Electric Power Company Holdings, Inc.

AltStyle によって変換されたページ (->オリジナル) /