Kudlu Gate metro station
Kudlu Gate | |||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Namma Metro station | |||||||||||||||||||||||||||||||||||||||||||||||
Final stages of this metro station as of April 2024 | |||||||||||||||||||||||||||||||||||||||||||||||
General information | |||||||||||||||||||||||||||||||||||||||||||||||
Location | Hosur Rd, Kudlu Gate, Industrial Layout, Singasandra, Bengaluru, Karnataka 560068 | ||||||||||||||||||||||||||||||||||||||||||||||
Coordinates | 12°53′24′′N 77°38′21′′E / 12.88992°N 77.63929°E / 12.88992; 77.63929 | ||||||||||||||||||||||||||||||||||||||||||||||
Owned by | Bangalore Metro Rail Corporation Ltd (BMRCL) | ||||||||||||||||||||||||||||||||||||||||||||||
Operated by | Namma Metro | ||||||||||||||||||||||||||||||||||||||||||||||
Line(s) | Yellow Line | ||||||||||||||||||||||||||||||||||||||||||||||
Platforms | Side platform Platform-1 → Rashtreeya Vidyalaya Road Platform-2 → Delta Electronics - Bommasandra | ||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 2 | ||||||||||||||||||||||||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||||||||||||||||||||||||
Structure type | Elevated, Double track | ||||||||||||||||||||||||||||||||||||||||||||||
Platform levels | (TBC) | ||||||||||||||||||||||||||||||||||||||||||||||
Parking | (TBC) | ||||||||||||||||||||||||||||||||||||||||||||||
Accessible | (TBC) | ||||||||||||||||||||||||||||||||||||||||||||||
Architect | ITD - ITD Cementation India JV | ||||||||||||||||||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||||||||||||||||||
Status | Awaiting trainsets and ready for operations | ||||||||||||||||||||||||||||||||||||||||||||||
Station code | (TBC) | ||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||
Opening | May 2025; 48 days' time (May 2025) (TBC) | ||||||||||||||||||||||||||||||||||||||||||||||
Electrified | 750 V DC third rail | ||||||||||||||||||||||||||||||||||||||||||||||
Services | |||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||
|
Location | |
---|---|
Map |
Kudlu Gate is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India.
As per latest reports, the Yellow Line is slated to be operational around May 2025[1] [2] instead of April 2025[3] which was announced by the Karnataka Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.
History
[edit ]In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Kudlu Gate metro station along the 6.385 km Reach 5 – Package 2 section (Hosa Road - Bommanahalli) of the 18.825 km Yellow Line of Namma Metro. On 25 April 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[4] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.
Station layout
[edit ]Station Layout (TBC)
Kudlu Gate track layout (TBC) |
---|
P1 P2 |
Station with two tracks and two side platforms
|
Entry/Exits
[edit ]See also
[edit ]- Bengaluru
- List of Namma Metro stations
- Transport in Karnataka
- List of metro systems
- List of rapid transit systems in India
References
[edit ]- ^ "Bengaluru Metro Yellow Line To Become Operational By May 2025, Pink Line To Be Ready For Public Use By..." Times Now. 11 March 2025. Retrieved 12 March 2025.
- ^ "Bengaluru: Namma Metro Yellow Line From RV Road To Bommasandra, Connecting Electronics City, Set To Open By May 2025". English Jagran. 10 March 2025. Retrieved 12 March 2025.
- ^ "Bengaluru Metro plans to open yellow line in April with 4 trains, 30-min headway". Deccan Herald. Retrieved 7 January 2025.
- ^ "ITD-ITD Cem JV Lowest Bidder for B'lore Metro's Hosa Rd - HSR Layout". The Metro Rail Guy. 25 April 2017. Retrieved 24 October 2024.
External links
[edit ]- Bangalore Metro Rail Corporation Ltd. (Official site)
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.