Jump to content
Wikipedia The Free Encyclopedia

BTM Layout metro station

Upcoming Namma Metro station under Yellow Line
BTM Layout
Namma Metro station
Final stages of construction from Ragigudda - Central Silk Board Flyover
General information
LocationMarenahalli/Outer Ring Road, BTM Layout, Bengaluru, Karnataka 560076
Coordinates12°55′00′′N 77°36′30′′E / 12.91656°N 77.60825°E / 12.91656; 77.60825
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics - Bommasandra
Tracks2
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
ArchitectHCC - URC Construction JV
Other information
StatusAwaiting trainsets and ready for operations
Station code(TBC)
History
OpeningMay 2025; 48 days' time (May 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Jayadeva Hospital Yellow Line
(Operational around May 2025)
Central Silk Board
towards Bommasandra
Route map
BTM Layout
Central Silk Board
Under construction
Bommanahalli
Hongasandra
Kudlu Gate
Singasandra
Hosa Road
Beratena Agrahara
Electronic City
Infosys Foundation Konappana Agrahara
Huskur Road
Biocon Hebbagodi
Mainline rail interchange Hebbagodi Depot (U/C)
Delta Electronics - Bommasandra
Location
Map

BTM Layout is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India.

As per latest reports, the Yellow Line is slated to be operational around May 2025[1] [2] instead of April 2025[3] which was announced by the Karnataka Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.

History

[edit ]

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the BTM Layout metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Construction JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[4] Consequently, the contract was successfully awarded to the joint venture, which then commenced construction of the metro station in accordance with the agreements.

Station layout

[edit ]

Station Layout (TBC)

BTM Layout track layout (TBC)
P1
P2
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics - Bommasandra
Next Station: Central Silk Board
Change at the next station for Blue Line
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Jayadeva Hospital
Change at the next station for Pink Line
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

[edit ]
[icon]
This section is empty. You can help by adding to it. (December 2024)

See also

[edit ]

References

[edit ]
[edit ]
Wikimedia Commons has media related to Namma Metro.
Wikivoyage has a travel guide for Bengaluru .
Awaiting
Trainsets
Planned
  • Narayana Hospital
  • Chandapura
  • Attibele Industrial Area
  • Attibele
  • Zuzuvadi
  • Hosur SIPCOT Park 1
  • Hosur Bus Terminal Interchange
  • Hosur SIPCOT Park 2
Depot(s)
See also
*Stations in italics are Under Construction

AltStyle によって変換されたページ (->オリジナル) /