Jump to content
Wikipedia The Free Encyclopedia

Bundesautobahn 143

From Wikipedia, the free encyclopedia
Federal motorway in Germany
You can help expand this article with text translated from the corresponding article in German. (January 2025) Click [show] for important translation instructions.
  • Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
  • Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
  • You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing German Wikipedia article at [[:de:Bundesautobahn 143]]; see its history for attribution.
  • You may also add the template {{Translated|de|Bundesautobahn 143}} to the talk page.
  • For more guidance, see Wikipedia:Translation.
A 143
Bundesautobahn 143
Route information
Length9 km (5.6 mi)
Major junctions
North endBennstedt, Saalekreis
South endBad Lauchstädt, Saalekreis
Location
CountryGermany
StatesSaxony-Anhalt
Highway system
  • Roads in Germany
A 117 A 210

Bundesautobahn 143 (translates from German as Federal Motorway 143, short form Autobahn 143, abbreviated as BAB 143 or A 143) is an autobahn in Saxony-Anhalt, Germany. The A 143 comprises the western leg of the Mitteldeutsche Schleife (Central German Loop), a beltway around the cities of Halle an der Saale and Leipzig. 9 km of the planned 22 km route have been completed, due to the autobahn's path potentially disturbing an environmentally sensitive area.

History

[edit ]

After reunification, the A 143 was one of the first projects to begin planning under the new government. The A 143 project was placed under top priority in the Bundesverkehrswegeplan (Federal Transport Infrastructure Plan) of 1992, and the original plan was for at least part of the highway to open within a year. However, the A 143's path goes through an environmentally sensitive area, part of which is protected by the Habitats Directive. The southernmost 9 km was not built and opened until July 11, 2005.[1] Construction on the remaining 12.6 km is currently blocked from proceeding after a successful lawsuit by the Naturschutzbund Deutschland (NABU). According to the NABU, the highway threatens the habitats of great crested newts, European polecats, and some 25 different species of dragonflies. DEGES plans to meet all of NABU's concerns and restart construction by 2011, but the NABU and most local residents are still opposed to the project, and the NABU intends to continue using lawsuits to stop construction.

The 18-year delay in construction has added an estimated 70 million to the project's initial projected cost of 80ドル million.

Exit list

[edit ]
This section is missing a table that represents a list of exits or junctions.
Please help by adding the missing exit or junction list . (December 2021)
Tunnel Porphyrkuppen 250 m (planned)
Salzmünde 958 m (planned)
Tunnel 207 m (planned)
Salzmünde (planned)
Talbrücke Benkendorfer Bach 250 m (planned)
Rest area (planned)
Grünbrücke (planned)

Rest area Pappelgrund
(5) Holleben
(6) Halle-Süd 3-way interchange A 38

References

[edit ]
  1. ^ "BAB A 38 / A 143". Land Sachsen-Anhalt. Archived from the original on September 14, 2012.
Major routes
German Autobahn symbol
German Autobahn symbol
Regional
routes
Local routes
Planned or
former routes
See also
  • * original plan: number is used by another route now

AltStyle によって変換されたページ (->オリジナル) /