From Wikipedia, the free encyclopedia
Specialized data centers designed for artificial intelligence
An editor has expressed concern that this article may have a number of irrelevant and questionable citations . Relevant discussion may be found on the talk page. Please help improve this article by verifying these references and challenge or remove any that are not reliable or do not support the article. (June 2026) (Learn how and when to remove this message)

An AI data center is a specialized data center facility designed for the computationally intensive tasks of training and running inference for artificial intelligence (AI) and machine learning models. Unlike general-purpose data centers, they are optimized for the parallel processing demands of AI workloads, typically using hardware such as AI accelerators (e.g., GPUs, TPUs) and high-speed interconnects.

The global push to construct these specialized facilities accelerated dramatically during the AI boom of the 2020s. Memory manufacturers prioritized production of High Bandwidth Memory (HBM) essential for AI servers, which led to a global memory supply shortage amid a broader competition for advanced chips, power, and infrastructure.[1] [2] [3] [4] 70% of memory production in 2026 is going to data centers, primarily AI data centers.[5] Quote from article: "..., AI factories are pre-booking entire year's worth of supply, leading to severe shortages in the smartphone and PC segments. And the majority of the new production lines will be focused on AI-specific DRAM such as HBM."[6]

Major tech companies are estimated to spend 650ドル billion on AI data centers in 2026.[7] [8]

Architecture

[edit ]

Data centers for building and running large machine learning models contain specialized computer chips, GPUs, that use 2 to 4 times as much energy as their regular CPU counterparts (250-500 watts).[9] [10]

AI data centers use 60 or more kilowatts per server rack, whereas more standard data centers typically use 5 to 10 kilowatts per rack.[11]

Operators

[edit ]

As of August 2025, The Information tracked 18 planned or existing AI data centers in the United States, operated by Amazon Web Services, CoreWeave, Crusoe, Meta, Microsoft/OpenAI, Oracle, Tesla, and xAI.[12] Other AI data center operators include Digital Realty and Alibaba.[13] Data centers are also being built in China, India, Europe,[13] Saudi Arabia,[14] and Canada.[15] The New Yorker described CoreWeave as the most prominent AI data center operator in the United States.[16]

Two types of data center providers for machine learning have been noted: hyperscalers and neoclouds. The Verge listed large technology companies such as Google, Meta, Microsoft, Oracle and Amazon as hyperscalers.[17] The New York Times described neoclouds as "a new generation of data center providers". CoreWeave, Nebius, Nscale, and Lambda have been described as examples of neoclouds.[18]

In January 2025, OpenAI, in partnership with Oracle and Softbank, announced the Stargate project, which as of September 2025 is composed of six built or proposed AI data centers in the United States.[19]

In response to the Stargate project, Amazon launched in October 2025 an AI data center on 1,200 acres of farmland in Indiana. This data center, known as Project Rainier, is one of the largest AI data centers in the world, with Amazon spending 11ドル billion on the project. Rainier is specifically intended for training and running machine learning models from Anthropic.[20] As of that time, this facility contains seven data centers (out of an estimated 30 planned) and will use 2.2 gigawatts of electricity (equivalent to 1 million households) and millions of gallons of water per year. Computer chips from Annapurna Labs and Anthropic, Trainium 2, were designed for use in such facilities. Amazon pumped millions of gallons of water out of the ground to construct the data center, and as of June 2025, Indiana state officials are investigating whether this dewatering process led to dry wells for local residents.[21]

In November 2025, Anthropic announced a plan in partnership with Fluidstack to develop artificial intelligence infrastructure in the United States, including data centers in New York and Texas, worth 50ドル billion.[22]

Other AI data center projects include the Colossus supercomputer from xAI, a Louisiana-based project from Meta, Hyperion, expected to use 5 GW of power, and a second Ohio-based Meta project, Prometheus, with a capacity of 1 GW.[23] A 3,200-acre AI data center, capable of 4.4-4.5 GW of power and located on the decommissioned Homer City Generating Station, is under construction as of 2025, and will use seven 30-acre gas generating stations supplied by EQT.[24] [25]

As of December 2025, CRH is working on over 100 data centers in the United States.[26]

In 2025, ExxonMobil and NextEra announced plans to build a data center powered by natural gas and using carbon capture technology, with 1.2 GW of power capacity. They previously purchased 2,500 acres of land in the Southeastern United States and plan to market the data center to an artificial intelligence company.[27]

The increased interest in AI data centers has led to several executives from companies in that space becoming billionaires, including CoreWeave, QTS, Nebius, Astera Labs, Groq, Fermi (which is connected to former United States Secretary of Energy Rick Perry), Snowflake and Cipher Mining.[28]

Several companies involved in cryptocurrency mining, such as Bitdeer, CoreWeave,[29] Cipher Mining, TeraWulf,[30] IREN, Core Scientific, and CleanSpark[31] have also been involved with AI data centers.

Finances

[edit ]

Between January and August 2024, Microsoft, Meta, Google and Amazon collectively spent 125ドル billion on AI data centers.[32] Citigroup forecasted that 2ドル.8 trillion would be spent on AI data centers by 2030,[13] while McKinsey and Company estimated that almost 7ドル trillion would be spent globally by that time.[33] According to S&P Global, 61ドル billion has been spent on the data center market as a whole in 2025, while debt issuance for data centers was 182ドル billion during the same year.[34]

Large technology companies have offloaded the financial risks of building AI data centers by setting up special purpose vehicles or by contracting with neoclouds. For example, Meta's Hyperion was mostly funded by Blue Owl Capital, which did so using a bond offering from PIMCO. Those bonds were sold to a number of clients, including BlackRock. Meta did not borrow money itself and instead established a special purpose vehicle from which it would rent the data center.[18] This deal was structured by Morgan Stanley for 30ドル billion, the largest known private capital transaction as of 2025.[29]

Neoclouds such as CoreWeave have gone into debt to buy computer chips from Nvidia for their data centers, and the chips themselves have been used for loan collateral. As of December 2025, CoreWeave took out three GPU-backed loans, collectively worth 12ドル.4 billion, from private credit firms (Blackstone, Coatue, BlackRock, PIMCO) and from banks (Goldman Sachs, JPMorgan Chase, Wells Fargo). Thus, these companies provide an indirect connection between private credit and established banks. Data centers have also established asset-backed securities, and debt for data centers has its own derivative financial products.[17]

The real estate industry, including asset managers, public companies and private investors, has also invested in data centers.[35]

Energy sourcing

[edit ]
This section is an excerpt from Data center § Energy use.[edit ]
Fueled by growth in artificial intelligence, data centers' demand for power increased in the 2020s.[36]
Google Data Center, The Dalles, Oregon

Energy consumption and the environmental impacts it creates are a central issue for data centers.[37] [38] Power draw ranges from a few kilowatts (kW) for small server racks to several tens of megawatts (MW) for large facilities. Modern hyperscale data centers can exhibit power densities exceeding 100 times those of conventional office buildings, primarily due to the high concentration of servers and cooling systems required to manage continuous digital workloads.[39] For higher power density facilities, electricity costs are a dominant operating expense and account for over 10% of the total cost of ownership (TCO) of a data center.[40]

As of 2024, data centers in the U.S. are primarily powered by natural gas, which supplies 40% of their electricity (with renewable energy at 24%, nuclear at about 20%, and coal at about 15%).[41] The Associated Press reported that electricity for AI data centers in the U.S. would likely come from natural gas or oil, as companies prefer using currently available power plants, which primarily use fossil fuels. Fossil energy is also often cheaper in locations where data centers are developed, and experts believe that energy demands from generative AI and data centers would be difficult to fulfill with renewable energy alone. Some companies such as Google, Amazon, and Meta have expressed interest in nuclear power for their data centers.[42] As of 2020, according to the IEA, solar photovoltaic-generated electricity is at its lowest cost in history.[43] Other data centers, including xAI's Colossus, OpenAI's Stargate, and Meta's Prometheus use their own off-grid natural gas plants.[44] [45] Electric vehicle and lithium-ion batteries have also been used for powering data centers, including for Colossus.[46] [47]

Power utility companies make upgrades to their infrastructure to handle demands of new data centers, and the price for these changes typically falls on residential or smaller commercial consumers.[41] [42] [48] In 2025, the Mountain Valley Pipeline announced plans to expand its capacity by 25% to meet energy needs for data centers.[49]

In December 2025, the Federal Energy Regulatory Commission (FERC) published a unanimous order allowing data centers in the U.S. to have a direct connection with power plants.[50] United States Secretary of Energy Chris Wright expressed support for un-retiring coal plants to power AI data centers.[51] Electricity demands from AI data centers have slowed or reversed the retirement of peaking power plants in the U.S.[52] For example, in 2025, Southern Company announced that energy use from data centers would prevent the company from retiring coal-fired power plants as it had earlier promised.[49] In Nevada, the Desert Research Institute (DRI) calculated that 35% of the state's energy production could go to data centers by the year 2030 if all projects planned in the state as of 2026 are completed.[53] DRI also stated, in areas where there are clusters of data centers, local consumers may end up paying the extra cost of expanding infrastructure.[53]

Environmental footprint

[edit ]

Average AI data centers have an electricity footprint equivalent to 100,000 households, and use billions of gallons of water for cooling their hardware.[54] In 2025, the International Energy Agency estimated that the larger AI data centers currently under construction could consume as much electricity as 2 million households.[9] A 2024 report from the United States Department of Energy stated that data centers overall used 17 billion gallons of water per year in the United States, primarily due to "rapid proliferation of AI servers", and that this usage was forecasted to grow to nearly 80 billion gallons by 2028.[33] Researchers estimated that AI data centers in the United States would emit 24-44 million metric tons of carbon dioxide and use 731–1,125 million cubic meters of water per year between 2024 and 2030.[55]

Peaking power plants, which have been proposed as a power source for AI data centers, emit sulfur dioxide and have historically been located disproportionately near communities of color in the United States.[56]

Reciprocating internal combustion engines, proposed as another power source for a data center, emit PM 2.5, nitrogen oxides, and volatile organic compounds.[57]

AI data centers in the United States

[edit ]
Data center infrastructure in the United States (2025)

In the United States, both the Biden administration and second Trump administration supported the construction of AI data centers. In January 2025, then-president Joe Biden signed an executive order for federal government agencies to support AI data centers on federal sites built by private companies, study their effect on energy prices, and encourage their use of renewable energy.[58] In April 2025, the United States Department of Energy suggested 16 possible sites, including Los Alamos National Laboratory, Sandia National Laboratories and Oak Ridge National Laboratory.[59] In its July 2025 AI Action Plan, the second Trump administration supported increased production of AI data centers.[60]

Several US states have incentivized local data center construction.[61] For example, in 2024, lawmakers in Michigan approved tax breaks for data center equipment and construction material.[62] Some data center companies have also invested or promised to invest in the infrastructure of local communities.[63] [64]

In December 2025, Democratic senators Elizabeth Warren, Chris Van Hollen, and Richard Blumenthal wrote to seven technology companies (Google, Microsoft, Amazon, Meta, CoreWeave, Digital Realty, and Equinix) that they will investigate the effects of those companies' operations on consumer energy bills, highlighting AI data centers in particular.[65] That same month, 25 Democratic lawmakers wrote to the inspector general of the United States Department of Commerce over possible conflict of interest concerns involving secretary of commerce Howard Lutnick and AI data centers. Lutnick met with a co-founder of Fermi, which proposed an AI data center project financed by Cantor Fitzgerald and Newmark Group.[66]

AI Infrastructure Coalition (AIIC), an organization led by Brian O. Walsh, Kyrsten Sinema, and Garret Graves, has supported Trump's AI Action Plan,[67] with Sinema becoming personally involved in a local meeting on an AI data center in Arizona.[68] Venture capital firm Andreessen Horowitz, Big Tech companies (Google, Meta, Microsoft), telecommunications companies (Cisco, Corning Inc., Lumen Technologies), data center providers (Digital Realty, QTS), energy companies (Duke Energy, Entergy, ExxonMobil, NextEra Energy), and utility companies (PG&E, Pinnacle West Capital) are members of AIIC as of November 2025.[67] AIIC has been supported by Hogan Lovells.[68]

Concerns and opposition

[edit ]

Some analysts have expressed concerns about overbuilding of AI data centers, warning that their infrastructure risks obsolescence due to changes in demand and technology.[26] Estimates for the lifespan of the GPUs used to power data centers range from one to eight years.[69] [70] By contrast, CPUs in more traditional data centers have a shelf life of about 5–7 years. Machine learning model training causes significant stress on computer chips.[71]

The increased costs and shortages of computer memory, including High Bandwidth Memory, DRAM and NAND flash memory, have been attributed to the AI data center boom.[1] [72] [73] Increased prices and smaller memory storage for smart devices have also been linked to the AI data center boom.[74] An agreement with Samsung and SK Hynix would supply the Stargate project with 900,000 DRAM wafers per month, about 40% of all DRAM produced worldwide.[75]

Anti-data-center sentiment in rural Kansas neighborhood

Advocates have also linked data center construction to the AI bubble.[76] [77] Wisconsin Watch expressed concern that data centers could become stranded assets in the context of an AI bubble, leaving energy customers to pay for the costs.[78] Journalists have warned that the large number of links between actors and organizations in the AI ecosystem[17] as well as the large number of companies involved[29] each indicate strong risks for the global economy and financial markets.

A hedge fund founder questioned the economics of AI data centers, concluding that they need about 1ドル trillion of revenue for profitability.[79]

In November 2025, the North American Electric Reliability Corporation warned that building new data centers could negatively affect the electrical grid and cause power outages during extreme weather.[80] The independent monitor of PJM Interconnection warned that its power grid cannot support new data centers and supported a federal moratorium on data centers.[24]

Machine learning developers, when training large language models, often use data centers at their full capacity, conflicting with other users (including households) during peak usage, which may lead to blackouts.[80]

Power disruptions in data centers can cause errors in machine learning model calculations ("silent data corruption").[81]

Large technology companies who are building data centers have asked public officials and land owners to sign non-disclosure agreements and have appeared to use shell companies.[82] In one case, when a joint OpenAI-Oracle data center was rejected by Saline Township in Michigan, landowners and developers responded by suing the town.[62] [83] The developers acquired the land from the resulting settlement. The Michigan Public Service Commission approved DTE Energy to provide power to the data center, part of Stargate. The approval was part of an ex parte motion, with no public input.[63]

In 2025, over 230 groups have signed a letter supporting a moratorium on constructing AI data centers in the United States, concerned by impact on the environment and energy bills. Signatories include Food & Water Watch, Greenpeace, Friends of the Earth and Physicians for Social Responsibility.[84] Senator Bernie Sanders has also supported a moratorium on AI data centers.[85]

Ashley LaMont, of Honor the Earth, argued that data centers on tribal lands would not help Native Americans obtain data sovereignty.[86]

The NAACP has also expressed opposition to AI data centers.[87]

AI data centers in space

[edit ]

Several tech companies, including Starcloud, Google, Nvidia, Blue Origin and SpaceX, have announced projects for or otherwise expressed interest in building data centers in outer space.[88] [89] [90] [91] Google announced Project Suncatcher, which plans to test whether its Tensor Processing Unit (TPU) chips (which are specifically designed for machine learning) can function in the environment of space. The company aims to deploy satellites with these chips in a data center by 2027.[92] In November 2025, Starcloud, a startup supported by Nvidia, launched a satellite with an Nvidia H100 GPU that the company used to deploy and develop a large language model. CNBC reported that this model, NanoGPT, was the first model trained in space. Starcloud deployed a second model based on Google's Gemma.[93]

References

[edit ]
  1. ^ a b Jin, Hyunjoo; Potkin, Fanny; Lee, Wen-Yee; Bridge, Anton; Cherney, Max A. (2025年12月03日). "The AI frenzy is driving a memory chip supply crisis". Reuters. Retrieved 2025年12月25日.{{cite web}}: CS1 maint: deprecated archival service (link)
  2. ^ "Surging memory chip prices dim outlook for consumer electronics makers". Reuters.
  3. ^ https://www.ncta.com/wp-content/uploads/2026/06/Industry-Coalition-Letter-re-Memory-Shortage.pdf
  4. ^ "Memory Chip Shortage 2026: HBM Takes 23% of DRAM Wafers". 19 March 2026.
  5. ^ published, Bruno Ferreira (2026年01月18日). "Data centers will consume 70 percent of memory chips made in 2026 - supply shortfall will cause the chip shortage to spread to other segments". Tom's Hardware. Retrieved 2026年06月10日.
  6. ^ Mujtaba, Hassan (2026年04月19日). "Memory Makers Will Only Meet 60% of DRAM Demand Through 2027, Locking In Years of Shortages and Price Pain". Wccftech. Retrieved 2026年06月10日.
  7. ^ "How much is big tech spending on AI computing a staggering 650ドル billion in 2026?". Bloomberg. 6 February 2026.
  8. ^ Swartz, Jon (2026年02月06日). "The 650ドル Billion Bet: Big Tech's AI Spending Blitz Rewrites Corporate Checkbook". Techstrong.ai. Retrieved 2026年02月07日.
  9. ^ a b Leppert, Rebecca (2025年10月24日). "What we know about energy use at U.S. data centers amid the AI boom". Pew Research Center . Archived from the original on 2025年12月13日. Retrieved 2025年12月17日.
  10. ^ Metz, Cade; Weise, Karen; Hernandez, Marco; Isaac, Mike; Singhvi, Anjali (2025年03月17日). "How A.I. Is Changing the Way the World Builds Computers". The New York Times . ISSN 0362-4331. Archived from the original on 2025年10月23日. Retrieved 2025年12月17日.
  11. ^ "Definition of AI datacenter". PCMag . Archived from the original on 2024年10月16日. Retrieved 2025年12月21日.
  12. ^ "AI Data Center Locations: Map of the World's Supercomputers". The Information . Retrieved 2025年12月17日.{{cite web}}: CS1 maint: deprecated archival service (link)
  13. ^ a b c Booth, Robert; Fischer, Harry; Amitrano, Alessia; Herman, Tara (2025年12月01日). "'It's going much too fast': the inside story of the race to create the ultimate AI". The Guardian . ISSN 0261-3077. Archived from the original on 2025年12月17日. Retrieved 2025年12月17日.
  14. ^ Satariano, Adam; Mozur, Paul (2025年11月19日). "Saudi Arabia Backs Elon Musk's xAI With Data Center Deal". The New York Times . Retrieved 2025年12月17日.{{cite web}}: CS1 maint: deprecated archival service (link)
  15. ^ Berg, Nate (2025年07月31日). "Hot and power-hungry: 'Manhattan-sized' data centers are just the beginning". Fast Company . Retrieved 2025年12月17日.{{cite web}}: CS1 maint: deprecated archival service (link)
  16. ^ Witt, Stephen (2025年10月27日). "Inside the Data Centers That Train A.I. and Drain the Electrical Grid". The New Yorker . ISSN 0028-792X. Archived from the original on 2025年12月15日. Retrieved 2025年12月17日.
  17. ^ a b c Lopatto, Elizabeth (2025年12月22日). "Chipwrecked: Can Nvidia avoid the crash?". The Verge . Archived from the original on 2025年12月24日. Retrieved 2025年12月25日.
  18. ^ a b Weise, Karen; Tan, Eli (2025年12月15日). "How Tech's Biggest Companies Are Offloading the Risks of the A.I. Boom". The New York Times . Retrieved 2025年12月25日.{{cite web}}: CS1 maint: deprecated archival service (link)
  19. ^ O'Brien, Matt (2025年09月23日). "OpenAI shows off Stargate AI data center in Texas and plans 5 more elsewhere with Oracle, Softbank". Associated Press . Archived from the original on 2025年10月09日. Retrieved 2025年12月21日.
  20. ^ Sigalos, MacKenzie (2025年10月29日). "Amazon opens 11ドル billion AI data center in rural Indiana as rivals race to break ground". CNBC . Archived from the original on 2025年12月15日. Retrieved 2025年12月17日.
  21. ^ Weise, Karen; Metz, Cade (2025年06月24日). "At Amazon's Biggest Data Center, Everything Is Supersized for A.I." The New York Times . Archived from the original on 2025年10月22日. Retrieved 2025年12月17日.
  22. ^ Sigalos, MacKenzie (2025年11月12日). "Anthropic to spend 50ドル billion on U.S. AI infrastructure, starting with Texas, New York data centers". CNBC . Archived from the original on 2025年12月15日. Retrieved 2025年12月17日.
  23. ^ Zeff, Maxwell (2025年07月14日). "Mark Zuckerberg says Meta is building a 5GW AI data center". TechCrunch . Archived from the original on 2025年10月20日. Retrieved 2025年12月17日.
  24. ^ a b Halper, Evan; Kommenda, Niko (2025年12月15日). "Supersized data centers are coming. See how they will transform America". The Washington Post . Archived from the original on 2025年12月17日. Retrieved 2025年12月17日.
  25. ^ Suttles, Chrissy (2025年04月02日). "Homer City to become gas-powered data center campus". Axios . Retrieved 2025年12月17日.{{cite web}}: CS1 maint: deprecated archival service (link)
  26. ^ a b Berg, Nate (2025年12月05日). "The unexpected winner of the AI data center boom". Fast Company . Retrieved 2025年12月17日.{{cite web}}: CS1 maint: deprecated archival service (link)
  27. ^ Kimball, Spencer (2025年12月08日). "NextEra working with Exxon to develop gigawatt data center for hyperscaler". CNBC . Archived from the original on 2025年12月15日. Retrieved 2025年12月17日.
  28. ^ "The New Billionaires Behind the AI Data Center Boom". Bloomberg News . 2025年11月21日. Retrieved 2025年12月17日.{{cite web}}: CS1 maint: deprecated archival service (link)
  29. ^ a b c Nicoletti, Leonardo; Doan, Lynn; Bass, Dina (2025年12月21日). "AI Data Center Gold Rush Driven by Thousands of Newcomers". Bloomberg News . Retrieved 2025年12月25日.{{cite web}}: CS1 maint: deprecated archival service (link)
  30. ^ Pan, David (2025年11月04日). "Bitcoin Miners Are Finding Promised AI Panacea Can Be Elusive". Bloomberg News . Retrieved 2025年12月25日.{{cite news}}: CS1 maint: deprecated archival service (link)
  31. ^ Huang, Vicky Ge (2025年12月24日). "Bitcoin Miners Thrive Off a New Side Hustle: Retooling Their Data Centers for AI". The Wall Street Journal . Retrieved 2025年12月25日.{{cite web}}: CS1 maint: deprecated archival service (link)
  32. ^ Nguyen, Britney (2024年12月30日). "How many billions Big Tech spent on AI data centers in 2024". Quartz . Archived from the original on 2025年08月09日. Retrieved 2025年12月17日.
  33. ^ a b Kerr, Dara (2025年12月04日). "The AI boom is heralding a new gold rush in the American west". The Guardian . ISSN 0261-3077. Archived from the original on 2025年12月15日. Retrieved 2025年12月17日.
  34. ^ Roach, April (2025年12月19日). "Data center deals hit record 61ドル billion in 2025 amid construction frenzy". CNBC . Archived from the original on 2025年12月24日. Retrieved 2025年12月25日.
  35. ^ Parker, Will (2025年12月23日). "The AI Boom Is Opening Up Commercial Real-Estate Investing to New Risks". The Wall Street Journal . Retrieved 2025年12月25日.{{cite web}}: CS1 maint: deprecated archival service (link)
  36. ^ Bhattarai, Abha; Lerman, Rachel (25 December 2025). "10 charts that show where the economy is heading / 3. AI related investments". The Washington Post. Source: MSCI{{cite news}}: CS1 maint: deprecated archival service (link)
  37. ^ Whitehead, Beth; Andrews, Deborah; Shah, Amip; Maidment, Graeme (December 2014). "Assessing the environmental impact of data centres part 1: Background, energy use and metrics". Building and Environment. 82: 151–159. Bibcode:2014BuEnv..82..151W. doi:10.1016/j.buildenv.2014年08月02日1.
  38. ^ Siddik, Md Abu Bakar; Shehabi, Arman; Marston, Landon (June 2021). "The environmental footprint of data centers in the United States". Environmental Research Letters. 16 (6): 064017. Bibcode:2021ERL....16f4017S. doi:10.1088/1748-9326/abfba1. hdl:10919/109747 .
  39. ^ "Migrating to an HPDC". US English.
  40. ^ J. Koomey, C. Belady, M. Patterson, A. Santos, K.D. Lange: Assessing Trends Over Time in Performance, Costs, and Energy Use for Servers Released on the web August 17, 2009.
  41. ^ a b Leppert, Rebecca (2025年10月24日). "What we know about energy use at U.S. data centers amid the AI boom". Pew Research Center . Archived from the original on 2025年12月13日. Retrieved 2025年12月17日.
  42. ^ a b "Trump's AI plan calls for massive data centers. Here's how it may affect energy in the US". Associated Press . 2025年07月24日. Archived from the original on 2025年10月22日. Retrieved 2025年12月17日.
  43. ^ Staff, Carbon Brief (2020年10月13日). "Solar is now 'cheapest electricity in history', confirms IEA". Carbon Brief. Retrieved 2026年04月28日.
  44. ^ Berg, Nate (2025年07月31日). "Hot and power-hungry: 'Manhattan-sized' data centers are just the beginning". Fast Company . Retrieved 2025年12月17日.{{cite web}}: CS1 maint: deprecated archival service (link)
  45. ^ "The power crunch threatening America's AI ambitions". Financial Times . Retrieved 2025年12月17日.{{cite web}}: CS1 maint: deprecated archival service (link)
  46. ^ Carter, Tom (2025年12月16日). "Ford is pulling back on EVs and getting in on the AI boom". Business Insider . Retrieved 2025年12月17日.{{cite web}}: CS1 maint: deprecated archival service (link)
  47. ^ Tabuchi, Hiroko; Plumer, Brad; Stevens, Harry (2025年12月23日). "The Pentagon and A.I. Giants Have a Weakness. Both Need China's Batteries, Badly". The New York Times . Retrieved 2025年12月25日.{{cite web}}: CS1 maint: deprecated archival service (link)
  48. ^ "The AI explosion means millions are paying more for electricity". The Washington Post. 2025年07月27日. ISSN 0190-8286 . Retrieved 2026年03月19日.
  49. ^ a b Chen, Amber X. "A.I. Is on the Rise, and So Is the Environmental Impact of the Data Centers That Drive It". Smithsonian Magazine. Retrieved 2026年03月19日.
  50. ^ Levy, Marc (2025年12月18日). "Feds pave the way for Big Tech to plug data centers right into power plants in scramble for energy". Associated Press . Archived from the original on 2025年12月19日. Retrieved 2025年12月25日.
  51. ^ Chow, Andrew R. "Trump's Energy Secretary Wants Data Centers Everywhere". Time . Archived from the original on 2025年12月21日. Retrieved 2025年12月25日.
  52. ^ Kearney, Laila (2025年12月23日). "AI data centers are forcing obsolete 'peaker' power plants back into service". Reuters . Retrieved 2025年12月25日.{{cite web}}: CS1 maint: deprecated archival service (link)
  53. ^ a b "Commentary: A surge in Nevada data center construction threatens the electricity supply for 49,000 Californians". Los Angeles Times. 2026年05月19日. Archived from the original on 2026年05月20日. Retrieved 2026年05月25日.
  54. ^ Copley, Michael (2025年10月14日). "Data centers are booming. But there are big energy and environmental risks". NPR . Archived from the original on 2025年10月16日. Retrieved 2025年12月17日.
  55. ^ Xiao, Tianqi; Nerini, Francesco Fuso; Matthews, H. Damon; Tavoni, Massimo; You, Fengqi (2025年11月10日). "Environmental impact and net-zero pathways for sustainable artificial intelligence servers in the USA". Nature Sustainability. 8 (12): 1541–1553. Bibcode:2025NatSu...8.1541X. doi:10.1038/s41893-025-01681-y . hdl:11311/1309509 . ISSN 2398-9629.
  56. ^ Kearney, Laila (2025年12月23日). "AI data centers are forcing obsolete 'peaker' power plants back into service". Reuters . Retrieved 2025年12月25日.{{cite web}}: CS1 maint: deprecated archival service (link)
  57. ^ Kann, Drew (2025年12月19日). "A new Georgia data center could be powered by RICE. It's not the kind you eat". The Atlanta Journal-Constitution . Archived from the original on 2025年12月24日. Retrieved 2025年12月25日.
  58. ^ Parvini, Sarah (2025年01月14日). "Biden signs ambitious order to bolster energy resources for AI data centers". Associated Press . Archived from the original on 2025年09月23日. Retrieved 2025年12月18日.
  59. ^ O’brien, Matt (2025年04月03日). "US energy department invites AI data center development at Los Alamos and other federal lands". Associated Press . Archived from the original on 2025年08月04日. Retrieved 2025年12月18日.
  60. ^ "Trump's AI plan calls for massive data centers. Here's how it may affect energy in the US". Associated Press . 2025年07月24日. Archived from the original on 2025年10月22日. Retrieved 2025年12月17日.
  61. ^ Levy, Marc (2025年05月31日). "States are rolling out red carpets for data centers. But some lawmakers are pushing back". Associated Press . Archived from the original on 2025年10月01日. Retrieved 2025年12月25日.
  62. ^ a b Larson, Lucas Smolcic (2025年11月25日). "A wave of big AI data centers targets Michigan. Here's what to know". MLive Media Group . Archived from the original on 2025年12月16日. Retrieved 2025年12月17日.
  63. ^ a b Dellinger, A. J. (2025年12月19日). "OpenAI's Stargate Data Center Approved in Michigan as American Anger Starts to Boil". Gizmodo . Retrieved 2025年12月25日.{{cite web}}: CS1 maint: deprecated archival service (link)
  64. ^ Merica, Dan; Bedayn, Jesse (2024年12月05日). "As data centers proliferate, conflict with local communities follows". Associated Press . Archived from the original on 2025年10月20日. Retrieved 2025年12月25日.
  65. ^ Penn, Ivan; Weise, Karen (2025年12月16日). "Senators Investigate Role of A.I. Data Centers in Rising Electricity Costs". The New York Times . Retrieved 2025年12月18日.{{cite web}}: CS1 maint: deprecated archival service (link)
  66. ^ Rothfeld, Michael; Swanson, Ana (2025年12月18日). "Democratic Lawmakers Request Review of Commerce Secretary's Possible Conflicts". The New York Times . Retrieved 2025年12月21日.{{cite web}}: CS1 maint: deprecated archival service (link)
  67. ^ a b Allen, Mike (2025年11月19日). "Exclusive: AI Infrastructure Coalition launches to push pro-AI policies". Axios . Retrieved 2025年12月25日.{{cite web}}: CS1 maint: deprecated archival service (link)
  68. ^ a b Plautz, Jason (2025年12月12日). "Arizona city rejects data center after AI lobbying push". Politico . Retrieved 2025年12月25日.{{cite web}}: CS1 maint: deprecated archival service (link)
  69. ^ Leswing, Kif (2025年11月14日). "The question everyone in AI is asking: How long before a GPU depreciates?". CNBC . Retrieved 2025年12月17日.{{cite web}}: CS1 maint: deprecated archival service (link)
  70. ^ Barr, Alistair (2025年11月19日). "This big AI bubble argument is wrong". Business Insider . Retrieved 2025年12月17日.{{cite web}}: CS1 maint: deprecated archival service (link)
  71. ^ Duffy, Clare (2025年12月19日). "The big wrinkle in the multi-trillion-dollar AI buildout". CNN . Retrieved 2025年12月25日.{{cite web}}: CS1 maint: deprecated archival service (link)
  72. ^ Roth, Emma (2025年12月09日). "RAM is ruining everything". The Verge . Archived from the original on 2025年12月09日. Retrieved 2025年12月21日.
  73. ^ James, Luke (2025年10月03日). "AI data centers are swallowing the world's memory and storage supply, setting the stage for a pricing apocalypse that could last a decade". Tom's Hardware . Archived from the original on 2025年10月31日. Retrieved 2025年12月21日.
  74. ^ "Smart devices may become pricier as AI demand grows". NonStop Local KHQ . 2025年12月19日. Retrieved 2025年12月25日.{{cite web}}: CS1 maint: deprecated archival service (link)
  75. ^ Shilov, Anton (2025年10月01日). "OpenAI's Stargate project to consume up to 40% of global DRAM output — inks deal with Samsung and SK hynix to the tune of up to 900,000 wafers per month". Tom's Hardware . Archived from the original on 2025年12月14日. Retrieved 2025年12月25日.
  76. ^ Sonka, Joe (2025年12月09日). "The AI data center boom is coming for Kentucky. What will lawmakers do about it?". WKMS . Archived from the original on 2025年12月17日. Retrieved 2025年12月17日.
  77. ^ Callanan, Neil; Seligson, Paula (2025年12月12日). "AI Data Center Boom Sparks Fears of Glut Amid Lending Frenzy". Bloomberg News . Retrieved 2025年12月17日.{{cite web}}: CS1 maint: deprecated archival service (link)
  78. ^ Kertscher, Tom; Kiefer, Paul (2025年12月18日). "As energy-hungry data centers loom, Wisconsin ratepayers owe 1ドル billion on shuttered power plants". Wisconsin Watch . Retrieved 2025年12月25日.{{cite web}}: CS1 maint: deprecated archival service (link)
  79. ^ Wilkins, Joe (2025年10月10日). "AI Data Centers Are an Even Bigger Disaster Than Previously Thought". Futurism . Archived from the original on 2025年10月13日. Retrieved 2025年12月25日.
  80. ^ a b "The power crunch threatening America's AI ambitions". Financial Times . Retrieved 2025年12月17日.{{cite web}}: CS1 maint: deprecated archival service (link)
  81. ^ Tabuchi, Hiroko; Plumer, Brad; Stevens, Harry (2025年12月23日). "The Pentagon and A.I. Giants Have a Weakness. Both Need China's Batteries, Badly". The New York Times . Retrieved 2025年12月25日.{{cite web}}: CS1 maint: deprecated archival service (link)
  82. ^ Kainz, Natalie (2025年10月28日). "How Big Tech uses NDAs to hide AI data center details from Americans". NBC News . Archived from the original on 2025年12月16日. Retrieved 2025年12月17日.
  83. ^ Starr, Stephen (2025年12月16日). "Water levels across the Great Lakes are falling – just as US data centers move in". The Guardian . ISSN 0261-3077 . Retrieved 2025年12月17日.{{cite news}}: CS1 maint: deprecated archival service (link)
  84. ^ Brady, Jeff (2025年12月09日). "Environmental groups call for a moratorium on data center construction". NPR . Archived from the original on 2025年12月15日. Retrieved 2025年12月17日.
  85. ^ Shapero, Julia (2025年12月17日). "Sanders pushes for moratorium on AI data center construction". The Hill . Retrieved 2025年12月18日.{{cite web}}: CS1 maint: deprecated archival service (link)
  86. ^ Becenti, Arlyssa D. (2025年12月14日). "Is this Navajo community a site for a data center? Locals are worried". The Columbus Dispatch . Archived from the original on 2025年12月17日. Retrieved 2025年12月17日.
  87. ^ Geman, Ben (2025年12月15日). "AI data centers could charge Democratic primary fight". Axios . Retrieved 2025年12月18日.{{cite web}}: CS1 maint: deprecated archival service (link)
  88. ^ Decker, Audrey (2025年12月10日). "Data centers are the next space oddity". Politico . Retrieved 2025年12月18日.{{cite web}}: CS1 maint: deprecated archival service (link)
  89. ^ Hsu, Jeremy. "Space-Based Data Centers Could Power AI with Solar Energy—At a Cost". Scientific American . Archived from the original on 2025年12月18日. Retrieved 2025年12月18日.
  90. ^ Maidenberg, Micah; Peterson, Becky (2025年12月10日). "Exclusive | Bezos and Musk Race to Bring Data Centers to Space". The Wall Street Journal . Retrieved 2025年12月18日.{{cite web}}: CS1 maint: deprecated archival service (link)
  91. ^ Jin, Berber (2025年12月04日). "Sam Altman Has Explored Deal to Build Competitor to Elon Musk's SpaceX". The Wall Street Journal . Retrieved 2025年12月18日.{{cite web}}: CS1 maint: deprecated archival service (link)
  92. ^ Vicinanza, Domenico (2025年12月03日). "Data centres in space: will 2027 really be the year AI goes to orbit?". The Conversation . Archived from the original on 2025年12月17日. Retrieved 2025年12月18日.
  93. ^ Singh, Pia (2025年12月10日). "'Greetings, earthlings': Nvidia-backed Starcloud trains first AI model in space as orbital data center race heats up". CNBC . Archived from the original on 2025年12月15日. Retrieved 2025年12月18日.
[edit ]

Further reading

[edit ]
Concepts
Applications
Implementations
Audio–visual
Text
Decisional
Reasoning systems
People
Architectures
Political
Social and economic

AltStyle によって変換されたページ (->オリジナル) /