Our river projects worked for the flood in northern Kyushu, July 2012

Three days of extreme rainfall from July 11 to 14, 2012, named “2012 Kyushu-Hokubu-Gou”(heavy rain event in northern Kyushu) by Japan Meteorological Agency, caused the second water level in Ushizugawa river, following the 100-year flood in 1990. Our major projects worked for reduction of the risk during this flood on 13 July 2012. The projects includes Mutabe retarding pond, 900 thousand cubic meter capacity, after 1990 flood and riverbed dredging (200 thousand cubic meter) after 2009 flood (approximately 20-year flood).

1.Precipitation data in northern Kyushu

2.Water level in Ushizugawa river (Myokenbashi point)

3.Effect of the major projects tentatively reviewed by MLIT Takeo River Office


Picture (left: Mutabe retarding pond, right: inflow to the pond at 14:30 on 13 July 2012)

ホーム

沈黙の語り部たち-佐賀の災害歴史遺産調査報告-

六角川水系 流域治水プロジェクト

六角川 特定都市河川

六角川水系緊急治水対策プロジェクト

嘉瀬川水系流域治水プロジェクト 松浦川水系流域治水プロジェクト

災害に備えて

事務所の概要

六角川について

松浦川について

川のルール

アザメの瀬自然再生事業

佐賀水ネット

流域の生物

入札・契約情報

English Website

地域防災支援コーナー

カテゴリーメニュー

What weve done & What we do

メインメニュー

ページの先頭へ戻る

Copyright (C) 武雄河川事務所.All Rights Reserved.

AltStyle によって変換されたページ (->オリジナル) /