Transition in Development
Based on our experience in BWR construction and fuel recycling technologies and through open innovation, we have internationally developed advanced reactors that are capable of stably supplying power over the long term, reducing the initial investment risk, and reducing the harmfulness of radioactivity.
- Kashiwazaki 6/7 : Tokyo Electric Power Company Holdings, Inc. Kashiwazaki-Kariwa Nuclear Power Station Unit 6/Unit 7
- Hamaoka 5 : Chubu Electric Power Co., Inc., Hamaoka Nuclear Power Station Unit 5
- Shika 2 : Hokuriku Electric Power Co., Inc., Shika Nuclear Power Station Unit 2
- Shimane 3 : The Chugoku Electric Power Co., Inc., Shimane Nuclear Power Station Unit 3
- Ohma : Electric Power Development Co., Ltd., Ohma Nuclear Power Station (Under construction)
- Higashidori1/2 : Tokyo Electric Power Company Holdings, Inc., Higashidori Nuclear Power Station Unit 1(Under construction)Unit 2(Planned)
- Kaminoseki : The Chugoku Electric Power Co., Inc., Kaminoseki Nuclear Power Station(Planned)
- ABWR : Advanced Boiling Water Reactor
- ESBWR : Economic Simplified Boiling Water Reactor
- RBWR : Resource Renewable Boiling Water Reactor
- PRISM : Power Reactor Innovative Small Module
- HI-ABWR : Highly Innovative Advanced Boiling Water Reactor