- This is not the released version of the documentation. Recommended Version
Undoing and redoing
Almost all actions in the diagram tool are undoable. Every action that can be undone, can also be redone. For advanced undoing, open the history tool.
Tip: Undo actions cannot be undone. Use redo to undo an undo action.
- To undo the last action, click Undo last action.
- To redo the last action, click Redo last action.
- To undo all actions up until a specific action:
Note: When an action is performed that cannot be undone, the history tool is emptied.
Back to Designing a project