Structure
Structure
project structure
- /wp/wp10-energy-deposition
- /wp/wp1-project-management
- /wp/wp2-accelerator-physics-performance
- /wp/wp3-ir-magnets
- /wp/wp4-crab-cavities-rf
- /wp/wp5-collimation
- /wp/wp6-cold-powering
- /wp/wp6b-warm-powering
- /wp/wp7-machine-protection
- /wp/wp8-collider-experiment-interface
- /wp/wp9-cryogenics
- /wp/wp11-11-t-dipole
- /wp/wp12-vacuum-beam-screen
- /wp/wp13-beam-instrumentation
- /wp/wp14-beam-transfer-kickers
- /wp/wp15-integration-de-installation
- /wp/wp16-it-string-commissioning
- /wp/wp17-infrastructure-logistics-civil-engineering
- /wp/wp18-controls-technologies
HL-LHC is divided into 20 Work Packages
Project activities
Project activities
- Project Structure
- WP1: Project Management
- WP2: Accelerator Physics & Performance
- WP3: IR Magnets
- WP4: Crab Cavities & RF
- WP5: Collimation
- WP6A: Cold Powering
- WP6B: Warm Powering
- WP7: Machine Protection & Availability
- WP8: Collider Experiment Interface
- WP9: Cryogenics
- WP10: Energy Deposition & R2E
- WP11: 11 T Dipole
- WP12: Vacuum & Beam Screen
- WP13: Beam Instrumentation
- WP14: Beam Transfer & Kickers
- WP15: Integration & (De-) Installation
- WP16: IT String & Commissioning
- WP17: Infrastructure, Logistics & Civil Engineering
- WP18: Controls Technologies
- WP19: Alignment & Internal Metrology