- SpreadJS Overview
- Getting Started
- JavaScript Frameworks
- Best Practices
- Features
- SpreadJS Designer
-
SpreadJS Designer Component
- Getting Started
- Quick Start
- Theme
- Designer Interface
- JavaScript Frameworks
- Customizations
-
Work in Designer Component
- AutoSum Functions
- Set Range Template Cell
- Name Box
- Select Cells Using Go To
- Find and Replace
- Edit Font Size
- Edit Font Family
- Manage Conditional Formatting Rules
- Shape Selection Pane
- Automatic Outline
- Format Painter
- Table Slicer
- TableSheet
- GanttSheet Designer
- ReportSheet Designer
- Data Chart Designer
- Text to Columns
- Remove Duplicates
- Pivot Table
- Dockable Side Panel
- Command Palette
- Transform Cells with LAMBDA Formula
- Toolbar Ribbon
- API Documentation
- SpreadJS Collaboration Server
- Touch Support
- Formula Reference
- Import and Export Reference
- Frequently Used Events
- API Documentation
- Release Notes
Task Tab
The TASK tab has options to perform various task operations to manage project schedules in a Gantt chart.
1.png
The following table lists the TASK tab sections, available feature options, and their descriptions:
Section | Feature Option | Description |
|---|---|---|
Schedule | Task Complete | Option to rapid task completion adjustments to 0%, 25%, 50%, 75%, and 100%. |
Indent/Outdent Task | Option to increase or decrease the level of the task. | |
Link/Unlink Task | Option to link or unlink tasks to set or remove a relationship with the predecessors. | |
Tasks | Manually Schedule | Option to change the selected task mode to automatic. |
Auto Schedule | Option to change the selected task mode to manual. | |
Mode | Option to set the default mode to a new task. | |
Insert | Task | Option to insert a task before the selected task. |
Summary | Option to insert a summary task before the selected task. When added, the level of the selected task changes. | |
Milestone | Option to insert a milestone task into a specified location. | |
Properties | Information | Option to show general and advanced information about the selected task such as task name, duration, completion percentage, schedule mode, start time, finish time, predecessors, and so on. |
Editing | Scroll to Task | Option to scroll selected tasks to the middle. |
Find | Option to search for a string or number data in the project as well as replace a specific data with something else. |
To know more about task operations, you can also refer to Task Operations.