Skip to main content
Menu MBTA Home Page
Home Projects Better Bus Project

Better Bus Project

Bus driving down clear path in the designated bus lane, between two tall buildings

We’re improving our bus system to deliver better service in the Greater Boston area. Buses carry 40% of our ridership, with nearly 300,000 passenger trips every weekday. Our improvement plans include increased service, dedicated bus lanes, and modernized facilities.

The Better Bus Project has four key goals:

  1. The bus is an easy first choice for more riders.
  2. Buses go when and where people need them.
  3. Riding the bus is a reliable experience.
  4. Bus stops are comfortable, accessible, and safe.

To learn more, jump to the relevant section below:

Better Bus Initiatives

We’re partnering with departments across the MBTA, over 50 municipalities, and MassDOT to plan, invest in, and implement major improvements to of our bus system. This includes updating bus routes, enhancing bus stops, installing bus lanes and transit priority measures, electrifying the fleet of approximately 1,000 buses, modernizing maintenance facilities, and more.

You told us what needs to be improved, and we heard you. The following Better Bus initiatives address areas that emerged from community feedback:

Each initiative area is designed to address different areas of the bus system and tackle the projects that will transform our service. Learn more about these projects at the links below.

Bus Service

We’re transforming our bus network with updated routes, more frequent service, and better transfer connections.

ProjectStatus
ProjectLongwood Medical Area Bus Circulation Study StatusIn progress
ProjectBus Network Redesign, Phase 1 StatusBegan December 15, 2024
ProjectBus Network Redesign StatusIn progress
ProjectEarly Morning and Late Night Bus Service StatusCompleted (2020)
ProjectBus Route Changes StatusCompleted (December 2019)
ProjectBus Route Changes StatusCompleted (September 2019)

Transit Priority Infrastructure

We’re partnering with municipalities to redesign key streets in Greater Boston to help buses move faster and more reliably across our region.

ProjectStatus
ProjectTransit Priority Strategy StatusIn progress
ProjectTransit Priority Projects StatusIn progress
ProjectBlue Hill Avenue StatusIn progress
ProjectColumbus/Tremont, Phase 2 StatusIn progress
ProjectColumbus Avenue Bus Lanes, Phase 1 StatusCompleted (2021)

Bus Stop Enhancements

We’re improving bus stops across the network to make them more accessible, safe, and comfortable for riders.

ProjectStatus
ProjectBus Stop E-Ink Signs StatusIn progress
ProjectBus Stop Accessibility Improvements StatusIn progress
ProjectRoute 714 Bus Stop Safety and Accessibility Project (BSAP) StatusIn progress
ProjectBus Stop Amenities Program StatusIn progress

Bus Facilities and Operations

We’re investing in a modern and sustainable system that will keep our riders moving. This includes electrifying our bus fleet, modernizing facilities, and improving working conditions for bus operators.

ProjectStatus
ProjectBus Facility Modernization StatusIn progress
ProjectBus Electrification StatusIn progress
ProjectBus Operator Restroom Access and Implementation Guidelines (PDF, 1.2 MB)StatusIn progress

Community Updates

Feedback from riders is crucial to improving the bus system. We received over 20,000 community comments during the Bus Network Redesign process and continue to host in-person and virtual activities as we roll out service changes.

Better Bus Updates Archive

Building a Better T

As part of our 9ドル.6 billion, 5-year capital investment plan, we're renovating stations, modernizing fare collection systems, upgrading services for our buses, subways, and ferries, and improving the accessibility of the entire system.

Learn more

Past Events

Public Meeting | Bus Network Redesign - Fare & Service Equity Analyses (Virtual)

December 8, 2022, 6:00 PM
Public Meeting | Bus Network Redesign - Fare & Service Equity Analyses (Virtual)
Virtual, Boston, MA

Public Meeting | Bus Network Redesign (Virtual)

November 14, 2022, 6:00 PM
Public Meeting | Bus Network Redesign (Virtual)
Virtual, Boston, MA

Public Meeting | Bus Network Redesign (Virtual)

November 2, 2022, 6:00 PM
Public Meeting | Bus Network Redesign (Virtual)
Virtual, Boston, MA

View all events

Contact Us

For all questions and comments related to Better Bus Project, please contact us at betterbusproject@mbta.com.

Get project updates and news delivered to your inbox:

Better Bus Project Updates

Quincy Bus Maintenance Facility Construction Update | Summer 2024

Construction workers on an aerial lift work on a new steel structure
September 5, 2024

Quincy Bus Maintenance Facility Construction Update | Summer 2024

Quincy Bus Maintenance Facility Construction Update | Spring 2024

Workers digging and building the foundation at Quincy Bus Maintenance Facility site.
April 19, 2024

Quincy Bus Maintenance Facility Construction Update | Spring 2024

As part of our Bus Facility Modernization project, we’re constructing a new Quincy Bus Maintenance Facility to accommodate a larger, more modern fleet of battery-electric buses (BEBs). This new facility will support our efforts to lessen our environmental impact...

View all project updates

Bus Lane Performance Reports

Bus Lane Performance Reports

View of bus in marked lane
We collect data on our bus lanes in collaboration with our municipal partners. These performance reports give us information about how well the bus lanes work for bus riders and others.

View our bus lane performance reports

Related Projects

Skate: Mobile Dispatching for Bus Officials

A bus inspector uses Skate, a mobile dispatching app for tablets that we built in-house

Skate: Mobile Dispatching for Bus Officials

In April 2019, we built Skate, a mobile dispatching tool for bus inspectors. Find out how it's helping us improve reliability as part of the Better Bus Project.

Learn more

Building a Better T

As part of our 9ドル.6 billion, 5-year capital investment plan, we're renovating stations, modernizing fare collection systems, upgrading services for our buses, subways, and ferries, and improving the accessibility of the entire system.

Learn more

Better Bus Project Updates

Quincy Bus Maintenance Facility Construction Update | Summer 2024

Construction workers on an aerial lift work on a new steel structure
September 5, 2024

Quincy Bus Maintenance Facility Construction Update | Summer 2024

Quincy Bus Maintenance Facility Construction Update | Spring 2024

Workers digging and building the foundation at Quincy Bus Maintenance Facility site.
April 19, 2024

Quincy Bus Maintenance Facility Construction Update | Spring 2024

As part of our Bus Facility Modernization project, we’re constructing a new Quincy Bus Maintenance Facility to accommodate a larger, more modern fleet of battery-electric buses (BEBs). This new facility will support our efforts to lessen our environmental impact...

View all project updates

Bus Lane Performance Reports

Bus Lane Performance Reports

View of bus in marked lane
We collect data on our bus lanes in collaboration with our municipal partners. These performance reports give us information about how well the bus lanes work for bus riders and others.

View our bus lane performance reports

Related Projects

Skate: Mobile Dispatching for Bus Officials

A bus inspector uses Skate, a mobile dispatching app for tablets that we built in-house

Skate: Mobile Dispatching for Bus Officials

In April 2019, we built Skate, a mobile dispatching tool for bus inspectors. Find out how it's helping us improve reliability as part of the Better Bus Project.

Learn more

Call Us

Information & Support

Monday thru Friday: 6:30 AM - 8 PM
Main: 617-222-3200
711 for TTY callers; VRS for ASL callers

Emergency Contacts

24 hours, 7 days a week
Transit Police: 617-222-1212
TTY: 711

Report a Railroad Crossing Gate Issue

To report a problem or emergency with a railroad crossing, call 800-522-8236
[フレーム]

AltStyle によって変換されたページ (->オリジナル) /