LSD CSI Prototype

Posted by indytechcook on August 3, 2012 at 9:36pm

The initial Prototype for CSI is live. The demo includes integration between SPS, ERS and collections.

The install is based upon http://drupal.org/project/sps_prototype. Please log any issues at http://drupal.org/project/issues/1701722.

http://prototype.csi.dev3.fayze2.com/
user: demo
pw: lsd-csi

Read more

LSD CSI Sprint 3 Risks

Posted by thekellye on July 31, 2012 at 1:47am

Risks for Sprint 3 - Risks and Plans

Risk 1: Integration points for Workbench, SPS, ERS and Reactions not identified in Sprint 3 planning could setback completion of working prototype.

Plan: A goal of our in-person sprint on 7/26 is to discuss all integration points to ensure all have been planned for and tasked appropriately for Sprint 3. We will review all the module integration points for workflow (jec006 and fmitchell), front end integrations (jec006), some refactoring of the framework specifically reactions (e2thex) and cleaning up collections (indytechcook).

Read more
Categories: , ,

LSD CSI Prototype

Posted by indytechcook on July 26, 2012 at 5:44pm

The prototype for CSI will be hosted here: http://drupal.org/sandbox/indytechcook/1701722

Read more
1 comment Categories: ,

LSD CSI Sprint 2 Recap

Posted by thekellye on July 26, 2012 at 5:36pm

Sprint 2 wrapped up (7/24), or roughly 1d (8h) behind schedule. Great progress was made during Sprint 2 and the velocity of the project picked up greatly from Sprint 1 http://groups.drupal.org/node/242358.

Sprint 2 deliverables and milestones included building the plugins and modules per http://groups.drupal.org/node/233058 and http://groups.drupal.org/node/233098.

This high-level goal translated into the following tasks http://drupal.org/project/issues/search/1621176?issue_tags=lsd-csi+sprint+3

Read more
Categories: , ,

Site Preview Module

Posted by indytechcook on July 26, 2012 at 5:20pm

The Site Preview System Framework has been promoted to a full project on Drupal.org http://drupal.org/project/sps

Development will continue here.

Read more
Categories: , ,

Collections

Posted by indytechcook on July 26, 2012 at 4:38pm

I'm proud to announce that the collection module has been posted as a contributed project on Drupal.org. http://drupal.org/project/collections

Read more
Categories: , ,

LSD CSI Weekly Update for 7/23

Posted by indytechcook on July 23, 2012 at 9:37pm

Here is the weekly development update.

Last week

  • Continued work on Sprint 2.
  • Presentations for LSD members
  • (削除) On Board Brade Blake for development (削除ここまで) Brade will not be joing the project
  • Prep for Sprint 3

This week

  • Begin Sprint 3.
  • Create initial Prototype
  • On site meeting in DC
  • Sprint 2 Review document and Sprint 3 goal documents
Read more

LSD CSI Weekly Update for 7/16

Posted by indytechcook on July 16, 2012 at 4:41pm

Here is the weekly development update.

Last week

This week

  • Continued work on Sprint 2.
  • Presentations for LSD members
  • On Board Brade Blake for development
  • Prep for Sprint 3
Read more

LSD CSI Sprint 1 Recap

Posted by indytechcook on July 12, 2012 at 1:09am

Sprint 1 ended on 7/6. The following deliverables were part of Sprint 1 per http://groups.drupal.org/node/233058 and http://groups.drupal.org/node/233098.

  • "Build Framework"

This was a very high level and abstract goal. The actually tasks turned out as http://drupal.org/project/issues/search/1621176?issue_tags=lsd-csi+sprint+1.

During this Sprint we also worked out a more detailed view of the different parts of the system. http://groups.drupal.org/node/241743. This page also includes the different parts of the system that will be plugable

Plugable Parts

  • Widgets
  • Conditions
  • Overrides
  • Reactions

The controllers and manager of the system will have the ability to be completely swapped out by changing configuration. This will allow for complete control of the system without having to hack the module.

The sprint lasted 3 weeks rather then 2. This was due to the complexity of the framework design and the initial ramping up of resources. The primary measurement of the success of the sprint is in the quality of the code and the high test coverage.

The code can be access by cloning the git repository: http://drupal.org/node/1621176/git-instructions/7.x-1.

Test can by run by putting the module into your Drupal installation, enabling the "sps" and "testing" modules the running the tests for the sps module from either admin/config/development/testing or via the command line "php scripts/run-tests.sh --color --verbose SPS,SPSInteractive" from the Drupal root.

Sprint 2 will entail creating the plugins for the Framework along with the integration points with Drupal and other modules. Sprint 2 tickets are listed here: http://drupal.org/project/issues/search/1621176?issue_tags=lsd-csi+sprint+2.

Read more

CSI Weekly Update for 7.2

Posted by indytechcook on July 2, 2012 at 1:10pm

Here is the weekly development update.

Last Week

This Week

<

ul>

Read more