Skip to content

Navigation Menu

Sign in
Sign up

Milestones

List view

  • Make macOS a first-class target: an accelerator abstraction (cuda/metal/cpu) with OS-based detection, clean platform separation in packaging, and a capability contract change in /system. Gated on a research spike that chooses the macOS splat-training backend.

    No due date
    11/25 issues closed
    44% complete14 open 11 closed
  • Operator-facing polish and defensive hardening split out of v2.0.3 on 2026年08月11日: PWA shell refresh, ConfirmDialog accessibility, destructive-delete confirmation, WCAG target size, tab lazy-loading, and the backup/restore recovery path. None of these block use of the product; all were medium or low priority in the v2.0.3 audit backlog.

    No due date
    9/9 issues closed
    100% complete0 open 9 closed
  • Reconstruction, geospatial-export, storage-lifecycle, and platform-hygiene defects from the 2026年08月11日 independent audit, plus the four still-live deferred ceilings (M1 path-guard consolidation, M9 FK indexes, M12 per-tab error boundaries, Windows pytest leg). Real defects, not v2.0.3 release blockers.

    No due date
    52/52 issues closed
    100% complete0 open 52 closed
  • Narrow security dependency patch: resolve npm and Python dependency findings, reconcile dependency metadata, resolve CodeQL alert #46, document and test the supported single-API-process auth topology, add dependency audit gates, and verify a complete backend-bearing source upgrade path. Excludes #539, #556, and full multi-worker auth architecture.

    No due date
    8/8 issues closed
    100% complete0 open 8 closed
  • Pre-release fix set from the 2026年07月20日 release-readiness audit: 3 blockers, high-severity tier, and selected mediums. Tag v2.0.0 when all issues here are closed (the release/changelog issue closes last).

    No due date
    14/14 issues closed
    100% complete0 open 14 closed
  • Lower-priority advanced review/comparison workflow polish promoted from #308.

    No due date
    1/1 issues closed
    100% complete0 open 1 closed
  • Analysis overlays, reconstruction interpretation, and export-format expansion promoted from #308.

    No due date
    13/13 issues closed
    100% complete0 open 13 closed
  • Session organization, persistence, import/watch workflows, archives, backups, search, bulk operations, and local operational hygiene promoted from #308.

    No due date
    11/11 issues closed
    100% complete0 open 11 closed
  • Operator-facing planning, field workflow, mobile quick-checks, notes, warnings, and notifications promoted from #308.

    No due date
    12/12 issues closed
    100% complete0 open 12 closed
  • Larger platform work: XL features, integrations, security, remote workers, packaging, and automation promoted from #308 plus prior v2.0 work.

    No due date
    24/24 issues closed
    100% complete0 open 24 closed
  • High-usefulness operator features (usefulness 8-9, effort S-L) from the 2026年07月02日 audit backlog.

    No due date
    24/24 issues closed
    100% complete0 open 24 closed
  • Verified bugs from the 2026年07月02日 audit (A1-A17), docs refresh, test portability, and finishing half-built surfaces.

    No due date
    36/36 issues closed
    100% complete0 open 36 closed

AltStyle によって変換されたページ (->オリジナル) /