Jump to content
Wikipedia The Free Encyclopedia

Tatan Power Plant

Power plant in Guanyin, Taoyuan City, Taiwan
Tatan Power Plant
Map
Official name大潭發電廠
CountryTaiwan
LocationGuanyin, Taoyuan, Taiwan
Coordinates25°1′34′′N 121°2′50′′E / 25.02611°N 121.04722°E / 25.02611; 121.04722
StatusOperational
Commission date 2005
January 2009 (Unit 6)[1]
OwnerTaipower
OperatorTaipower
Thermal power station
Primary fuelNatural gas
Power generation
Units operational7
Nameplate capacity 4,986 MW [2]
External links
CommonsRelated media on Commons

The Tatan Power Plant, Dah-Tarn Power Plant[3] or Ta-Tan Power Plant[4] (traditional Chinese: 大潭發電廠; simplified Chinese: 大潭发电厂; pinyin: Dàtán Fādiànchǎng) is a gas-fired power plant in Guanyin District, Taoyuan City, Taiwan. At the capacity of 4,384 MW, the plant is the world's largest gas turbine combined cycle power plant[3] and Taiwan's largest gas-fired power plant.

Details

[edit ]
  • Units 1 & 2, 742.7 MW ea, have a total of six Mitsubishi M501F combustion turbines (3 per unit) with two Mitsubishi 282 MW steam turbines. The combustion turbines were upgraded with low-NOx FMk8 model combustors and improved turbine blades in 2018. [5]
  • Units 3-6, 724.7 MW ea, have a total of eight Mitsubishi M501G combustion turbines (2 per unit).[6]
  • Unit 7 has two General Electric simple cycle 300 MW combustion turbines. The project was awarded in 2016. It is being converted to combined cycle, which will add 300 MW capacity to the unit upon completion in 2024.
  • Units 8 & 9 have four General Electric 7HA.02 combustion turbines (two per unit). The project was awarded in 2019 with commissioning scheduled for 2022 (Unit 8) and 2023 (Unit 9).[7]

When complete, the expansions currently underway will bring Tatan to a total capacity of 7,546 MW.

Architecture

[edit ]

The power plant spans over an area of 116.02 hectares with a length of 2,300 meters and width 750 meters.[8]

Fuel supply

[edit ]

The plant operates with liquefied natural gas supplied by CPC Corporation from Taichung LNG Terminal.[9] [10]

Events

[edit ]

2005

[edit ]

On 16 December 2005, the power plant combined cycle Unit 1 and 2 with a capacity of 435.9 MW each went into commercial operation.[11]

2009

[edit ]

On 31 December 2009, the power plant combined cycle Unit 4 and 5 were converted from low pressure to high pressure and started commercial operation on the day. This conversion increased the plant capacity by 507.4 MW.[1]

2012

[edit ]

In 2012, the power plant carried out the Guidance Plan for Energy Industry Adaptive Action in Response to Climate Change to conduct an analysis on the impact of climate change, a vulnerability check and risk evaluation for the facilities within their domain.[12]

2017

[edit ]

On 15 August 2017 at 4:52 p.m., the six generators of the power plant fully tripped due to operation technical error, disrupting the supply of 4 GW of electricity. During the power supply equipment replacement for a control system of the plant's metering station, the worker did not switch the system from auto mode to manual mode before starting the work, resulting the two gas supply pipe valves closed and stop the supply of liquefied natural gas fuel source for two minutes.[13] [14] Electricity rationing was implemented at 6:00 p.m. and ended at 9:40 p.m.[15] [16] The outage hit northern half of Taiwan Island, affecting 6.68 million households. Taipower responded by offering one day electricity charge cut from each household bill, which resulted in NT270ドル million of revenue loss to the company.[17] [18]

Economic Affairs Minister Lee Chih-kung resigned shortly afterwards to take responsibility. Premier Lin Chuan appointed Deputy Minister Shen Jong-chin as acting Minister to replace Lee.[19]

See also

[edit ]

References

[edit ]
  1. ^ a b "Taiwan power company-Taipower Events". Taipower.com.tw. 2009年06月26日. Retrieved 2014年06月03日.
  2. ^ "Datan Power Plant Expansion, Taoyuan". Power Technology.
  3. ^ a b "The Dah-Tarn Power Plant Stage-I No.2 unit begins commercial operation in Taiwan | Power Systems Headquarters | Mitsubishi Heavy Industries, Ltd". Mhi.co.jp. Archived from the original on 2013年10月06日. Retrieved 2013年10月05日.
  4. ^ "Taiwan's Tatan power plant to shift to LNG fuel in early July". Gasstrategies.com. 2006年05月05日. Retrieved 2013年10月05日.
  5. ^ "Datan Power Plant Expansion, Taoyuan". 23 September 2020. Retrieved 3 November 2022.
  6. ^ "Mitsubishi Power Receives Serial Contracts from Taiwan Power for Large-Scale Modification of GTCC at the Datan Power Plant". power.mhi.com. Mitsubishi Group. 2022年07月05日. Archived from the original on November 3, 2022. Retrieved 20 April 2023.
  7. ^ "DaTan Combined-Cycle Power Plant Expansion" . Retrieved 3 November 2022.
  8. ^ "Datan Combined Cycle Power Plant Expansion Project". Taipower. 12 February 2021. Retrieved 6 December 2021.
  9. ^ Tsai, Yi-chu; Chen, Cheng-wei; Chang, S.C. (15 August 2017). "Taiwan's power supply system unable to withstand minor errors: expert". Focus Taiwan. Retrieved 16 August 2017.
  10. ^ OGJ editors (18 July 2009). "CPC inaugurates Taiwan's second LNG terminal". Oil&Gas Journal. Retrieved 1 December 2021. {{cite news}}: |author= has generic name (help)
  11. ^ "Taiwan power company-Taipower Events". taipower.com.tw. Retrieved 2014年08月22日.
  12. ^ "Taiwan Power Company Sustainability Report 2013" (PDF). 20 December 2013. Archived from the original (PDF) on 17 May 2016. Retrieved 2014年08月22日.
  13. ^ "Mishap Triggers Taiwan Blackout as Power Policies Draw Scrutiny". Bloomberg. 16 August 2017. Retrieved 16 August 2017.
  14. ^ Liao, Yu-yang; Lin, Ko (15 August 2017). "Electricity supply restored around Taiwan: Taipower". Focus Taiwan. Retrieved 16 August 2017.
  15. ^ Liao, Yu-yang; Kuo, Chung-han (15 August 2017). "Power outage across Taiwan due to malfunction at power plant". Focus Taiwan. Retrieved 15 August 2017.
  16. ^ "LIVE UPDATES: Power outages hit Taiwan". The China Post. 15 August 2017. Archived from the original on August 15, 2017. Retrieved 15 August 2017.
  17. ^ Huang, Li-yun; Chang, S.C. (16 August 2017). "Taipower to pay NT270ドル million in compensation after blackout". Focus Taiwan. Retrieved 16 August 2017.
  18. ^ Chen, Wei-han (8 September 2017). "Blackouts due to human error and systematic flaws". Taipei Times. Retrieved 8 September 2017.
  19. ^ Lu, Hsin-hui; Huang, Frances (15 August 2017). "National defense system unaffected by power outage". Focus Taiwan. Retrieved 15 August 2017.
Wikimedia Commons has media related to Tatan Power Plant .
Northern Taiwan
Hydro
Fossil fuel
Nuclear
Central Taiwan
Hydro
Fossil fuel
Southern Taiwan
Hydro
Fossil fuel
Nuclear
Maanshan (defunct)
Eastern Taiwan
Hydro
Fossil fuel
Geothermal
Outlying Island
Fossil fuel
Kinmen and Lienchiang
Fossil fuel
(注記)Note:The power plants without"*", were operated by Taiwan Power Company.

AltStyle によって変換されたページ (->オリジナル) /