Jump to content
Wikipedia The Free Encyclopedia

Mau–Ghazipur–Dildarnagar main line

From Wikipedia, the free encyclopedia
Railway line in India
This article needs additional citations for verification . Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Mau–Ghazipur–Dildarnagar main line" – news · newspapers · books · scholar · JSTOR
(July 2019) (Learn how and when to remove this message)
Mau–Ghazipur–Dildarnagar Main Line
Overview
StatusOperational
OwnerIndian Railways
LocaleUttar Pradesh
Termini
Service
Operator(s)North Eastern Railway zone
East Central Railway zone
History
Opened2015
Technical
Line length66 km (41 mi)
Track gauge 5 ft 6 in (1,676 mm) broad gauge
Route map

km
To Varanasi–Chhapra line
6
Badhua Godam
14
Mardah
26
Birno
33
Jangipur
To Varanasi–Chhapra line
To Varanasi–Chhapra line
0
Tarighat
346円
Sonwal
752円
Bemuwa Halt
956円
Nagsar
1360円
Sarahula Halt

The Mau–Ghazipur–Dildarnagar main line connects Mau Junction and Dildarnagar Junction in the Indian state of Uttar Pradesh and comes under the jurisdiction of North Eastern Railway zone & East Central Railway zone.[1]

Overview

[edit ]

This line is divided into three Phases and the total length of this route is 66 km (41 mi)

  • First Phase is from Mau Junction(MAU) to Ghazipur City(GCT) with the length of 34 km (21 mi) and its now the development work is going on.
  • Second Phase is from Ghazipur City to New Tarighat(Naagsaar)(NTRG) with the length of 14 km (9 mi) and also its on under construction. A 1,027.50 metres (3,371.1 ft) Long Rail-cum-Road Bridge on River Ganga is being made under this phase.[2]
  • Third Phase is from New Tarighat to Dildarnagar Junction(DLN) with the length of 18 km (11 mi) with a bypass line towards Buxar (BXR). Tarighat (TRG) to Dildarnagar Junction is fully operational with the bypass line to Buxar operational from 2015.[3]

Project

[edit ]

The estimated cost of the project is Rs 1,765.92 crore and the expected completion cost is Rs 2,109.07 crore with five percent escalation per annum. After completion it would bigger beneficial for the Howrah–New Delhi route and boom for economical development of Eastern Uttar Pradesh and also reduction of travelling through Mau.[4]

References

[edit ]
Railways in Northern India
National network/
trunk lines
Branch lines/
sections
Urban and suburban
rail transport
Heritage railways
Monorails
Defunct lines
Manufacturing units
and workshops
Railway companies
See also


Stub icon 1 Stub icon 2

This Indian rail transport related article is a stub. You can help Wikipedia by expanding it.

AltStyle によって変換されたページ (->オリジナル) /