Line 12 (Mumbai Metro)
Mumbai Metro Orange Line 12 Extension | ||||||
---|---|---|---|---|---|---|
Overview | ||||||
Other name(s) | Orange Line | |||||
Status | Under construction | |||||
Owner | Mumbai Metropolitan Region Development Authority | |||||
Line number | 12 | |||||
Locale | Navi Mumbai and Thane, Maharashtra, India | |||||
Termini | ||||||
Stations | 19 | |||||
Service | ||||||
Type | Metro | |||||
System | Mumbai Metro | |||||
Operator(s) | MMRDA | |||||
History | ||||||
Planned opening | 2027-End | |||||
Technical | ||||||
Line length | 22.17 km (13.78 mi) | |||||
Number of tracks | 2 | |||||
Character | Elevated | |||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | |||||
Electrification | Overhead catenary | |||||
Operating speed | 120 km/h (75 mph) | |||||
|
Orange Line 12 (Extension), or the Kalyan-Dombivli-Taloja Line is a under construction line of Mumbai Metro. It will be an extension of Orange Line. The total length of the line will be 22.17 kilometres (13.78 mi), and the route will be completely elevated. The total cost of construction is confirmed to be Rs 2037.20 crore.[1] MMRDA approved the Kalyan-Dombivli-Taloja Metro line. There will be 19 stations. This line will connect Navi Mumbai city with Kalyan-Dombivali city.[2]
As of March 2025 construction and pier work has started and is expected to be completed by 2027
It is planned to connect to proposed Munbai Metro line 14 (Kanjurmarg-Badlapur)
It will connect to under construction orange line 5 at Kalyan and Navi mumbai metro phase-1 at Amandoot
Delhi Metro authority had shown red flag to Kalyan-Dombivli-Taloja Metro, with Revenue Opening Date (ROD) as 01/11/2024. MMRDA in its 138th Authority Meeting held on 26/08/2015 vide Resolution No. 1340 has granted In-principle Approval to develop growth Centre in Kalyan Taluka (area approx. 1089 Ha.)
Stations
[edit ]Line 12 will have 19 stations, all elevated.
Orange Line 12 | |||||||||
---|---|---|---|---|---|---|---|---|---|
# | Station Name | Status | Connections | Layout | |||||
English | Marathi | ||||||||
1 | Kalyan APMC | कल्याण एपीएमसी | Under Construction | Line 5 ( Partially Under Construction) | Elevated | ||||
3 | Ganesh Nagar (Kalyan) | गणेश नगर (कल्याण) | Under Construction | None | Elevated | ||||
4 | Pisavali Gaon | पिसावली गाव | Under Construction | None | Elevated | ||||
5 | Golavali | गोलावली | Under Construction | None | Elevated | ||||
6 | Dombivali MIDC | डोंबिवली एमआयडीसी | Under Construction | None | Elevated | ||||
7 | Sagaon | सागांव | Under Construction | None | Elevated | ||||
8 | Sonarpada | सोनारपाडा | Under Construction | None | Elevated | ||||
9 | Manpada (Dombivali East) | मानपाडा (डोंबिवली पूर्व) | Under Construction | None | Elevated | ||||
10 | Hedutane | हेदुतने | Under Construction | None | Elevated | ||||
11 | Kolegaon | कोलेगाव | Under Construction | None | Elevated | ||||
12 | Nilaje Gaon | निळजे गाव | Under Construction | None | Elevated | ||||
13 | Vadavali | वडवली | Under Construction | None | Elevated | ||||
14 | Bale | बाळे | Under Construction | None | Elevated | ||||
15 | Waklan | वाक्लन | Under Construction | None | Elevated | ||||
16 | Turbhe | तुर्भे | Under Construction | None | Elevated | ||||
17 | Pisarve Depot | पिसार्वे आगार | Under Construction | None | Elevated | ||||
18 | Pisarve | पिसार्वे | Under Construction | None | Elevated | ||||
19 | Amandoot(Taloja) | तळोजा | Under Construction | Line 1 (Navi Mumbai Metro) | Elevated |
References
[edit ]- ^ "Gawar Wins Mumbai Metro Line 12's Construction Contract CA-240". The Metro Rail Guy. 9 February 2024. Retrieved 9 February 2024.
- ^ "Mumbai Metro 12 Approved".
This Indian rail transport related article is a stub. You can help Wikipedia by expanding it.