Jump to content
Wikipedia The Free Encyclopedia

Korean lunar lander

From Wikipedia, the free encyclopedia
Planned South Korean lunar lander
Korean lunar lander
Mission typeLunar lander
OperatorKorea Aerospace Research Institute
Start of mission
RocketKSLV-III
Launch siteNaro Space Center
ContractorKorea Aerospace Research Institute
Moon lander
← Danuri

The Korean lunar lander is a lunar lander currently under development by South Korea, scheduled to be launched in 2032.

Plan

[edit ]

The lunar lander is the second phase of the Korean Lunar Exploration Program, and is currently under development with a launch target of 2032, following the lunar orbiter Danuri launched in 2022. The goal of the second phase of the lunar exploration project is to independently develop a 1.8-ton lunar soft landing verification ship and lunar lander, and secure independent space exploration capabilities through lunar surface soft landing experiments and scientific and technological mission performance.[1] This project, with a total project cost of 530.3 billion won, is scheduled to be carried out until the end of 2033.[2]

The mission is expected to last approximately 14 days. The payload required for the lunar landing mission will be selected through a planning study based on scientific and technological needs, and will be decided along with the landing site.[1]

Development

[edit ]

On October 30, 2024, the Korea AeroSpace Administration and Korea Aerospace Research Institute signed an agreement for the second phase of the lunar exploration project (lunar lander development) and announced that it would begin the project in earnest. The main content is to invest approximately 530 billion won over 10 years to independently develop a lunar lander to be sent to the moon with the goal of landing on the moon in 2032.[1]

KASA aims to complete the design of the lunar lander by 2028, launch the lunar soft landing verification probe in 2031, and launch the lunar lander in 2032.[2]

References

[edit ]
Organizations
Launch sites
Rocket engines
Completed development
Under development
KARI
ADD
KARI
ADD
Perigee Aerospace
Innospace
Small satellites
Reconnaissance satellites
Communication satellites
Earth observation
Geostationary
  • Chollian
CubeSats
Contractors
Astronauts
Exploration
programs
Active
missions
Orbiters
Landers
Rovers
Flybys
Past
missions
Crewed landings
Orbiters
Impactors
Landers
Rovers
Sample return
Failed landings
Flybys
Planned
missions
Artemis
CLPS
Luna-Glob
  • 26 (2027)
  • 27 (2028)
  • 28 (2030)
  • 29 (2030s)
  • 30 (2030s)
  • 31 (2030s)
CLEP
Chandrayaan
KLEP
Others
Proposed
missions
Robotic
Crewed
Cancelled /
concepts
Related
  • Missions are ordered by launch date. Crewed missions are in italics.

AltStyle によって変換されたページ (->オリジナル) /