Jump to content
Wikipedia The Free Encyclopedia

Kayu Ara LRT station

This article needs additional citations for verification . Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Kayu Ara LRT station" – news · newspapers · books · scholar · JSTOR
(October 2021) (Learn how and when to remove this message)
 SA02  Kayu Ara
Rapid_KL_Logo | Future LRT station
Kayu Ara LRT Station under construction in 2023
General information
LocationDamansara Utama, Selangor
Malaysia
Coordinates3°08′06′′N 101°37′00′′E / 3.1349°N 101.6168°E / 3.1349; 101.6168
Owned byPrasarana Malaysia
Operated byRapid Rail
Line(s)11 Shah Alam
Platforms1 island platform
Tracks2
Construction
Structure typeElevated
ParkingAvailable
Other information
StatusUnder construction
Station code SA02 
Services
Preceding station Following station
Bandar Utama
Terminus
Shah Alam Line
Future service (opening 2025)
BU11
towards Johan Setia

The Kayu Ara LRT station is a light rapid transit (LRT) station that serves the suburb of Damansara Utama and Kampung Sungai Kayu Ara in Petaling Jaya, Selangor, Malaysia. It will be one of the stations on the Shah Alam line. The station is located right next to the Kayu Ara River. The station is an elevated rapid transit station in Petaling Jaya, forming part of the Klang Valley Integrated Transit System.[1]

The station is marked as Station No. 2 along with the RM9 billion line project with the line's maintenance depot located in Johan Setia, Klang. Originally this LRT station was expected to be operational in February 2024, however the operational date for the entire Shah Alam Line has been delayed and expected to be operational by third quarter of 2025 as mentioned by Transport Minister Anthony Loke. (previously expected to be operational by March 2025 as announced in 2023)[2] It will have facilities such as a multi-story park and ride, kiosks, restrooms, elevators, taxi stand, and feeder bus among others.[3]

References

[edit ]
  1. ^ "Pelan Setiap Stesen". Prasarana Malaysia. Archived from the original on 2015年05月22日. Retrieved 2015年05月17日.
  2. ^ "LRT3 Expected To Be Operational In Q3 Of 2025 - Loke". BERNAMA. 2024年07月29日. Retrieved 2024年07月29日.
  3. ^ "Jangka Masa Projek LRT3". Prasarana Malaysia. Archived from the original on 2015年05月27日. Retrieved 2015年05月17日.
[edit ]
Phase 1

Opening Q3 2025
Phase 2

Opening 2027
Opening 2028-2030
Stations and services in italics are planned or under construction


Stub icon

This Malaysian rapid transit article is a stub. You can help Wikipedia by expanding it.

AltStyle によって変換されたページ (->オリジナル) /