HaYovel Tower
- Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
- Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
- You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is
Content in this edit is translated from the existing Hebrew Wikipedia article at [[:he:מגדל היובל]]; see its history for attribution.
- You may also add the template
{{Translated|he|מגדל היובל}}
to the talk page. - For more guidance, see Wikipedia:Translation.
HaYovel Tower | |
---|---|
מגדל היובל | |
HaYovel Tower in June 2006 | |
HaYovel Tower is located in Tel Aviv HaYovel Tower HaYovel Tower within Tel Aviv | |
General information | |
Status | Completed |
Type | Offices |
Architectural style | Postmodern |
Location | Tel Aviv, Israel |
Coordinates | 32°4′22.61′′N 34°47′21.16′′E / 32.0729472°N 34.7892111°E / 32.0729472; 34.7892111 |
Construction started | 2001 |
Opening | 2005 |
Cost | 450ドル million |
Height | |
Roof | 158 m (518 ft) |
Technical details | |
Floor count | 42 |
Floor area | 110,000 m2 (1,200,000 sq ft) |
Design and construction | |
Architect(s) | Peleg Architects |
Developer | Africa-Israel, Minrav |
HaYovel Tower[1] [2] [3] (Hebrew: מגדל היובל, lit. 'Jubilee Tower') also known as Kiryat HaMemshala Tower (Hebrew: מגדל קריית הממשלה, lit. 'Government Complex Tower') is a skyscraper in Tel Aviv, Israel. At 158 m (42 floors), it is the 20th tallest building in Israel. Construction was completed in 2005 on land previously belonging to the IDF HaKirya base. The tower is located near the Tel Aviv's tallest skyscraper cluster, the Azrieli Center complex, and is occupied largely by government offices. The consolidation of many of these offices in the tower, which were previously spread out all over the Tel Aviv district, allowed the release of a considerable amount of high-value government land to private development, as well as introducing efficiencies from housing many government functions under one roof. The tower has a helipad on its roof. It was originally planned to have 28 floors for government functions only, with the additional 14 floors being approved during construction. 13 of these top floors were approved for use by private sector offices, and the top 11 floors have floor-to ceiling windows. An external elevator serves the uppermost floors, and an underpass connects the building with the tower's underground parking. The rent being paid by the government is 16ドル/square metre per month for the next 20 years.
Design
[edit ]The design of the building, which used postmodern architecture, was led by Peleg Architects. The building is mostly made of concrete, however its facade consists of such materials as granite, glass and aluminium, which were colored in dark green. The exterior walls of floors above 31 are fully glazed from floor to ceiling.
References
[edit ]- ^ "REIT 1, Africa Israel Properties resolve Hayovel Tower dispute". Globes. 2 April 2019.
- ^ "HaYovel Tower - The Skyscraper Center". www.skyscrapercenter.com.
- ^ "FPS Israel Representative Office opening in the Hayovel Tower, Tel-Aviv - FPS. Legal advice. Made for you". fps-law.de.