Jump to content
Wikipedia The Free Encyclopedia

Dahong Men station

Beijing Subway station
Dahong Men[1]

大红门
Platform
General information
LocationNanyuan Road and Linhong Road (临泓路)
Fengtai District, Beijing
China
Coordinates39°50′43′′N 116°23′57′′E / 39.845383°N 116.399154°E / 39.845383; 116.399154
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)     Line 10
     Line 8 (Not Opened)
Platforms4 (1 island platform, 1 island platform unopened)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
History
Opened30 December 2012; 12 years ago (2012年12月30日) (Line 10)
2025[2] (Line 8)
Services
Preceding station Beijing Subway Following station
Shiliuzhuang
outer loop / anticlockwise
Line 10 Jiaomendong
inner loop / clockwise
     Line 8 does not stop here
Location
Location in central Beijing

Dahong Men station[1] (simplified Chinese: 大红门站; traditional Chinese: 大紅門站; pinyin: Dàhóng Mén zhàn) is a station on Line 10 of the Beijing Subway.[3]

The Line 10 station opened on December 30, 2012.[4]

Currently, Line 8 trains pass through the station without stopping here. Due to demolition and construction of the transfer channel and remaining exits, the station for Line 8 is expected to open in 2025.[2]

Station layout

[edit ]

The line 10 and unopened line 8 station have underground island platforms.

Exits

[edit ]

There are 4 exits, lettered A1, A2, C, and D. Exits A1 and C are accessible.

History

[edit ]

When the southern section of Line 8 was opened in 2018, Dahong Men Station was unable to open due to obstruction of the demolition of Buildings 1 and 2 of Xili Nursery within the block where the transfer passageway is located (as there were still 21 households that have not signed a contract for relocation). In July 2021, the demolition of Building 1 of Xili Nursery began,[5] but the demolished plot was vacant until December 2023.[6] At the start of February 2024, construction of the transfer passageway began.[2]

References

[edit ]
  1. ^ a b "北京地铁线路图". 北京地铁. Archived from the original on 2024年03月13日.
  2. ^ a b c "8号线大红门站" [Line 8 Dahongmen Station]. 2024年03月08日. Archived from the original on 2024年03月13日. The construction unit entered the construction site in January this year and is expected to be completed and open to traffic before the end of this year.
  3. ^ 地铁10号线二期I段设计方案敲定 [Metro Line 10 two paragraphs I finalizing the design]. Capital Construction News (in Chinese). January 28, 2008. Archived from the original on 2014年11月01日.
  4. ^ 轨道交通四条新线12月30日开通试运营 [Four new rail transit line December 30 opening of trial operation] (in Chinese). Beijing Municipal Transportation Administration Bureau. Archived from the original on May 11, 2013. Retrieved December 29, 2012.
  5. ^ "打通关键节点,8号线10号线大红门站明年将实现换乘" [Open up key nodes, Line 8 and Line 10 Dahongmen Station will be able to transfer next year] (in Simplified Chinese). Beijing Daily. 2021年07月22日. Archived from the original on 2024年04月18日. Retrieved 2025年02月01日.
  6. ^ "北京丰台缘何屡列"接诉即办"排名榜尾?记者调查→" [Why is Fengtai District in Beijing often ranked last in the "handle complaints immediately" ranking? Reporter’s investigation →] (in Simplified Chinese). China CNR. 2023年12月23日. Archived from the original on 2024年04月18日. Retrieved 2025年02月01日.
Line 8
Line 10
Stations that are proposed, under planning or under construction are shown in italics.


This article related to the Beijing Subway is a stub. You can help Wikipedia by expanding it.

AltStyle によって変換されたページ (->オリジナル) /