Dahanukarwadi metro station
Mumbai Metro station | ||||||||||||||||||||||||||||||||||||||||
General information | ||||||||||||||||||||||||||||||||||||||||
Location | Kandivali, Mahatma Gandhi Nagar, Kandivali West, Mumbai, Maharashtra 400067 | |||||||||||||||||||||||||||||||||||||||
Coordinates | 19°12′22′′N 72°50′05′′E / 19.20624°N 72.83476°E / 19.20624; 72.83476 | |||||||||||||||||||||||||||||||||||||||
Owned by | Mumbai Metropolitan Region Development Authority (MMRDA) | |||||||||||||||||||||||||||||||||||||||
Operated by | Maha Mumbai Metro Operation Corporation Limited (MMMOCL) | |||||||||||||||||||||||||||||||||||||||
Line(s) | Line 2A | |||||||||||||||||||||||||||||||||||||||
Platforms | 3 (2 side platform) | |||||||||||||||||||||||||||||||||||||||
Tracks | 3 | |||||||||||||||||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||||||||||||||||
Structure type | Elevated, Double track | |||||||||||||||||||||||||||||||||||||||
Parking | No | |||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||
Opened | 2 April 2022; 2 years ago (2022年04月02日) | |||||||||||||||||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||
|
Location | |
---|---|
Map |
Dahanukarwadi is an elevated metro station serving Dahanukarwadi neighbourhood of Kandivali on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.[1] [2]
History
[edit ]J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[3] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[4]
Dahanukarwadi was opened to the public on 2 April 2022, along with the first phase of Line 2A.[5] [6]
Station layout
[edit ]Power and signaling system
[edit ]Like all other stations and railways of Mumbai metro, Dahanaukarwadi station also uses 25,000 volt AC power system by overhead catenary to operate the trains.
References
[edit ]- ^ "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 18 April 2023.
- ^ "Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes | Know Fare, Routes as Ops Begin Today". News18. 20 January 2023. Retrieved 18 April 2023.
- ^ "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". dna. 9 August 2016. Archived from the original on 15 October 2016. Retrieved 14 October 2016.
- ^ "MMRDA to conduct test run for two elevated Metro lines next week". Mumbai Mirror. IANS. 26 May 2021. Retrieved 9 July 2023.
- ^ "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 3 April 2022. Retrieved 9 July 2023.
- ^ "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Retrieved 18 April 2023.