Daduhe Road station
Appearance
From Wikipedia, the free encyclopedia
(Redirected from Daduhe Road Station)
Shanghai Metro station
This article needs additional citations for verification . Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Daduhe Road station" – news · newspapers · books · scholar · JSTOR (August 2013) (Learn how and when to remove this message)
Find sources: "Daduhe Road station" – news · newspapers · books · scholar · JSTOR (August 2013) (Learn how and when to remove this message)
Daduhe Road 大渡河路 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Platform | ||||||||||||
General information | ||||||||||||
Location | Jinshajiang Road and Daduhe Road (大渡河路) Putuo District, Shanghai China | |||||||||||
Coordinates | 31°14′04′′N 121°22′32′′E / 31.234454°N 121.375676°E / 31.234454; 121.375676 | |||||||||||
Operated by | Shanghai No. 2 Metro Operation Co., Ltd. | |||||||||||
Line(s) | Line 13 Line 15 | |||||||||||
Platforms | 4 (2 side platforms and 1 island platform) | |||||||||||
Tracks | 5 | |||||||||||
Construction | ||||||||||||
Structure type | Underground | |||||||||||
Accessible | Yes | |||||||||||
History | ||||||||||||
Opened |
| |||||||||||
Services | ||||||||||||
| ||||||||||||
Daduhe Road (Chinese: 大渡河路; pinyin: Dàdùhé Lù) is an interchange station on Line 13 and Line 15 of the Shanghai Metro. It is located in Putuo District.
On 30 December 2012, Line 13 began providing service from Jinyun Road to the west to Jinshajiang Road to the east.[1] However, this did not include the South Qilianshan Road or Daduhe Road stations. This station opened on 1 November 2014.[citation needed ]
This station utilizes side platforms with three tracks running through the middle: one going towards Jinshajiang Road, one going towards Zhenbei Road, and a third used to store extra carriages.
Station Layout
[edit ] G
Entrances and Exits
Exits 1, 3-4, 6-7, 9
B1
Concourse
Faregates, Station Agent
B2
Side platform, doors open on the right
Side platform, doors open on the right
Island platform, doors open on the left
References
[edit ]- ^ Zha, Minjie (29 December 2012), Extension of Line 13 begins run tomorrow