Borumba Dam Pumped Hydro Power Station
The Borumba Dam Pumped Hydro Power Station is a proposed 2,000 MW pumped hydro energy storage system at Lake Borumba, located in Imbil, south-west of Gympie in Queensland, Australia. First power is expected in 2030.[1] [2] A state-owned entity called Queensland Hydro is coordinating the project.[3]
The land for the pumped hydro scheme was purchased by the Bjelke-Petersen state government following a Cabinet decision in August 1985.[4] Plans for the scheme were announced in September 2022.[3] The project is expected to cost 14ドル.2 billion.[1] Borumba Dam will be expanded for the project.[3] A new dam wall is to be constructed downstream. A second reservoir is needed to be constructed.[3] It will be built at a higher altitude than Borumba Dam.
See also
[edit ]References
[edit ]- ^ a b "Borumba Pumped Hydro Project". Queensland Hydro. Retrieved 2 April 2024.
- ^ Sheehan, Amy; Ross, Jessica; Easton, Alex (19 September 2024). "Borumba Pumped Hydro's 14ドル.2 billion renewable energy project construction start date thrown into doubt". ABC News. Retrieved 11 November 2024.
- ^ a b c d Ross, Jessica (23 February 2024). "Borumba Pumped Hydro Project attracts state funding for GP clinic, millions to Imbil, as site investigation continues". ABC News. Retrieved 2 April 2024.
- ^ Cabinet Minutes 6 August 1985
This article about a building or structure in Queensland is a stub. You can help Wikipedia by expanding it.
This article about a hydroelectric power plant is a stub. You can help Wikipedia by expanding it.