π§ How to Make ERP Projects Successful β The Complete Realistic Roadmap
π‘ From Failure to Future: Practical, Proven, and Bangladeshi-Context ERP Implementation Strategy
π 1οΈβ£ Define Clear Business Goals Before Coding
π§© Realistic Resolution
Conduct Business Process Study Workshops (BPSW) for each department.
Document existing manual workflows β identify inefficiencies β map "To-Be" processes.
Assign process owners (not just IT) to approve each step.
Use Lucidchart / Visio / Draw.io to create visual workflows before any development.
π§ Why it works: A visual process eliminates ambiguity. When everyone understands the flow, developers can build logic accurately.
π 2οΈβ£ Conduct a Feasibility & ROI Study
π§© Realistic Resolution:
Calculate measurable KPIs: time saved, error reduction, faster reporting.
Prepare a 3-year ROI Projection Sheet (excel-based).
Share with management to set realistic expectations.
Revisit ROI quarterly to show progress.
π§ Why it works: Realistic expectations = long-term confidence = reduced pressure on the project team.
π§ββοΈ 3οΈβ£ Drive Employee Adoption from Day One
π§© Realistic Resolution:
Involve employees in early testing and feedback loops.
Conduct short "Show & Tell" demo sessions π§βπ» every Friday.
Launch ERP Awareness Campaigns inside the company (email posters, short videos).
Reward top ERP users ("ERP Champion of the Month" π
).
π§ Why it works: ERP success is 70% psychology and 30% technology.
βοΈ 4οΈβ£ Balance Customization with Standardization
π§© Realistic Resolution:
Keep 80% standard and only 20% customized .
Maintain a "Customization Register" to track changes.
Avoid unnecessary stored procedure overrides.
Prefer configuration over hard-coded customization.
π§ Why it works: When your ERP upgrades later, minimal breakage and faster support.
π§Ή 5οΈβ£ Data Cleaning & Governance Policy
π§© Realistic Resolution:
Assign a "Data Steward" per department.
Run Excel-based data validation before importing.
Use scripts to detect duplicates, missing codes, invalid IDs.
Define data entry SOPs: Naming conventions, date formats (YYYY-MM-DD).
π§ Why it works: Clean data ensures dashboard accuracy and user trust.
π° 6οΈβ£ Smart Vendor Selection Framework
π§© Realistic Resolution:
Prepare an ERP Vendor Scorecard based on:
Check existing clients and support feedback.
Prefer vendors offering SLA (Service Level Agreement) with a defined response time.
π§ Why it works: Youβre selecting a partner, not just a software vendor.
π§βπ« 7οΈβ£ Continuous Training Culture
π§© Realistic Resolution:
Conduct training in phases: Pre-Go-Live, Go-Live Week, Post-Go-Live.
Use video-based micro learning (2β3 min clips).
Create an internal "ERP Knowledge Base" using Google Sites / Notion.
Conduct quarterly refresh sessions.
π§ Why it works: Sustained training ensures ERP remains alive and relevant.
β‘ 8οΈβ£ Strengthen Infrastructure & Backup
π§© Realistic Resolution:
Use Cloud hosting or hybrid (local+cloud) with daily automated backups.
Set up power redundancy (UPS, inverter, generator).
Monitor system health via Power BI dashboards (uptime %, latency, user sessions).
Use SSL & firewall for all API endpoints.
π§ Why it works: Stable system β user confidence β adoption.
π€ 9οΈβ£ Foster Inter-Departmental Collaboration
π§© Realistic Resolution:
Form an ERP Steering Committee (Finance, HR, Production, IT).
Monthly cross-department meetings to discuss issues.
Build dashboards that show how one departmentβs data impacts another.
π§ Why it works: Collaboration = Shared Ownership = Long-term success.
π΅οΈ π Capture Hidden Requirements Early
π§© Realistic Resolution:
Conduct UAT simulation workshops before final build.
Use mock data and screen prototypes for review.
Apply "Requirement Traceability Matrix (RTM)" β maps each requirement to its test case.
π§ Why it works: You catch surprises before they become disasters.
π¦ 11οΈβ£ Budget for Quality & Scalability
π§© Realistic Resolution:
Keep a 10β15% contingency budget for change requests.
Invest in cloud scalability and security audits.
Pay for SLA-based annual support β itβs cheaper than downtime.
π§ Why it works: Predictable cost β zero panic during crisis.
π°οΈ 12οΈβ£ Plan Practical Timelines
π§© Realistic Resolution:
Use a Gantt Chart (Excel or MS Project).
Include time for testing, training, and data migration.
Define clear milestones with acceptance criteria.
Avoid festival seasons for go-live (production load & staff leaves).
π§ Why it works: A well-paced project = fewer mistakes, better adoption.
π§© 13οΈβ£ Strong Project Management Framework
π§© Realistic Resolution:
Assign a dedicated Project Manager (PM).
Weekly progress reports with traffic-light status (Green/Amber/Red).
Use collaboration tools like Trello, Asana, or Jira.
Keep management engaged with short, visual summaries.
π§ Why it works: Visibility ensures accountability.
π 14οΈβ£ Empower Skilled Business Analysts
π§© Realistic Resolution:
Hire BAs with domain + technical blend (Finance, Supply Chain, HR).
BA should write clear BRD (Business Requirement Document) and FRD (Functional Requirement Document) .
Conduct requirement review sessions before sign-off.
π§ Why it works: A skilled BA translates chaos into clarity.
π 15οΈβ£ Master Data Migration Process
π§© Realistic Resolution:
Run 3 mock migrations: dry run, pilot, final.
Validate totals with finance team after each.
Keep Excel-based reconciliation sheets.
Backup all previous data securely before switching systems.
π§ Why it works: Reliable migration = confidence on Day 1 of Go-Live.
π― Final Words: From ERP Chaos to ERP Confidence
ERP success doesnβt depend on big budgets β
it depends on discipline, ownership, and continuous improvement .
Bangladesh has the talent β whatβs needed is structured execution.
Once companies treat ERP as a strategic growth partner (not an IT tool),
the success rate will skyrocket π.