中文

Natural Energy Powering Nature

NEWS/ MORE ››
Announcements /
Company Overview/ MORE ››

CGN New Energy Holdings Co., Ltd. (CGN New Energy) (formerly known as CGN Meiya Power Holdings Co., Ltd.) is a diversified independent power producer in terms of fuel type and geography, with a portfolio of assets comprising wind, solar, gas-fired, coal-fired, oil-fired, hydro and biomass power generation projects and an energy storage project in the PRC and Korea.

China General Nuclear Power Corporation (CGN) acquired the entire share capital of our Company through its indirectly wholly-owned subsidiary, CGNPC Huamei Investment Limited, in November 2010 and became our Controlling Shareholder. CGN is a wholly state-owned company, established on September 29, 1994 under the laws of the PRC. Authorized by the State Council in accordance with the PRC Company Law and other administrative regulations, SASAC has investor’s rights and responsibilities in CGN.

CGN New Energy continues greenfield and brownfield developments while preferentially acquiring clean and renewable power generation projects to deliver solid returns and create value for its shareholders.

Our Business/
SOCIAL RESPONISIBILITY AND CORE COMPETENCE/

SOCIAL RESPONISIBILITY

MORE ››

CORE COMPETENCE

MORE ››


Natural Energy Powering Nature Suites 1201-3 and 7-10, 12/F, Great Eagle Centre, 23 Harbour Road, Wanchai, Hong Kong
Contact Us|Site Map|Privacy Policy|Copyright & DisclaimersSupport:CIT
Copyright © 2019 CGN New Energy Holdings Co., Ltd. 2019 All Rights Reserved. 粤ICP备08132407号
/encgnneh/c100530/2017-12/04/76128e294188459ca46a81dcb10b5bf8/images/f593df6bc03e4edc979a2743a504813c.jpg
javascript:void(0);

Liuyuan Project

Total Installed Capacity: 49.5MW
Fuel Type: Wind
COD: 2011
c100530
/encgnneh/c100529/2017-12/04/8077bd341b2c4e598010b2b68384420e/images/6a9612783bac4e4ca8c386f305408e9c.jpg
javascript:void(0);

Beiba Project

Total Installed Capacity: 199.5MW
Fuel Type: Wind
COD: 2015
c100529
/encgnneh/c100528/2017-12/04/746a0de086d4406c85dc0ac2dfdaf2cd/images/849181e2a4a04827abc8775122b587e7.jpg
javascript:void(0);

Daliangbei Project

Total Installed Capacity: 47.5MW
Fuel Type: Wind
COD: 2014
c100528
/encgnneh/c100528/2017-12/04/be5656a395644f33a8be325cb9e61b06/images/4eee5f6ee6874830acbd1101fdd3daab.jpg
javascript:void(0);

Daliangdong Project

Total Installed Capacity: 47.5MW
Fuel Type: Wind
COD: 2014
c100528
/encgnneh/c100527/2017-12/04/18ddb8e9b4814d66b86f5d3666996c96/images/2529aaa2abbb472fa7b438e3accf2ed6.jpg
javascript:void(0);

Hongshagang Project

Total Installed Capacity: 400MW
Fuel Type: Wind
COD: 2015
c100527
/encgnneh/c100526/2017-12/04/e444301e3f014acc9e04698385a82f43/images/12b1568188304561b4ab3bd4b9f367b4.jpg
javascript:void(0);

Minqin I Project

Total Installed Capacity: 49.5MW
Fuel Type: Wind
COD: 2012
c100526
/encgnneh/c100526/2017-12/04/3fe832ef75064c4eae33c803673f64f2/images/c0f34979738c40a39c9b9df8ec5f6753.jpg
javascript:void(0);

Minqin II Project

Total Installed Capacity: 49.5MW
Fuel Type: Wind
COD: 2013
c100526
/encgnneh/c100525/2017-12/04/8f9728de87b84e2b8ccec6c4195025fd/images/8700ecbc967d43eea52a5186636737d1.jpg
javascript:void(0);

Tangwangshan II Project

Total Installed Capacity: 49.5MW
Fuel Type: Wind
COD: 2014
c100525
/encgnneh/c100524/2017-12/04/7f3064da30e84384860620c1a7314d19/images/3376897c0728401193cde50c77f09acb.jpg
javascript:void(0);

Shagou I Project

Total Installed Capacity: 49.5MW
Fuel Type: Wind
COD: 2012
c100524
/encgnneh/c100523/2017-12/04/8cd0068482cf442a96717ca663ed503e/images/03ec8ea293ad440d8da6f17fb2796faa.jpg
javascript:void(0);

Linqu Longgang Project

Total Installed Capacity: 48MW
Fuel Type: Wind
COD: 2014
c100523
/encgnneh/c100522/2017-12/04/c0b79a692acf4bb781e9524f558cb752/images/a3daa1b7167f4ffd824c6f4915ac6f0c.jpg
javascript:void(0);

Liuwangzhuang Project

Total Installed Capacity: 38.3MW
Fuel Type: Wind
COD: 2011
c100522
/encgnneh/c100521/2017-12/04/22be487413cc4062ac88007ddb704770/images/521286e94ea84862af0c74ec306475b0.jpg
javascript:void(0);

Tangwangshan I Project

Total Installed Capacity: 20.4MW
Fuel Type: Wind
COD: 2010
c100521
/encgnneh/c100520/2017-12/04/d02bf11209414e70af16d912baf6a9d2/images/b034658aa2994c0e814813c479c9f2f8.jpg
javascript:void(0);

Taipingshan I Project

Total Installed Capacity: 49.3MW
Fuel Type: Wind
COD: 2010
c100520
/encgnneh/c100519/2017-12/04/5f8acadc4b464cc4a8466b7cb59c9c95/images/51fa0d084ddd432ab258f344dd1e36ec.jpg
javascript:void(0);

Ninghai Yishi Project

Total Installed Capacity: 48MW
Fuel Type: Wind
COD: 2015
c100519
/encgnneh/c100518/2017-12/04/2bc52d129cc540d8bdf02d3d892078bf/images/3ca5df7dbec3475f95ecaffdd5a87949.jpg
javascript:void(0);

Tuci Project

Total Installed Capacity: 30MW
Fuel Type: Wind
COD: 2013
c100518
/encgnneh/c100538/2017-12/04/c142850b29e949f58415fb75c1baf87a/images/4f589cda0dc048bcb1c9c3b19276fc1b.jpg
javascript:void(0);

Laoling Tieying Project

Total Installed Capacity: 15MW
Fuel Type: Solar
COD: 2016
c100538
/encgnneh/c100537/2017-12/04/cc65ae4eca6f46cfa279e0029469a308/images/10cb70fd6a394677bf4eea5062902ebe.jpg
javascript:void(0);

Wulan Project

Total Installed Capacity: 30MW
Fuel Type: Solar
COD: 2013
c100537
/encgnneh/c100536/2017-12/04/c051fc9ce2a246518ecaa08ae32b51ad/images/8ba9345aea2b4a15b15994eb205c609b.jpg
javascript:void(0);

Xitieshan I Project

Total Installed Capacity: 10MW
Fuel Type: Solar
COD: 2010
c100536
/encgnneh/c100536/2017-12/04/66cbed87597c4cabbe8948dc38aa7f0f/images/3980dcef53e34db79c1bd9844c4956ed.jpg
javascript:void(0);

Xitieshan II Project

Total Installed Capacity: 30MW
Fuel Type: Solar
COD: 2011
c100536
/encgnneh/c100536/2017-12/04/7e2761f5ea6a406680204537ff419b7b/images/8261262db2ce43cea5b733df0331199d.jpg
javascript:void(0);

Xitieshan III Project

Total Installed Capacity: 60MW
Fuel Type: Solar
COD: 2011
c100536
/encgnneh/c100535/2017-12/04/ceb1c440c37445e19e644d0dedaaf534/images/7f57386b92004a7c8d156d4ad383c8cb.jpg
javascript:void(0);

Airport I Project

Total Installed Capacity: 9.9MW
Fuel Type: Solar
COD: 2013
c100535
/encgnneh/c100535/2017-12/04/658fd36da31e49d197bf2dc736889334/images/3987ec195f084dc38acbcf94058eb488.jpg
javascript:void(0);

Airport II Project

Total Installed Capacity: 4.5MW
Fuel Type: Solar
COD: 2015
c100535
/encgnneh/c100535/2017-12/04/c84599b2530140b2a6830c4385bc3ed9/images/a492f3abb0de45be83ecea3a89451711.jpg
javascript:void(0);

Shangyang Project

Total Installed Capacity: 2 MW
Fuel Type: Solar
COD: 2016
c100535
/encgnneh/c100534/2017-12/04/e607445a033244cda20af24432e37195/images/3ec0c30a33e74666b22bbf6419d05cd2.jpg
javascript:void(0);

Jinta Project

Total Installed Capacity: 9MW
Fuel Type: Solar
COD: 2012
c100534
/encgnneh/c100533/2017-12/04/74bfff3b9e34458e8d1bd59e7e87bb2c/images/4c7962d68a224bff9cd4e3ac16f7546a.jpg
javascript:void(0);

Dunhuang I Project

Total Installed Capacity: 9MW
Fuel Type: Solar
COD: 2012
c100533
/encgnneh/c100532/2017-12/04/23ad9cc056864dc1b2aa678d2895443a/images/30d5e676dbc843b38e602eef9004cb00.jpg
javascript:void(0);

Jiaxing Project

Total Installed Capacity: 10.6MW
Fuel Type: Solar
COD: 2014,2015
c100532
/encgnneh/c100533/2016-11/28/92969e57ad1c497bb9ac29407e3e677e/images/fa32ec96b83944ca9f0eb3cb1d0e9bff.jpg
javascript:void(0);

Dunhuang II Project

Total Installed Capacity: 9MW
Fuel Type: Solar
COD: 2012
c100533
/encgnneh/c100551/2017-12/04/2f808cc753984ab686cb23cd3b824dbe/images/4f772047be744504a609a9b573b792ce.jpg
javascript:void(0);

Mianyang Hydro Project in Sichuan

It is a hydro project in Sichuan, the PRC, located in the Economic Development Zone of Mianyang, the second largest city in Sichuan province and downstream of the confluence of three rivers. The project, which we commissioned, is also located in the Sanjiang Water Control and Conservation complex, a multi-purpose project for irrigation, flood control and power generation. Power is purchased by Sichuan Provincial Electric Power Company.

Total Installed Capacity: 51 MW
Fuel Type: Hydro
COD: 2004
c100551
/encgnneh/c100550/2017-12/04/9800aa0f4c244f26873ea3c6db66daa0/images/8c65e121351b41c3916b1d05dffab82c.jpg
javascript:void(0);

Fushi Hydro Project in Guangxi (Phase I)

It is a hydro project in Guangxi, the PRC, located along the Rong River, downstream from the town of Fushi and near Liuzhou, an industrial city in the Guangxi Zhuang Autonomous Region where steel, automobiles and cement are produced.

Total Installed Capacity: 54 MW
Fuel Type: Hydro
COD: 2001
c100550
/encgnneh/c100550/2017-12/04/622139e3f9d543b5bcd94bdfc96f7463/images/ce029ece1e6044418e467879d92ee461.jpg
javascript:void(0);

Fushi Hydro Project in Guangxi (Phase II)

It is a hydro project in Guangxi, the PRC, adjacent to existing 54 MW Phase I Hydro Project site, which is an expansion of Phase I.

Total Installed Capacity: 18 MW
Fuel Type: Hydro
COD: 2015
c100550
/encgnneh/c100549/2017-12/04/fcf4fbe399ce4595a0fd437dea5fd7cd/images/c5c86d1d80404c1392074d7eadaaa10e.jpg
javascript:void(0);

Zuojiang Hydro Project in Guangxi

It is a hydro project in Guangxi, the PRC, located along the Zuo River. Power is purchased by Guangxi Power Grid Company.

Total Installed Capacity: 72 MW
Fuel Type: Hydro
COD: 2000
c100549
/encgnneh/c101225/2017-12/04/044e7ef90a2c45068234cb99159d3c8c/images/e0ba8e037a8d4ec49a4b30d6b60fd20d.jpg
javascript:void(0);

Jinqiao Steam Project in Shanghai

It is a steam coal-fired project in Shanghai, the PRC, and has franchise rights to supply steam throughout the Jinqiao EPZ in Pudong, Shanghai.

Total Installed Capacity: 295 tons/hour
Fuel Type: Coal
COD: 2008
c101225
/encgnneh/c101224/2017-12/04/4f51163f75144d7a9fe7a628ffeb6e9e/images/e98becce564f460883fe0eea1d8afa9d.jpg
javascript:void(0);

Haian Cogen Project in Jiangsu

It is a coal-fired cogen project in Jiangsu, the PRC, located in the Haian ETD Zone in Jiangsu province. The project carries the capability to not only generate power but also to focus on heat supply, thereby serving the purposes of energy saving and emission reduction and the broader application of its fluidized-bed boilers, which are capable of burning low heat content coal of lesser quality, such as feed slurry, anthracite and lignite, thereby making composite utilization possible and reducing fuel costs.

Total Installed Capacity: 27 MW
Fuel Type: Coal
COD: 2005
c101224
/encgnneh/c101223/2017-12/04/a1c83b8a98ad470e96901d5062e4ee3b/images/44fb8a2cc0024810ac185d81a6c6ab40.jpg
javascript:void(0);

Nantong Cogen Project in Jiangsu

It is a coal-fired cogen project in Jiangsu, the PRC, located in the Nantong ETD Zone in Jiangsu province. Cogeneration involves the production of electricity and steam using coal.

Total Installed Capacity: 48 MW
Fuel Type: Coal
COD: 2000 (Phase I); 2005 (Phase II-A); 2007 (Phase II-B)
c101223
/encgnneh/c101222/2017-12/04/00cf5e04f45f4ebcbc21c070b0e50e4e/images/973545f9f66544ddb59a7bbba3fb1948.jpg
javascript:void(0);

Daesan Oil-fired Project in Korea (Phase I)

Daesan I Power Project is a 507 MW oil-fired combined cycle facility located in the Daesan industrial complex in the western part of Korea approximately 150 kilometers from Seoul. Daesan I Power Project began commercial operation in 1998. The project, consisting of four gas turbines and a steam turbine, supplies electricity to the Korean power grid.

Total Installed Capacity: 507 MW
Fuel Type: Diesel oil
COD: 1998
c101222
/encgnneh/c101221/2017-12/04/a6164322aaec4fab9048abe189bd5b02/images/eb4e91162bfc4f168bea8be8e7fb5ecb.jpg
javascript:void(0);

Huangshi Coal-fired Project in Hubei (Phase I)

Huangshi I coal-fired project is comprised of an inseparable 50% interest in a 200 MW unit (Part I) and two 330 MW units (Part II), totaling 760 MW. Part I is located in Huangshi City, 120 km from Wuhan, the capital of Hubei Province. Part II is located on the outskirts (Xisaishan) of Huangshi City, approximately 10 km from Part I, and about 400 m from the Yangzi River.

c101221
/encgnneh/c101221/2017-12/04/89a64b42721e4747b56971b23beca00b/images/a26223a2b14f42fcb904604779d43ffa.jpg
javascript:void(0);

Huangshi Coal-fired Project in Hubei (Phase II)

Huangshi II coal-fired project has a gross capacity of 1,360.0 MW and is a base load facility located in Huangshi, near Wuhan, the capital of Hubei province. Huangshi II coal-fired project consists of two domestically manufactured ultra super critical coal fired units with a gross capacity of 680.0 MW. Unit 1 commenced commercial operation in December 2010, and Unit 2 commenced commercial operation in April 2014.

c101221
/encgnneh/c101220/2017-12/04/f58f3658fa8c4fb48bf8da91acb7835e/images/013276c99f8546faa3122869bf4b2e31.jpg
javascript:void(0);

Puguang Coal-fired Project in Henan

Puguang Power Project is a 2x125MW coal-fired power plant located at 11km from Nanyang City, Henan Province. The two units were put into operational in February and June 1999 respectively.

Total Installed Capacity: 250 MW
Fuel Type: Coal
COD: 1999
c101220
/encgnneh/c100541/2017-12/04/3e328326613a453787de5bddfa54dc64/images/723693d0981246618ec381548073f734.jpg
javascript:void(0);

Hanneng Gas-fired Project in Wuhan

It is a gas-fired project in Hubei, the PRC, located in the Wuhan Economic and Technological Development Zone, Hubei province. The project commenced simple-cycle commercial operation in December 1996 and combined-cycle commercial operation in October 1997. The project units, which were previously fired with heavy fuel oil, were converted to fire with natural gas in July 2005.

Total Installed Capacity: 176.5 MW
Fuel Type: Natural gas
COD: 2005 (upon conversion from oil-fired)
c100541
/encgnneh/c100540/2017-12/04/89787c6c42fe469db7e3b841e4f15839/images/a367f311de234ccc940a647477570778.jpg
javascript:void(0);

Yulchon Gas-fired Project in Korea (Phase I)

Yulchon Power Project is a 577.4 MW gas-fired combined cycle power project with an intermediate to peaking facility located at the Yulchon Industrial Complex, Jeollanam-do, in the southern part of the Korean peninsula.

Total Installed Capacity: 577.4 MW
Fuel Type: Liquefied natural gas
COD: 2005
c100540
/encgnneh/c100540/2017-12/04/a66b2b2eadd94132bbbfce8c2a411869/images/c585ea7c8a86401084ecb63d88aa4e6d.jpg
javascript:void(0);

Yulchon Gas-fired Project in Korea (Phase II)

Yulchon II Power Project is a 946.3 MW gas-fired combined cycle power project located adjacent to Yulchon I Power Project at the Yulchon Industrial Complex, Jeollanam-do, in the southern part of the Korean peninsula. Yulchon II Power Project achieved combined cycle COD in April 2014.

Total Installed Capacity: 946.3 MW
Fuel Type: Liquefied natural gas
COD: 2014
c100540
/encgnneh/c100540/2017-12/04/bf9385673bd74ccb8eb6a74ea79d14a0/images/fc0d751814b64ce48e50d9b7cb90e8c3.jpg
javascript:void(0);

Yulchon Fuel Cell Project in Korea

The Yulchon Fuel Cell Project consists of 15.4 MW of fuel cell projects, comprising a Phase I 4.8 MW fuel cell project, a Phase II 5.6 MW fuel cell project and a Phase III 5 MW fuel cell project.

Total Installed Capacity: 4.8 MW (Phase I); 5.6 MW (Phase II); 5 MW (Phase III)
Fuel Type: Liquefied natural gas
COD: 2009 (Phase I); 2011 (Phase II); 2015(Phase III)
c100540

AltStyle によって変換されたページ (->オリジナル) /