Plant Data of Fukushima Daiichi Nuclear Power Station at the time of the Tohoku-Chihou-Taiheiyou-Oki Earthquake

1. Description of data

<Reference: Reports posted in the past>
Reported on May 16, 2011

2. Chart

<Reference: Reports posted in the past>
Unit 2 Unit 3 Unit 5(1) Unit 6(1)

3. Data of abnormal events including alarm records

<Reference> Additional data from the date when printing was started to the date when the reactor was brought to cold shutdown state [Added onJuly 17, 2013]
Unit 5 Unit 6(1) Unit 6(2) Unit 6(3)

4. Operation logs

5. Data of process computers

6. Data of transient recorders

Additional data of the transient recording device [Added onJuly 17, 2013]

(Reference) Additional data of the transient recording device [Added on May 10, 2013]

* As for the time data obtained every minute by the transient recording device at Unit 1 in Fukushima Daiichi NPS (announced on May 10), the digit of second has not been displayed. Therefore, we have corrected this error. (Corrected on May 21)

7. Compilation of operation records

<Reference: Reports posted in the past>
After corrected on June 13, 2011 Reported on May 16, 2011
<Reference>Additional data of the fire fighter pump flowmeter during the measurement period of the Accident Management Panel [September 9, 2011]

8. Plant parameters

  • Graph [Corrected on July 17, 2013]

<Reference: Reports posted in the past>
After corrected on June 13, 2011 Reported on May 16, 2011

  • Data [Corrected on July 17, 2013]

<Reference: Reports posted in the past>
After corrected on June 13, 201 Reported on May 16, 2011