TEPCO Tokyo Electric Power Company Holdings


Handouts at press conference 2016 | Archives

The recent data is here.


+

December,2016

Dec 26, 2016
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings (PDF 240KB)
Dec 22, 2016
Progress of Landside Impermeable Wall freezing: Phase 2 of the first stage(PDF 9.53MB)
Dec 22, 2016
Survey results (7th) concerning the improvement of work environment at Fukushima Daiichi Nuclear Power Station and direction of future improvement (PDF 334KB)
Dec 20, 2016
Nuclide Analysis Results of Fish and Shellfish<Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station>Samples collected in the second quarter of FY2016(PDF 83.9KB)
Dec 20, 2016
Nuclide Analysis Results of Fish and Shellfish(Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station)(excluding the port)(PDF 73.5KB)
Dec 20, 2016
Nuclide Analysis Results of Fish (Port Area of Fukushima Daiichi Nuclear Power Station) (PDF 33.8KB)
Dec 20, 2016
Transportation of the supporting part of a new roof for the Unit 3 fuel removal at Fukushima Daiichi Nuclear Power Station(PDF 554KB)
Dec 19, 2016
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(PDF 224KB)
Dec 15, 2016
Progress of Landside Impermeable Wall freezing:the Second Stage (PDF 1.38MB)
Dec 12, 2016
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(PDF 114KB)
Dec 8, 2016
Progress of Landside Impermeable Wall freezing: the Second Stage (PDF 4.05MB)
Dec 5, 2016
Changes in the amount of water transferred from groundwater drains to reactor and turbine buildings and in the amount of groundwater and rainwater flowing into the buildings(PDF 250KB)
Dec 1, 2016
Progress of Landside Impermeable Wall freezing: Phase 2 of the first stage(PDF 5.91MB)

Top


+

+

+

September,2016

Sep 30, 2016
A New Administration Building at Fukushima Daiichi Nuclear Power Station (PDF 164KB)
Sep 29, 2016
Progress of Landside Impermeable Wall freezing:Phase 2 of the first stage (PDF 7.33MB)
Sep 21, 2016
Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the port)(PDF 45.0KB)
Sep 21, 2016
Nuclide Analysis Results of Fish (Port Area of Fukushima Daiichi Nuclear Power Station) (PDF 33.9KB)
Sep 21, 2016
Conditions of the bank protection area at Fukushima Daiichi Nuclear Power Station (PDF 105KB)
Sep 16, 2016
Nuclide Analysis Results of Fish and Shellfish<The Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station>Samples collected in the first quarter of FY2016 (PDF 63.4KB)
Sep 15, 2016
Progress of Landside Impermeable Wall freezing:Phase 2 of the first stage(PDF 5.85MB)
Sep 13, 2016
Analysis of water quality in the drain sump pit of Units 1-2exhaust stack at Fukushima Daiichi Nuclear Power Station(PDF 123KB)
Sep 13, 2016
First Wall Panel Removal from Unit 1 Building Cover at Fukushima Daiichi Nuclear Power Station(PDF 196KB)
Sep 9, 2016
Water level measurement in the drain sump pit of Units 1-2exhaust stack at Fukushima Daiichi Nuclear Power Station (PDF 215KB)
Sep 8, 2016
Progress of Landside Impermeable Wall freezing:Phase 2 of the first stage (PDF 4.48MB)
Sep 5, 2016
Progress of on-site preparation work (opening of the pit cover) to examine the drain sump pit of Units 1-2 exhaust stack at Fukushima Daiichi Nuclear Power Station (PDF 289KB)
Sep 1, 2016
Progress of Landside Impermeable Wall freezing:Phase 2 of the first stage(PDF 5.10MB)

Top


+

+

+

+

+

April,2016

Apr 28, 2016
Summary of radiation data in April 2016 (March 31 to April 27, 2016) / Concentrations of radioactive materials in seawater around Fukushima Daiichi Nuclear Power Station before and after the closure of Seaside Impermeable Wall / Pumped up groundwater through Subdrain and Groundwater Drain systems and it water analysis (PDF 2.34MB)
Apr 28, 2016
Progress of Landside Impermeable Wall freezing:Phase 1 of the first stage(PDF 5.17MB)
Apr 21, 2016
Progress of Landside Impermeable Wall freezing:Phase 1 of the first stage (PDF 4.65MB)
Apr 15, 2016
Nuclide Analysis Results of Fish and Shellfish (Ocean Area Within 20km Radius of Fukushima Daiichi Nuclear Power Station) (excluding the Port Area) (PDF 51.3KB)
Apr 15, 2016
Nuclide Analysis Results of Fish <Port Area of Fukushima Daiichi Nuclear Power Station> (PDF 34.7KB)
Apr 14, 2016
Progress of Landside Impermeable Wall freezing:Phase 1 of the first stage (PDF 1.64MB)
Apr 11, 2016
Sellafield Ltd and Tokyo Electric Power Company Holdings cooperate outreach of communications(PDF 110KB)
Apr 7, 2016
Landside Impermeable Wall Freezing Progres Report: Soil Temperatures (Temperatures in Thermometer Pipes)(PDF 507KB)
Apr 7, 2016
A Week After the Official Activation of Landside Impermeable Wall (frozen soil wall, or "ice wall" ) (PDF 376KB)
Apr 6, 2016
Start of Nozzle Unit Installations for Mist Sprinkler Associated with the Dismantling of Unit 1 Reactor Building Cover at Fukushima Daiichi Nuclear Power Station (PDF 648KB)

Top


+

+

+
Get ADOBE READER
Acrobat® Reader In Order to view the PDF documents, you will need a software product called Adobe® Acrobat® Reader installed on your computer. You can download this software product for free from Adobe's Web site by clicking the left button:

AltStyle によって変換されたページ (->オリジナル) /