Environment planning that introduced natural light and wind
Environment planning that introduced natural light and wind
Louver and Illuminance distribution
Air-conditioning plan of the typical_floor
Rooftop gardening
Comparison of amounts of insolation receiving sunshiny around building
Special Features
Q-1 Indoor Environment |
- Insolation cover by exterior louver
- Task / ambient air conditioning
- Introduction of natural lighting through exterior louver and central void
- Natural ventilation inlet area 43cm2/m2
- Whole building no smoking
|
Q-2 Quality of Service |
- Raised floor 200mm height
- Power source capacity 40VA / m2
- Ceiling height 3.0m
- Floor height 4.2m
- Plane and section composition in which communications are activated
- High aseismic design performance
- Vibration control system
- Electric and telecommunication room are set up on the third floor.
- Rainwater use system and Recycling of domestic wastewater
- Floor live load allowance 4900N / m2
|
Q-3 Outdoor Environment on Site |
- Gate space of MINATO MIRAI 21 district
- Passage(NISSAN Walk) where city blocks are connected
- Open-use Gallery for public
- Rooftop gardening
|
LR-1 Energy |
- PAL value 25% reduced
- Natural energy usage 88MJ / m2 / year
- ERR value (integration of CEC values) reduced by 20%
- Introduction of BEMS and continual improvement for energy management
|
LR-2 Resources and Materials |
- Water conservation measures, e.g. automatic faucets
- Rainwater use system and Recycling of domestic wastewater
- Inert gas fire extinguishers
- Corrugated cardboard duct
|
LR-3 Off-site Environment |
- Atmospheric pollution sources eliminated by using DHC
- Garbage processor
- Wind assessment
- Rainwater use system and Recycling of domestic wastewater
|
Other Features
N/A