China
Shidaowan 2
Under Construction
Details
| Reactor Type | Pressurized Water Reactor (or PWR) |
|---|---|
| Model | Hualong One |
| Owner | |
| Operator |
Timeline
| Construction Start | Thursday, 8 May 2025 |
|---|
Specifications
| Capacity Net | 1134 MWe |
|---|---|
| Capacity Gross | 1225 MWe |
| Thermal Capacity | 3180 MWt |
| Design Net Capacity | 1134 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|