India
Kakrapar 4
Operable
Details
| Reactor Type | Pressurized Heavy Water Reactor (or PHWR) |
|---|---|
| Model | PHWR-700 |
| Owner | Nuclear Power Corporation Of India Ltd |
| Operator | Nuclear Power Corporation Of India Ltd |
Timeline
| Construction Start | Monday, 22 November 2010 |
|---|---|
| First Criticality | Sunday, 17 December 2023 |
| First Grid Connection | Tuesday, 20 February 2024 |
| Commercial Operation | Sunday, 31 March 2024 |
Specifications
| Capacity Net | 630 MWe |
|---|---|
| Capacity Gross | 700 MWe |
| Thermal Capacity | 2166 MWt |
| Design Net Capacity | 630 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
| Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
|---|---|---|---|---|---|---|---|---|
| 2024 | 630 | 5973 | 3065.42 | 83.90 | 72.10 | 72.10 | 71.90 | 71.90 |