Details
Reactor Type |
Pressurized Water Reactor (or PWR) |
Model |
France CPI |
Owner |
Korea Hydro And Nuclear Power Co. |
Operator |
Korea Hydro And Nuclear Power Co. |
Timeline
Construction Start |
Tuesday, 5 July 1983 |
First Criticality |
Saturday, 25 February 1989 |
First Grid Connection |
Friday, 14 April 1989 |
Commercial Operation |
Saturday, 30 September 1989 |
Specifications
Capacity Net |
957 MWe |
Capacity Gross |
1011 MWe |
Thermal Capacity |
2775 MWt |
Design Net Capacity |
903 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year |
Reference Unit Power (MWe) |
Annual Time Online (Hours) |
Electricity Supplied (GWh) |
Operation Factor (%) |
Energy Availability Annual (%) |
Energy Availability Cumulative (%) |
Load Factor Annual (%) |
Load Factor Cumulative (%) |
1989 |
- |
- |
- |
- |
- |
- |
- |
- |
1990 |
920 |
6395 |
5547.29 |
73.00 |
73.00 |
73.00 |
68.80 |
68.80 |
1991 |
920 |
7603 |
6671.16 |
86.80 |
86.80 |
79.90 |
82.80 |
75.80 |
1992 |
920 |
7686 |
7076.88 |
87.50 |
87.50 |
82.40 |
87.60 |
79.70 |
1993 |
920 |
7693 |
7230.22 |
87.80 |
87.80 |
83.80 |
89.70 |
82.20 |
1994 |
890 |
7315 |
6889.67 |
83.50 |
81.50 |
83.30 |
88.40 |
83.40 |
1995 |
920 |
8223 |
7810.26 |
93.90 |
93.40 |
85.00 |
96.90 |
85.70 |
1996 |
920 |
8151 |
7696.38 |
92.80 |
91.00 |
85.90 |
95.20 |
87.10 |
1997 |
920 |
7534 |
7055.18 |
86.00 |
84.30 |
85.70 |
87.50 |
87.10 |
1998 |
920 |
7947 |
7388.87 |
90.70 |
88.30 |
86.00 |
91.70 |
87.60 |
1999 |
920 |
8748 |
7815.17 |
99.90 |
94.50 |
86.80 |
97.00 |
88.60 |
2000 |
920 |
7330 |
6836.81 |
83.40 |
82.30 |
86.40 |
84.60 |
88.20 |
2001 |
920 |
7848 |
7268.56 |
89.60 |
89.20 |
86.60 |
90.20 |
88.40 |
2002 |
920 |
6939 |
6485.83 |
79.20 |
78.30 |
86.00 |
80.50 |
87.80 |
2003 |
920 |
7686 |
7253.75 |
87.70 |
87.10 |
86.10 |
90.00 |
87.90 |
2004 |
920 |
7888 |
7253.74 |
89.80 |
88.60 |
86.30 |
89.80 |
88.00 |
2005 |
920 |
7218 |
6582.35 |
82.40 |
80.70 |
85.90 |
81.70 |
87.60 |
2006 |
937 |
8510 |
7882.51 |
97.20 |
96.70 |
86.60 |
96.00 |
88.20 |
2007 |
937 |
7946 |
7391.65 |
90.70 |
90.00 |
86.80 |
90.00 |
88.20 |
2008 |
942 |
7752 |
7264.19 |
88.20 |
87.90 |
86.80 |
87.80 |
88.20 |
2009 |
942 |
8760 |
8258.31 |
100.00 |
100.00 |
87.50 |
100.10 |
88.80 |
2010 |
942 |
7991 |
7506.86 |
91.20 |
90.80 |
87.60 |
91.00 |
88.90 |
2011 |
942 |
7003 |
6571.07 |
79.90 |
79.30 |
87.30 |
79.60 |
88.50 |
2012 |
961 |
8661 |
8325.47 |
98.60 |
98.30 |
87.80 |
98.60 |
89.00 |
2013 |
962 |
7740 |
7446.49 |
88.40 |
88.00 |
87.80 |
88.40 |
88.90 |
2014 |
965 |
7430 |
7161.63 |
84.80 |
84.40 |
87.60 |
84.70 |
88.80 |
2015 |
967 |
8760 |
8449.96 |
100.00 |
99.40 |
88.10 |
99.80 |
89.20 |
2016 |
969 |
7665 |
7373.63 |
87.30 |
86.60 |
88.00 |
86.60 |
89.10 |
2017 |
969 |
7858 |
7535.86 |
89.70 |
88.80 |
88.10 |
88.80 |
89.10 |
2018 |
967 |
5271 |
5046.21 |
60.20 |
59.60 |
87.00 |
59.60 |
88.00 |
2019 |
967 |
6874 |
6629.49 |
78.50 |
78.10 |
86.70 |
78.30 |
87.70 |
2020 |
967 |
7849 |
7544.08 |
89.40 |
88.70 |
86.80 |
88.80 |
87.70 |
2021 |
967 |
6606 |
6260.94 |
75.40 |
73.80 |
86.40 |
73.90 |
87.30 |
2022 |
967 |
8760 |
8427.91 |
100.00 |
99.90 |
86.80 |
99.50 |
87.70 |
2023 |
967 |
5879 |
5670.91 |
67.10 |
66.70 |
86.20 |
67.00 |
87.00 |
2024 |
957 |
7566 |
7311.17 |
86.10 |
85.80 |
86.20 |
87.00 |
87.00 |