Details
Reactor Type |
Pressurized Water Reactor (or PWR) |
Model |
France CPI |
Owner |
Korea Hydro And Nuclear Power Co. |
Operator |
Korea Hydro And Nuclear Power Co. |
Timeline
Construction Start |
Wednesday, 26 January 1983 |
First Criticality |
Thursday, 25 February 1988 |
First Grid Connection |
Thursday, 7 April 1988 |
Commercial Operation |
Saturday, 10 September 1988 |
Specifications
Capacity Net |
953 MWe |
Capacity Gross |
1014 MWe |
Thermal Capacity |
2775 MWt |
Design Net Capacity |
903 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year |
Reference Unit Power (MWe) |
Annual Time Online (Hours) |
Electricity Supplied (GWh) |
Operation Factor (%) |
Energy Availability Annual (%) |
Energy Availability Cumulative (%) |
Load Factor Annual (%) |
Load Factor Cumulative (%) |
1988 |
- |
- |
- |
- |
- |
- |
- |
- |
1989 |
920 |
5821 |
5205.36 |
66.40 |
66.40 |
66.40 |
64.60 |
64.60 |
1990 |
920 |
7156 |
6166.21 |
81.70 |
81.70 |
74.10 |
76.50 |
70.60 |
1991 |
920 |
7970 |
7244.32 |
91.00 |
91.00 |
79.70 |
89.90 |
77.00 |
1992 |
920 |
7675 |
7020.77 |
87.40 |
87.40 |
81.60 |
86.90 |
79.50 |
1993 |
920 |
7651 |
6977.60 |
87.30 |
87.30 |
82.80 |
86.60 |
80.90 |
1994 |
890 |
7293 |
6878.53 |
83.20 |
82.00 |
82.60 |
88.20 |
82.10 |
1995 |
920 |
7698 |
7153.82 |
87.90 |
85.70 |
83.10 |
88.80 |
83.00 |
1996 |
920 |
7631 |
7113.66 |
86.90 |
85.40 |
83.40 |
88.00 |
83.70 |
1997 |
920 |
7323 |
6801.00 |
83.60 |
82.20 |
83.30 |
84.40 |
83.80 |
1998 |
920 |
8256 |
7642.97 |
94.20 |
91.40 |
84.10 |
94.80 |
84.90 |
1999 |
920 |
7639 |
7161.55 |
87.20 |
86.10 |
84.30 |
88.90 |
85.20 |
2000 |
920 |
7736 |
7230.77 |
88.10 |
86.30 |
84.40 |
89.50 |
85.60 |
2001 |
920 |
7483 |
7022.30 |
85.40 |
84.50 |
84.40 |
87.10 |
85.70 |
2002 |
920 |
6052 |
5462.40 |
69.10 |
76.00 |
83.80 |
67.80 |
84.40 |
2003 |
920 |
7446 |
6371.56 |
85.00 |
85.20 |
83.90 |
79.10 |
84.10 |
2004 |
920 |
7970 |
7420.13 |
90.70 |
89.30 |
84.30 |
91.80 |
84.60 |
2005 |
920 |
8760 |
8245.04 |
100.00 |
99.80 |
85.20 |
102.30 |
85.60 |
2006 |
939 |
7769 |
7212.78 |
88.70 |
87.50 |
85.30 |
87.70 |
85.70 |
2007 |
940 |
7747 |
7262.21 |
88.40 |
88.00 |
85.40 |
88.20 |
85.80 |
2008 |
945 |
8747 |
8177.42 |
99.60 |
99.10 |
86.20 |
98.50 |
86.50 |
2009 |
945 |
8024 |
7493.10 |
91.60 |
91.00 |
86.40 |
90.50 |
86.70 |
2010 |
945 |
7988 |
7437.82 |
91.20 |
89.80 |
86.60 |
89.80 |
86.80 |
2011 |
945 |
8730 |
8206.10 |
99.70 |
99.10 |
87.10 |
99.10 |
87.40 |
2012 |
960 |
6988 |
6640.08 |
79.60 |
78.90 |
86.80 |
79.20 |
87.00 |
2013 |
960 |
7545 |
7233.32 |
86.10 |
85.50 |
86.70 |
86.00 |
87.00 |
2014 |
963 |
8033 |
7762.26 |
91.70 |
91.50 |
86.90 |
92.00 |
87.20 |
2015 |
966 |
7747 |
7458.09 |
88.40 |
87.90 |
86.90 |
88.10 |
87.20 |
2016 |
968 |
7171 |
6901.60 |
81.60 |
81.10 |
86.70 |
81.20 |
87.00 |
2017 |
968 |
6622 |
6351.26 |
75.60 |
74.90 |
86.30 |
74.90 |
86.60 |
2018 |
966 |
5770 |
5547.64 |
65.90 |
65.60 |
85.60 |
65.60 |
85.80 |
2019 |
966 |
7322 |
7060.57 |
83.60 |
83.20 |
85.50 |
83.40 |
85.80 |
2020 |
966 |
6921 |
6679.80 |
78.80 |
78.40 |
85.30 |
78.70 |
85.50 |
2021 |
966 |
8364 |
8051.79 |
95.50 |
94.70 |
85.60 |
95.20 |
85.80 |
2022 |
966 |
7488 |
7165.36 |
85.50 |
85.00 |
85.60 |
84.70 |
85.80 |
2023 |
966 |
6538 |
6316.71 |
74.60 |
74.20 |
85.20 |
74.60 |
85.50 |
2024 |
953 |
8376 |
8063.66 |
95.40 |
95.10 |
85.50 |
96.30 |
85.80 |