Details
Reactor Type |
Pressurized Water Reactor (or PWR) |
Model |
CP2 |
Owner |
EDF |
Operator |
EDF |
Timeline
Construction Start |
Sunday, 15 April 1979 |
First Criticality |
Monday, 9 April 1984 |
First Grid Connection |
Monday, 14 May 1984 |
Commercial Operation |
Monday, 10 September 1984 |
Specifications
Capacity Net |
915 MWe |
Capacity Gross |
956 MWe |
Thermal Capacity |
2785 MWt |
Design Net Capacity |
880 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year |
Reference Unit Power (MWe) |
Annual Time Online (Hours) |
Electricity Supplied (GWh) |
Operation Factor (%) |
Energy Availability Annual (%) |
Energy Availability Cumulative (%) |
Load Factor Annual (%) |
Load Factor Cumulative (%) |
1984 |
880 |
4380 |
3272.00 |
92.70 |
91.90 |
91.90 |
89.70 |
89.70 |
1985 |
880 |
6557 |
5247.40 |
74.80 |
72.50 |
77.40 |
68.10 |
73.50 |
1986 |
880 |
7456 |
5967.08 |
85.10 |
89.20 |
82.50 |
77.40 |
75.20 |
1987 |
880 |
6013 |
4721.40 |
68.60 |
75.10 |
80.20 |
61.20 |
71.00 |
1988 |
880 |
6679 |
4773.00 |
76.00 |
98.60 |
84.50 |
61.80 |
68.80 |
1989 |
880 |
6571 |
5577.93 |
75.00 |
72.80 |
82.30 |
72.40 |
69.50 |
1990 |
915 |
7499 |
6129.16 |
85.60 |
85.20 |
82.80 |
76.50 |
70.60 |
1991 |
915 |
7374 |
6003.22 |
84.20 |
84.80 |
83.00 |
74.90 |
71.20 |
1992 |
915 |
6323 |
5174.61 |
72.00 |
71.00 |
81.60 |
64.40 |
70.40 |
1993 |
915 |
7232 |
5715.35 |
82.60 |
73.90 |
80.70 |
71.30 |
70.50 |
1994 |
915 |
6428 |
5013.99 |
73.40 |
78.10 |
80.50 |
62.60 |
69.70 |
1995 |
915 |
7525 |
6032.66 |
85.90 |
84.30 |
80.80 |
75.30 |
70.20 |
1996 |
915 |
7724 |
5882.20 |
87.90 |
91.90 |
81.70 |
73.20 |
70.50 |
1997 |
915 |
6961 |
5347.79 |
79.50 |
80.20 |
81.60 |
66.70 |
70.20 |
1998 |
915 |
7758 |
6281.40 |
88.60 |
78.70 |
81.40 |
78.40 |
70.80 |
1999 |
915 |
7654 |
6316.70 |
87.40 |
87.80 |
81.80 |
78.80 |
71.30 |
2000 |
915 |
6914 |
5493.99 |
78.70 |
79.00 |
81.60 |
68.40 |
71.10 |
2001 |
915 |
7254 |
5867.85 |
82.80 |
79.60 |
81.50 |
73.20 |
71.20 |
2002 |
915 |
7307 |
6052.00 |
83.40 |
80.90 |
81.50 |
75.50 |
71.50 |
2003 |
915 |
7146 |
5779.36 |
81.60 |
76.80 |
81.20 |
72.10 |
71.50 |
2004 |
915 |
6074 |
5081.25 |
69.20 |
64.10 |
80.40 |
63.20 |
71.10 |
2005 |
915 |
7863 |
6941.58 |
89.80 |
87.80 |
80.80 |
86.60 |
71.80 |
2006 |
915 |
7520 |
6487.52 |
85.80 |
83.10 |
80.80 |
80.90 |
72.20 |
2007 |
915 |
6456 |
5435.78 |
73.70 |
68.10 |
80.30 |
67.80 |
72.00 |
2008 |
915 |
5750 |
4858.57 |
65.50 |
60.80 |
79.50 |
60.40 |
71.60 |
2009 |
915 |
7392 |
6365.97 |
84.40 |
79.90 |
79.50 |
79.40 |
71.90 |
2010 |
915 |
7004 |
6277.78 |
80.00 |
78.30 |
79.50 |
78.30 |
72.10 |
2011 |
915 |
7580 |
6741.60 |
86.50 |
85.00 |
79.70 |
84.10 |
72.60 |
2012 |
915 |
5899 |
5106.74 |
67.20 |
64.50 |
79.10 |
63.50 |
72.20 |
2013 |
915 |
7750 |
6866.75 |
88.50 |
88.20 |
79.40 |
85.70 |
72.70 |
2014 |
915 |
5148 |
4529.71 |
58.80 |
57.10 |
78.70 |
56.50 |
72.20 |
2015 |
915 |
7085 |
6297.99 |
80.90 |
78.70 |
78.70 |
78.60 |
72.40 |
2016 |
915 |
6144 |
4910.49 |
70.00 |
61.30 |
78.20 |
61.10 |
72.00 |
2017 |
915 |
6910 |
6067.31 |
78.90 |
76.00 |
78.10 |
75.70 |
72.10 |
2018 |
915 |
6425 |
5672.76 |
73.30 |
70.90 |
77.90 |
70.80 |
72.10 |
2019 |
915 |
6451 |
5632.07 |
73.60 |
71.00 |
77.70 |
70.30 |
72.00 |
2020 |
915 |
4917 |
4171.74 |
56.00 |
52.20 |
77.00 |
51.90 |
71.50 |
2021 |
915 |
7614 |
6628.24 |
86.90 |
83.50 |
77.20 |
82.70 |
71.80 |
2022 |
915 |
5207 |
4322.15 |
59.40 |
54.20 |
76.60 |
53.90 |
71.30 |
2023 |
915 |
6796 |
5869.28 |
77.60 |
73.30 |
76.50 |
73.20 |
71.40 |
2024 |
915 |
5207 |
4521.86 |
59.30 |
58.30 |
76.00 |
56.30 |
71.00 |