Hi All
We are live in sap4hana public cloud since 1/5/25 and use EAM to the max
Our consultant highlighted we can not have phase control between phase 5&6. As a result we have
- 1 phase control which is overkill
- 1 phase control we DO want but do not have (teamlead approval of WOs before PRs are issued/wo is released)
I read everywhere (e.g. below) you can just add phase controls. Can someone confirm this and are there nuances we should be aware of (e.g. linked to C&P process, PR to PO process)?
Request clarification before answering.