TRAFFIC SIGNAL PROGRESSION CALCULATOR
mmmmmmmm mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
Measurement: mi/hr, ft ft/s, ft Km/hr, m m/s, m Cycle Range: Min: Max:
Start: Group Offset: Cycle Length:
Types allowed (enter sum): 1 = normal 2 = lead−lag 4 = split−phase 8 = dual−green Band: centers Progressed Street
Special types (enter only one): -1 = route turns -2 = half-away -3 = half-toward Band: advice edges sides
split, green, offset, & band are fractions of cycle length. mode = computer-selected type Computed band: a t Needs JavaScript 1.5
CROSS STREET SPEEDDIST.TYPE SPLITGREENhalf cyclesoffsetmode a-bandt-bandsuggestions
1 toward-end
2
3
4
5
6
7
8
9
10
11
12
13
14
15
away-end

Jump to output area for transfer

Using this progression calculator

Links:


Transfer Area

Click TRANSFER to put data here.

Select the data, copy it, and then paste it into Notepad. Save as a Notepad .txt file, then import it as a comma delimited file into Excel.

Signal Line: street, speed, dist, type, split, green, HC dist, near HC, offset, LeadlaG,
A center, T center, A width, T width, A L sidbnd, A G sidbnd, T L sidbnd, T G sidbnd, A L edge, A G edge, T L edge, T G edge

Last Line: Progressed Street Name, Away band, Toward band, min cycle, max cycle, cycle len, offset, conversion

AltStyle によって変換されたページ (->オリジナル) /