Skip to content

DoDAF Architecting

PV-2 Project Timelines

The PV-2 "Project Timelines" provides a timeline perspective on programs. The PV-2 is intended primarily to support the acquisition and fielding processes including the management of dependencies between projects and the integration of DoD Directive 5000.1 "Defense Acquisition System" policies to achieve a successfully integrated capability. The PV-2 is not limited to the acquisition and fielding processes.

Guide: DoDAF Architecture Framework Version 2.02 – Page 164

The intended usage of the PV-2 includes:

  • Project management and control (including delivery timescales)
  • Project dependency risk identification
  • Management of dependencies
  • Portfolio management

The PV-2 provides an overview of a program or portfolio of individual projects, or initiatives, based on a timeline. Portfolios, Programs, Projects, and Initiatives may be broken into work streams to show the dependencies at a lower-level. For capability-based procurement, these work streams might conveniently be equated with JCA. Sometimes, however, it is more appropriate to consider these acquisition projects in their own right.

Where appropriate, the PV-2 may also summarize, for each of the projects illustrated, the level of maturity achieved across the DoDD 5000.1 policies at each stage of the Defense Acquisition System lifecycle, and the interdependencies between the project stages.

The PV-2 is intended primarily to support the acquisition and fielding processes including the management of dependencies between projects and the integration of DoDD 5000.1 policy to achieve a successfully integrated capability. However, the PV-2 is not limited to the acquisition and fielding processes. The information provided by the Model can be used to determine the impact of either planned or unplanned programmatic changes, and highlight opportunities for optimization across the delivery program. The inclusion of the DoDD 5000.1 policy information allows areas of concern that are outside the immediate scope being considered. Areas of concern identified across the DoDD 5000.1 Defense Acquisition System policies, e.g., a shortfall in training resource, can be coordinated across a program or group of projects, each of which require additional activity to be initiated for successfully delivery according to the project/program schedule.

AcqTips:

  • The DoDAF descriptions in this website are very generic and are mostly taken from the DoDAF Architecture Framework website. Make sure you visit the actual website for the most update information and a more thorough explanation of each viewpoint.
  • DoDAF Version 1.0, although outdated, has some good examples on how to construct AV’s, OV’s, and SV’s.

AcqLinks and References:

Updated: 9/27/2017

Leave a Reply

You must be logged in to post a comment.

Disclaimer: AcqNotes is not an official Department of Defense (DoD), Air Force, Navy, or Army website. Any information, products, services or hyperlinks contained within this website does not constitute any type of endorsement by the DoD, Air Force, Navy or Army. No federal endorsement of sponsors intended. The information contained in this Website is for informational purposes only and is not intended as a form of direction or advice and should not be relied upon as a complete definitive statement in relation to any specific issue. Access to and use of the information of this website is at the user's risk.

Copyright © 2025 AcqNotes LLC

AltStyle によって変換されたページ (->オリジナル) /