If you want to use the search function buttons, please enable JavaScript.
If you want to change the font size remains disabled JavaScript, please use your browser's font size change function and the like.
Menu
Close

Location

  1. HOME
  2. About NRA
  3. NRA Regional Offices
  4. Fukushima Daiichi NRA Regional Office

Fukushima Daiichi NRA Regional Office

Facilities to be inspected

  • • Fukushima Daiichi Nuclear Power Station, Tokyo Electric Power Company Holdings, Inc.

[画像:Fukushima Daiichi Nuclear Power Station]

Power Generation Facilities

Unit 1

Reactor Type
BWR
Capacity
460 MWe
Commissioning
March 26, 1971(Decommissioning, on April 19, 2012)

Unit 2

Reactor Type
BWR
Capacity
784 MWe
Commissioning
July 18, 1974(Decommissioning, on April 19, 2012)

Unit 3

Reactor Type
BWR
Capacity
784 MWe
Commissioning
March 27, 1976(Decommissioning, on April 19, 2012)

Unit 4

Reactor Type
BWR
Capacity
784 MWe
Commissioning
October 12, 1978(Decommissioning, on April 19, 2012)

Unit 5

Reactor Type
BWR
Capacity
784 MWe
Commissioning
April 18, 1978(Decommissioning, on January 31, 2014)

Unit 6

Reactor Type
BWR
Capacity
1100 MWe
Commissioning
October 24, 1979(Decommissioning, on January 31, 2014)

Present States of Operation

Location of the Nuclear Facilities

Futaba-machi and Okuma-machi, Futaba-gun, Fukushima Prefecture

Address

Minamisouma Center for Nuclear Emergency Response Measures, Fukushima Prefecture,
45-178 Aza-Sukakeba, Kaibama, Haramachi-ku, Minamisouma-shi, Fukushima, 975-0036

Phone: 0244-32-0600

Fax: 0244-32-0601

[フレーム]

History

  • • Fukushima Daiichi NRA Regional Office was established in September, 2012.
Back to Top

AltStyle によって変換されたページ (->オリジナル) /