Procurement Plan for Electric Power Facilities
(Category: Equipment and materials for internal combustion power stations)
(All information is subject to change without notice. Please note that our procurement transaction may already be in progress at the time of this announcement.)
NO. Description and Specifications Quantity Unit Required by the below
Expected RFQ
Month
Delivery Month Delivery Terms
1 mobile generator Mobile generator
Type: Gas turbine (self-propelled); power, 1600 kW / 2000kVA1 set
Shin China Internal-combustion Power
Station
Jul-2024 Mar-2026
Installation, adjustment
and field test
2 mobile generator Mobile generator
Type: Gas turbine (self-propelled); power, 1600 kW / 2000kVA1 set
Toyotama Internal-combustion Power
Station
Jan-2025 Oct-2026
Installation, adjustment
and field test
3 mobile generator Mobile generator
Type: Gas turbine (self-propelled); power, 1600 kW / 2000kVA1 set
Shin Tokunoshima Internal-combustion
Power Station
Sep-2025 Jun-2027
Installation, adjustment
and field test
4 mobile generator Mobile generator
Type: Gas turbine (self-propelled); power, 1600 kW / 2000kVA1 set
Shin Kikai Internal-combustion Power
Station
Sep-2026 Jun-2028
Installation, adjustment
and field test5Equipment and materials for internal combustion power
stations (engines)
Purchase, installation, adjustment and testing
of exhaust gas economize main body
Normal pressure, 0.7 MPa; capacity, 750 kg/Hr 1 set
Shin Tokunoshima Internal-combustion
Power Station
Dec-2024 Dec-2025
Installation, adjustment
and field test6Equipment and materials for internal combustion power
stations (engines)
Kuchinoerabujima No.1 diesel generator and
other
Diesel engine (150 kW), generator (187.5 kVA), etc. 1 set
Kuchierabujima Internal-combustion
Power Station
Feb-2025 Feb-2026
Installation, adjustment
and field test7Equipment and materials for internal combustion power
stations (engines)
Periodic maintenance work parts for diesel
engines
Engine parts 1 set Fukuoka Branch Office Apr-2025 May-2026 Delivery at place (DAP)8Equipment and materials for internal combustion power
stations (engines)
Periodic maintenance work parts for diesel
engines
Engine parts 1 set Fukuoka Branch Office Apr-2025 May-2026 Delivery at place (DAP)9Equipment and materials for internal combustion power
stations (engines)
Periodic maintenance work parts for diesel
engines
Engine parts 1 set Kagoshima Branch Office Feb-2025 Apr-2026 Delivery at place (DAP)10Equipment and materials for internal combustion power
stations (engines)
Periodic maintenance work parts for diesel
engines
Engine parts 1 set Kagoshima Branch Office Feb-2025 Apr-2026 Delivery at place (DAP)11Equipment and materials for internal combustion power
stations (engines)
Supply air heater purchase, installation,
adjustment and testing
Duct heater, motor-operated valve, indoor-use closed-type
self-standing vertical control panel
1 set
Shin Iki Internal-combustion Power
Station
Apr-2025 Feb-2026
Installation, adjustment
and field test12Equipment and materials for internal combustion power
stations (engines)
Purchase and installation of diesel engines,etc.Diesel engine (6000 kW), etc. 1 set
Toyotama Internal-combustion Power
Station
Nov-2025 Nov-2027
Installation, adjustment
and field test13Equipment and materials for internal combustion power
stations (generators)
Purchase and installation of generators and
others
Generator (7500 kVA), etc. 1 set
Toyotama Internal-combustion Power
Station
Nov-2025 Nov-2027
Installation, adjustment
and field test14equipment and materials for internal combustion power
stations (control facility)
Shin Iki Power Station: Telecommunications
interface board installation and adjustment
Telecommunications interface board carrying in, installation,
cable connection with existing facilities, testing, adjustment,etc.1 set
Shin Iki Internal-combustion Power
Station
Jun-2024 Mar-2026
Installation, adjustment
and field test15equipment and materials for internal combustion power
stations (control facility)
Ashibe Power Station: Installation and
adjustment of electric-supply station, etc.
Electric-supply station server carrying in, installation, cable
connection with existing facilities, testing, adjustment, etc.
1 set
Ashibe Internal-combustion Power
Station
Jun-2024 Mar-2026
Installation, adjustment
and field test16equipment and materials for internal combustion power
stations (control facility)
On-site wireless LAN purchase and
installation
Wireless LAN 1 set
Koshikijima No.1 Internal-combustion
Power Station
Jun-2024 Mar-2025
Installation and
adjustment17equipment and materials for internal combustion power
stations (control facility)
On-site wireless LAN purchase and
installation
Wireless LAN 1 set
Shin China Internal-combustion Power
Station
Dec-2024 Sep-2025
Installation and
adjustment18equipment and materials for internal combustion power
stations (control facility)
On-site wireless LAN purchase and
installation
Wireless LAN 1 set
Shin Yoron Internal-combustion Power
Station
Apr-2025 Mar-2026
Installation and
adjustment19equipment and materials for internal combustion power
stations (control facility)
Electric-supply station purchase and
installation
Position number; SV control, 50; SV display, 150; TM
normal Delivery at place (DAP), 20; TM subcommutation, 10
1 set
Koshikijima No.1 Internal-combustion
Power Station
Jul-2025 Dec-2026
Installation, adjustment
and field test20equipment and materials for internal combustion power
stations (control facility)
Electric-supply station purchase and
installation
Position number; SV control, 130; SV display, 450; TM
normal Delivery at place (DAP), 50; TM subcommutation, 30
1 set
Shin Tanegashima Internal-combustion
Power Station
Oct-2025 Mar-2027
Installation, adjustment
and field test
Procurement Plan for Electric Power Facilities
(Category: Equipment and materials for internal combustion power stations)
(All information is subject to change without notice. Please note that our procurement transaction may already be in progress at the time of this announcement.)
NO. Description and Specifications Quantity Unit Required by the below
Expected RFQ
Month
Delivery Month Delivery Terms21equipment and materials for internal combustion power
stations (control facility)
Electric-supply station purchase and
installation
Position number; SV control, 50; SV display, 170; TM
normal Delivery at place (DAP), 20; TM subcommutation, 10
1 set
Tanegashima No.1 Internal-combustion
Power Station
Apr-2026 Sep-2027
Installation, adjustment
and field test22equipment and materials for internal combustion power
stations (control facility)
Electric-supply station purchase and
installation
Position number; SV control, 60; SV display, 200; TM
normal Delivery at place (DAP), 30; TM subcommutation, 10
1 set
Shin Kikai Internal-combustion Power
Station
Apr-2026 Jun-2027
Installation, adjustment
and field test23equipment and materials for internal combustion power
stations (control facility)
Electric-supply station purchase and
installation
Position number; SV control, 60; SV display, 190; TM
normal Delivery at place (DAP), 30; TM subcommutation, 10
1 set
Shin China Internal-combustion Power
Station
Apr-2026 Sep-2027
Installation, adjustment
and field test24equipment and materials for internal combustion power
stations (control facility)
Electric-supply station purchase and
installation
Position number; SV control, 210; SV display, 610; TM
normal Delivery at place (DAP), 80; TM subcommutation, 40
1 set
Tatsugo Internal-combustion Power
Station
Oct-2026 Jun-2028
Installation, adjustment
and field test25equipment and materials for internal combustion power
stations (control facility)
Electric-supply station purchase and
installation
Position number; SV control, 40; SV display, 180; TM
normal Delivery at place (DAP), 20; TM subcommutation, 10
1 set
Shin Yoron Internal-combustion Power
Station
Jan-2027 Mar-2028
Installation, adjustment
and field test26equipment and materials for internal combustion power
stations (control facility)
Electric-supply station purchase and
installation
Position number; SV control, 100; SV display, 290; TM
normal Delivery at place (DAP), 50; TM subcommutation, 20
1 set
Shin Tokunoshima Internal-combustion
Power Station
Jan-2027 Jun-2028
Installation, adjustment
and field test27equipment and materials for internal combustion power
stations (control facility)
Electric-supply station purchase and
installation
Position number; SV control, 170; SV display, 540; TM
normal Delivery at place (DAP), 80; TM subcommutation, 20
1 set
Toyotama Internal-combustion Power
Station
Jan-2028 Sep-2029
Installation, adjustment
and field test28equipment and materials for internal combustion power
stations (control facility)
Electric-supply station purchase and
installation
Position number; SV control, 140; SV display, 510; TM
normal Delivery at place (DAP), 50; TM subcommutation, 40
1 set
Shin Iki Internal-combustion Power
Station
Apr-2028 Sep-2029
Installation, adjustment
and field test29Equipment and materials for internal combustion power
stations (other equipment)
Purchase, installation, adjustment and testing
of exhaust economizer main body and control
panel (diverted use of conventionally used
Natural circulation type exhaust gas economizer (steam
generation at 1.0 t/h)
1 set
Shin Iki Internal-combustion Power
Station
May-2025 Mar-2026
Installation, adjustment
and field test30Equipment and materials for internal combustion power
stations (other equipment)
Exhaust economizer main body purchase,
installation, adjustment and testing (diverted
use of conventionally used base)
Natural circulation type exhaust gas economizer (steam
generation at 1.0 t/h)
1 set
Toyotama Internal-combustion Power
Station
May-2025 Mar-2026
Installation, adjustment
and field test
31 transformers for substations (110 kV or lower) Main transformer
Capacity, 25/25/10 MVA; voltage, 6.6/66/6.9 kV; low noise,55dB1 set
Toyotama Internal-combustion Power
Station
Jun-2024 May-2026 Delivery at place (DAP)32Protection relay facilities for substations
(110 kV or lower)
Automatic switching panel 66 kV PT automatic switching board 1 set
Toyotama Internal-combustion Power
Station
Jun-2024 May-2025 Delivery at place (DAP)33Protection relay facilities for substations
(110 kV or lower)
Common relay panel 66 kV common relay panel 1 set
Toyotama Internal-combustion Power
Station
Jun-2024 May-2025 Delivery at place (DAP)34Protection relay facilities for substations
(110 kV or lower)
Protection relay panel, etc. 66 kV Sasuna–Toyotama relay panel (S + DZ) 1 set
Toyotama Internal-combustion Power
Station
Jun-2024 May-2025 Delivery at place (DAP)
35 Circuit breakers for substations (110 kV or lower) 72 kV circuit breaker
Vacuum circuit breaker (outdoor use); rated voltage, 72 kV;
rated current, 800 A
3 set
Toyotama Internal-combustion Power
Station
Jun-2024 May-2026 Delivery at place (DAP)
36 Circuit breakers for substations (110 kV or lower) 72 kV circuit breaker
Vacuum circuit breaker (outdoor use); rated voltage, 72 kV;
rated current, 800 A
3 set
Sasuna Internal-combustion Power
Station
Jun-2024 May-2025 Delivery at place (DAP)