Procurement Plan for Electric Power Facilities
(Category: Equipment and materials for nuclear power stations)
(All of information of this plan are subject to change without notice. There may be cases that procurement procedure are in progress at time of release of this plan.)
No. Quantity Unit Requesting Office/Station
Month of
quotation
Month of
delivery
Conditions of
Delivery
1 measuring and weighing equipment
Ge gamma-ray, multi-channel pulse-
height analyzer
Ge gamma-ray, multi-channel pulse-height analyzer 2 set Genkai Nuclear Power Station Nov-2023 Nov-2024
Installation and
adjustment
2 measuring and weighing equipment
Sendai Nuclear Power Station, waste
discharge facility
Ge gamma-ray, multi-channel pulse-height analyzer 1 set Sendai Nuclear Power Station Jan-2024 Mar-2025
Installation and
adjustment
3 Vehicle Portable diesel injection pump Major overhaul 1 set Genkai Nuclear Power Station Mar-2024 Jun-2024
Completion of
inspection4Equipment and materials for nuclear power plants
(radiation control equipment/waste control
equipment)
Element for ceramic filters Model: S6C-26002-D1515A, Dimensions: φ 60 x 1500 L 168 set Genkai Nuclear Power Station Apr-2024 Oct-2024
Completion of
inspection5Equipment and materials for nuclear power plants
(radiation control equipment/waste control
equipment)
Element for ceramic filters
Model: S6C-26002-D1515A x 184 pieces, S6C-26002-
D1515K x 184 pieces
1 set Genkai Nuclear Power Station Apr-2024 Oct-2024
Completion of
inspection6Equipment and materials for nuclear power plants
(radiation control equipment/waste control
equipment)
Genkai Unit 3, inspection of high-
temperature incineration volume reduction
facilities (including parts)
Inspection of high-temperature incineration volume
reduction facilities (including parts)
1 set Genkai Nuclear Power Station Jun-2024 Dec-2024
Completion of
inspection7Equipment and materials for nuclear power plants
(radiation control equipment/waste control
equipment)
Sendai Nuclear Power Station, radiation
measurement instruments for waste
discharge facilities
APD, entrance gate, tri-coder, label issuing device, etc.,
radiation measuring instrument (whole-body monitor,
etc.)
1 set Sendai Nuclear Power Station Jan-2024 Mar-2025
Installation and
adjustment8Equipment and materials for nuclear power plants
(radiation control equipment/waste control
equipment)
Sendai Nuclear Power Station, inspection
device for low-level radioactive solid waste
discharge
Addition of filling and solidified body inspection function
to the current specification, transfer to the waste
discharge facility
1 set Sendai Nuclear Power Station Oct-2023 Mar-2025
Installation and
adjustment9Equipment and materials for nuclear power plants
(radiation control equipment/waste control
equipment)
Primary/secondary ceramic filter element S6C-26002-D1515K/D1015K 1 set Sendai Nuclear Power Station Apr-2024 Sep-2024 Delivery10Equipment and materials for nuclear power plants
(equipment of fuel system)
Offsite transmission device (tentative
name)
Design, manufacture, installation and adjustment of
equipment
1 set Genkai Nuclear Power Station Feb-2024 Mar-2027
Installation and
adjustment
Description and Specifications
Procurement Plan for Electric Power Facilities
(Category: Equipment and materials for nuclear power stations)
(All of information of this plan are subject to change without notice. There may be cases that procurement procedure are in progress at time of release of this plan.)
No. Quantity Unit Requesting Office/Station
Month of
quotation
Month of
delivery
Conditions of
Delivery
Description and Specifications11Equipment and materials for nuclear power plants
(electrical equipment)
Low voltage electric motor of the primary
ventilation system
1 set Sendai Nuclear Power Station Nov-2023 May-2024 Delivery12Equipment and materials for nuclear power plants
(electrical equipment)
Low voltage electric motor of the primary
ventilation system
1 set Sendai Nuclear Power Station Jan-2024 Jul-2024 Delivery13Equipment and materials for nuclear power plants
(electrical equipment)
Primary low-voltage electric motor 1 set Sendai Nuclear Power Station Jan-2024 Dec-2024 Delivery14Equipment and materials for nuclear power plants
(secondary system equipment)
Circulating water pomp runner hub Pump model: KPV-410 1 set Genkai Nuclear Power Station Oct-2023 Jul-2024
Completion of
inspection
15 water treatment equipment (for generating facility)
Sendai Nuclear Power Station, Units 1/2,
supplemental water treatment unit:
element for reverse osmosis membrane
system, etc.
Element (SU-720P) and accessories, membrane
analysis
1 set Sendai Nuclear Power Station Jun-2023 Dec-2023 Delivery16Miscellaneous equipment and materials for nuclear
power plants
Genkai Units 3/4, water supply line 40 mhose100 Super Line A 1 set Genkai Nuclear Power Station Jun-2023 Jan-2024 Delivery

AltStyle によって変換されたページ (->オリジナル) /