Overview of Construction for Power Station at Mt. Eboshi Site, Kirishima
1. Construction site plan
2. Construction schedule plan
Fig. Geothermal wells blow (We plan to use 2 wells as production wells)
Attachment
Second well
(Jun 19-Jun 24, 2022)
First well
(Jun 2-Jun 7, 2022)
June 2023: Start construction work
April 2022: Consent from Kirishima City
End of fiscal year 2024: Start commercial operation
- We will proceed with legal procedures and specific design for the power station.
Kirishima City
Kagoshima City
Ogiri
Power Station
Mt. Eboshi
Kagoshima
Prefecture
Miyazaki
Prefecture
Planned construction site
Mt. KarakuniMt.