[フレーム] [フレーム]

Connecting the world and beyond

Executive Summary

Rollup Image
Page Content 20

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​Executive Summary of the WP1/11, WP2/11, WP3/11 and WP4/11 meetings
(Vi​rtual​, 7 February 2024)

Working Party 1/11 (Signalling requirements and protocols for emerging telecommunications networks), Working Party 2/11 (Control and management protocols for IMT-2020 and beyond) Working Party 3/11 (Conformance and interop​erability testing) and Working Party 4/11 (Combating counterfeit telecommunication/ICT devices/software and mobile device theft​) meetings were held fully virtual on 7 February 2024.

The meetings were preceded by SG11 interim Rapporteur Group meetings (RGM) of Questions 1, 2, 3, 4, 5, 6, 7, 8, 13, 14, 15 and 16/11.
Note: The Q12/11 RGM was cancelled due to lack of input documents.

The meetings of the RGM and WPs were attended by 81 delegates from 18 countries. The list of participants is made available in particular TDs posted for each particular WP as follows: SG11-TD93-R1/WP1SG11-TD56-R1​/WP2 SG11-TD40-R1/WP3 and SG11-TD03-R1/WP4​accordingly.

1     Draft Recommendations for (TAP) Determination (Resolution 1)
No draft Recommendations were determined at the WP1/11, WP2/11, WP3/11 and WP4/11 meetings.
Note: the determination of draft Recommendation ITU-T Q.CCF-CCSD, which was planned to be finalized at the interim WP4/11 meeting, was postponed.

2     Consented Recommendations (ITU-T A.8)
No draft Recommendations were consented at the WP1/11, WP2/11, WP3/11 and WP4/11 meetings.
Note: the consent of draft Recommendations ITU-T Q.SD-DCI and Q.PIS, which were planned to be finalized at the interim WP1/11 and WP3/11 meetings, were postponed.

3     Supplements, Handbooks, Technical Papers, Guidelines and Corrigenda

3.1Supplements
WP1/11 agreed Q.Suppl.77 (ex.Q.Suppl.pSFC) "Signalling requirements for parallel SFC packet processing" (SG11-TD153/WP1​).
Note: the agreement of Supplement Q.Suppl.heter_SI, which was planned to be finalized at the interim WP1/11 meeting, was postponed.

3.2  Guidelines
No Guidelines were agreed at this meeting.

3.3  Handbooks
No Handbooks were approved at this meeting.

3.4
  Technical Papers / Technical Reports
No Technical Papers/Technical Reports were approved at this meeting.


3.5
  Corrigenda
No Corrigenda were approved at this meeting.​SG11-TD102/WP1

4     
Reports of Rapporteurs meetings
WP1/11, WP2/11, WP3/11 and WP4/11 approved the following reports of the Rapporteur Group meetings:
  • The report of Q1/11 RGM (Virtual, 29 January – 6 February 2024): SG11-TD102-R1/WP1
  • The report of Q2/11 RGM (Virtual, 29 January – 6 February 2024): SG11-TD103/WP1
  • The report of Q3/11 RGM (Virtual29 January – 6 February 2024): SG11-TD104/WP1
  • The report of Q4/11 RGM (Virtual, 29 January – 6 February 2024): SG11-TD105/WP1
  • The report of Q5/11 RGM (Virtual, 29 January – 6 February 2024): SG11-TD106/WP1​
  • The report of Q6/11 RGM (Virtual, 29 January – 6 February 2024): SG11-TD65-R1/WP2
  • The report of Q7/11 RGM (Virtual, 29 January – 6 February 2024): SG11-TD66/WP2
  • The report of Q8/11 RGM (Virtual, 29 January – 6 February 2024): SG11-TD67/WP2
  • The report of Q13/11 RGM (virtual, 12-13 December 2023): SG11-TD61-R1/WP3
  • The report of Q13/11 RGM (Virtual, 29 January – 6 February 2024): SG11-TD50-R2/WP3
  • The report of Q14/11 RGM (Virtual, 29 January – 6 February 2024): SG11-TD51-R1/WP3
  • The report of Q15/11 RGM (Virtual, 29 January – 6 February 2024): SG11-TD12-R1/WP4​
  • The report of Q16/11 RGM (Virtual, 29 January – 6 February 2024): SG11-TD52-R1/WP3
5     Reports of WP1/11, WP2/11, WP3/11 and WP4/11
The reports of the WP1, WP2/11, WP3/11 and WP4/11 will be made available on R-series, as follows:​
  • Report of WP1/11 – R19
  • Report of WP2/11 – R20
  • Report of WP3/11 – R21
  • ​​Report of WP3/11 – R22​
6
     Highlights of WP1/11, WP2/11, WP3/11 and WP4/11 meetings

WP1/11

There were no draft Recommendations consented or determined by WP1/11 at this particular meeting.
Note: the consent of ITU-T draft Recommendation Q.SD-DCI and the agreement of Supplement Q.Suppl.heter_SI, which were planned to be finalized at the interim WP1/11 meeting, were postponed.

During this interim WP1/11 meeting the following outcomes were achieved:
  • Agreed one supplement Q.Suppl.77 (ex.Q.Suppl.pSFC) "Signalling requirements for parallel SFC packet processing".
  • Started three new work items, as follows (see details in SG11-TD100/WP1):
    • ITU-T Q.3741-rev: Signalling requirements for SD-WAN service;
    • Q.sup.netsoft-roadmap: Network softwarization standardization roadmap;
    • Q.Sup.BNG-fd: Signalling requirements for broadband network gateway pool based on function decoupling;
  • ​Progressed 24 ongoing work items, which cover aspects related to QKDN, CPN, emergency telecommunications, SD-WAN, BNG, SFC, signalling security, to name but a few;​
  • Revised the title of the draft Recommendation Q.TSCA "Requirements for issuing digital certificates for signalling security";
  • Considered 25 incoming liaison statements (see details in SG11-TD97/WP1);
  • ​Agreed to send out five liaison statements (see details in SG11-TD98-R1/WP1).
More details are available in the WP1/11 report (SG11-TD107-R1/WP1 to be posted as R19 ).​

WP2/11
There were no draft Recommendations consented or determined by WP2/11 at this particular meeting.
During this interim WP2/11 meeting the following outcomes were achieved:
  • Started one new work item - Q.SP-IBMO "Signaling and protocol for intent-based management and orchestration of network slicing in IMT-2020 networks and beyond" (see details in SG11-TD63/WP2);
  • Progressed 17 ongoing work items, which cover aspects related to traffic flow coordination, protocols for network convergence, protocols for IMT-2020, protocols for energy efficiency; protocols for data streaming, protocols for intent-based management, protocols for hybrid peer-to-peer communications to name but a few;
  • Considered 14 incoming liaison statements (see details in SG11-TD60/WP2);
  • Agreed to send out three liaison statements (see details in SG11-TD61-R1/WP2).
More details are available in the WP2/11 report (SG11-TD68-R1/WP2 to be posted as R20).​

WP3/11
There were no draft Recommendations consented or determined by WP3/11 at this particular meeting.
Note: the consent of draft Recommendation ITU-T Q.PIS, which was planned to be finalized at the interim WP3/11 meeting, was postponed.
During this interim WP3/11 meeting the following outcomes were achieved:
  • Started one new work item - Q.CED "Monitoring parameters for cloud-edge-device collaboration system" (see details in SG11-TD47/WP3);
  • Progressed 11 ongoing work items, which cover aspects related to monitoring parameters for intelligent speech service, requirements for monitoring packet loss, monitoring ML/AI, SDN/NFV monitoring, DaaS, VoNR/ViNR interconnection, testing of DPI devices, to name but a few;
  • Considered five incoming liaison statements (see details in SG11-TD44/WP3);
  • Agreed to send out three liaison statements (see details in SG11-TD45/WP3).
More details are available in the WP3/11 report (SG11-TD53-R1/WP3 to be posted as R21).

WP4/11
There were no draft Recommendations consented or determined by WP4/11 at this particular meeting.
Note: the determination of draft Recommendation ITU-T Q.CCF-CCSD, which was planned to be finalized at the interim WP4/11 meeting, was postponed.
During this interim WP4/11 meeting the following outcomes were achieved:
  • Progressed one ongoing work items, which cover aspects related to consumer centric framework for combating counterfeit and stolen ICT mobile devices;
  • Considered two incoming liaison statements (see details in SG11-TD7/WP4);
  • Agreed to send out one liaison statement (see details in SG11-TD8/WP4).
More details are available in the WP4/11 report (SG11-TD14-R1/WP4​ to be posted as R22).

7     Outgoing Liaison Statements​
In total, WP1/11, WP2/11, WP3/11, and WP4/11 agreed 12 outgoing liaison statements (SG11-TD98-R1/WP1, SG11-TD61-R1/WP2, SG11-TD45/WP3 and SG11-TD8/WP4​).​

8     Approved new work items​​​
In total, WP1/11, WP2/11, WP3/11, and WP4/11 agreed to start five new work items (SG11-TD100/WP1, SG11-TD63/WP2 and SG11-TD47/WP3).​

​9     Future meetings and next Study Group 11 meeting
9.1  Interim Rapporteur Group e-meetings (RGM)
The following interim Rapporteur Group e-meetings are planned to be held before the next meeting of SG11 (Geneva, 1-10 May 2024).

QWP
Date Place / Host Terms of reference Contact
​Email reflector
4/11​​
WP1​ 20-22 March 2024
e-meeting
  • ​Progress the on-going draft Recommendations Q.SD-DCI and Q.CSO to be ready for consent;
  • Progress the on-going draft Supplements Q.Suppl.heter_SI to be ready for agreement;
  • Progress other on-going work items under study in Q4/11.
Ying Cheng
China Unicom, China 
​chengying10[at]chinaunicom.cn
t22sg11q4[at]lists.itu.int​
​​5/11 WP1
28-29 March 2024
e-meeting
  • ​Progress the ongoing work items for the consent in the next SG11 meeting.
  • Discuss the ToR for the NSP, if received.
JunFeng Ma majunfeng[at]caict.ac.cn
t22sg11q5[at]lists.itu.int​
​6/11

WP2
11-13 March 2024
e-meeting
  • ​Prepare Q.PMMC and Q.PEC for consent in May
  • Progress other ongoing work items
  • Consider new proposals
Dan Xu xudan6[at]chinatelecom.cn
t22sg11q6[at]lists.itu.int​
7/11
WP2
27-28 March 2024
e-meeting
  • ​Progress ongoing work items;
  • Review and handle relevant LSs;
  • Consider any other new work items;
  • But not limited to.
Kwihoon Kim kimkh[at]knue.ac.kr



t22sg11q7[at]lists.itu.int​​​
​8/11
​WP2
​25-29 March 2024
​e-meeting
​Progress ongoing work items​
​Changkyu Lee
changkyu.lee[at]etri.re.kr

​t22sg11q8[at]lists.itu.int​
13/11​​
​WP3
20-21 March 2024 e-meeting​
  • Progress work items planed for consent at the next SG11 meeting;​
  • Progress ongoing work items.
Minrui Shi shimr[at]chinatelecom.cn
t22sg11q13[at]lists.itu.int​​​

9.2     Next SG11 meeting
The next SG11 meeting is scheduled to take place in Geneva, from 1 to 10 May 2024 (see https://itu.int/go/tsg11​).

​10     Liaison officers and Rapporteurs
The WP1/11 leadership, Rapporteurs, Associate Rapporteurs and Acting Rapporteurs of related Questions is contained in SG11-TD94/WP1.
The WP2/11 leadership, Rapporteurs, Associate Rapporteurs and Acting Rapporteurs of related Questions is contained in SG11-TD57/WP2.
The WP3/11 leadership, Rapporteurs, Associate Rapporteurs and Acting Rapporteurs of related Questions is contained in SG11-TD41/WP3.
The WP4/11 leadership, Rapporteurs, Associate Rapporteurs and Acting Rapporteurs of related Questions is contained in SG11-TD4/WP4.

No changes were made to the list of liaison officers.

The list of Rapporteurs and Associate Rapporteurs can be found at: https://www.itu.int/net4/ITU-T/lists/loqr.aspx?Group=11&Period=17 .

Page Content 9
Page Content 10
Page Content 18
Page Content 19
Page Content 6
Page Content 7
Page Content 11
Page Content 12
Page Content 2
Page Content 3
Page Content 4
Page Content 5
Page Content 13
Page Content 14
Page Content 15
Page Content 16

AltStyle によって変換されたページ (->オリジナル) /