Executive summary of the SG11 meeting (Geneva, 8-17 November 2017)

Study Group 11 meeting was held in Geneva, from 8-17 November 2017 and was attended by 96 delegates from 32 countries. Along with face-to-face meetings, most sessions from various Questions or joint Questions meetings were supported by remote participation capabilities.

Parallel events:

  • ITU-T SG13, 6-17 November 2017;
  • Joint Coordination Activity on Software-Defined Networking (JCA-SDN) meeting, 9 November 2017;
  • Joint Coordination Activity on IMT2020 (JCA-IMT2020) meeting, 10 November 2017;
  • Joint meeting with ETSI TC INT and Qs 2/11, Q9/11 and Q11/11, 13-14 November 2017;
  • ETSI TC INT meeting, Geneva, 13-15 November 2017 (see ETSI website);
  • ITU-T Conformity Assessment Steering Committee (webpage) meeting, 9 November 2017;
  • Workshop on "Control plane of IMT-2020 and emerging networks. Current issues and the way forward" (15 November 2017).

1     Approved and Consented Recommendations (ITU-T A.8)
The following table shows the ‘Consented’ draft Recommendations.​

# Q. WP Draft new/revised Rec. No. Title Final TD A.5 justification
1.                    2/11 1/11 Q.1912.5 (revised) Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control protocol or ISDN User Part TD376-R1/GEN TD287/GEN
2.                    2/11 1/11 Q.3640 (ex. Q.30xx_VoLTE_Interconnection_FW) Framework of interconnection of VoLTE/ViLTE-based networks TD377/GEN TD288/GEN
3.                    4/11 1/11 Q.3740 (ex. Q.SCO) Signalling Requirements for SDN and NFV based Central Office services TD395/GEN ---
4.                    4/11 1/11 Q.3716 (ex. Q.PVMapping) Signalling Requirements for Mapping between Physical and Virtual Networks TD394/GEN ---
5.                    5/11 1/11 Q.3715 (ex. Q.BNG-DBoD) Signalling requirements for dynamic bandwidth adjustment on demand on broadband network gateway implemented by software defined networking technologies TD368-R1/GEN ---
6.                    7/11 2/11 Q.3714 (ex. Q.SAN-MIM) Signalling requirements of SDN-based access networks with media independent management capabilities TD356/GEN ---
7.                    8/11 2/11 X.609.4 (ex. X.mp2p-mspp) Managed P2P communications: Multimedia streaming peer protocol TD392/GEN TD403/GEN
8.                    8/11 2/11 X.609.5 (ex. X.mp2p-msomp) Managed P2P communications: Multimedia streaming overlay management protocol TD393/GEN TD390/GEN
9.                    11/11 3/11 Q.4016 (revised) Testing specification of call establishment procedures based on SIP/SDP and ITU-T H.248 for a real-time fax over IP service TD386-R1/GEN ---
10.                11/11 3/11 Q.3940 (revised) NGN/IMS interconnection tests between network operators at the IMS 'Ic' interface and NGN NNI / SIP-I TD385-R1/GEN ---
11.                11/11 3/11 Q.3953 (ex. Q.VoLTE_INT_TEST) VoLTE/ViLTE interconnection testing for interworking and roaming scenarios TD408/GEN TD409/GEN
12.                12/11 3/11 Q.3952 (ex. Q.39_IoT_MN_test) The architecture and facilities of Model network for IoT testing TD324/GEN ---
13.                13/11 3/11 Q.3914 (ex. Q.CCP) Set of parameters of cloud computing for monitoring TD367-R1/GEN ---
14.                14/11 3/11 Q.4041.1 (ex. Q.infra-iop) Cloud computing infrastructure capabilities interoperability testing – part 1: Interoperability testing between CSC and CSP TD361-R1/GEN ---

2     Supplements, Handbooks, Technical Papers, Guidelines and Corrigenda
2.1  Supplements
No Supplements were approved at this meeting.

2.2  Guidelines
No Guidelines were approved at this meeting.

2.3  Handbooks
No Handbooks were approved at this meeting.

2.4  Technical Papers
No Technical Papers were approved at this meeting.

2.5  Corrigenda
No Corrigenda were approved at this meeting.

3     SG11 Structure and Management
There were no changes to the structure of SG11.

Further to a communication from ENACOM, Argentina, Mr Mario Frigerio had to step down as Vice-chairman of SG11 and Mr Jose Hirschson Alvarez Prado also from ENACOM, Argentina was proposed to replace Mr Mario Frigerio.
The SG11 opening plenary approved Mr Jose Hirschson Alvarez Prado as SG11 Vice-chairman.
The meeting thanked Mr Frigerio and welcomed Mr Hirschson Alvarez Prado.

4     Regional groups of SG11
The reports of the Regional groups of SG11 (SG11RG-AFR and SG11RG-EECAT) were presented and approved at the opening plenary. Following the discussion of the contributions proposing some changes to the Terms of References, the revised ToR of both groups were approved at the opening plenary of SG11.
The revised ToR for SG11RG-AFR and SG11RG-EECAT are available in SG11-TD312/GEN and SG11-TD313/GEN accordingly.

5     Questions
There were no changes to the Questions texts at this meeting. 

6     Liaison officers and Rapporteurs
SG11 approved the appointment of the new Rapporteurs and Associate Rapporteurs as follows:

  • Mr Juyoung PARK (ETRI) was appointed as Rapporteur for Q8/11. Mr Shin-Gak KANG will concentrate on his role as WP2/11 Chairman;
  • Mr Kaoru KENYOSHI (NEC Corporation) was appointed as Rapporteur for Q10/11 instead of Acting Rapporteur.
​Due to absence of some rapporteurs it was decided to appoint acting rapporteurs for this particular meeting. The final list of Rapporteurs, Associate Rapporteurs and Acting Rapporteurs can be found in SG11-TD186-R2/GEN.

SG11 approved the appointment of new liaison officers and representatives as follows:
  • Mr Awad MULAH (NTC, Sudan) was appointed as liaison officer to ITU-T SG5;
  • Mr Rustam PIRMAGOMEDOV (Russia) was appointed as liaison officer to JCA-IdM;
  • Mr Shin-Gak KANG (ETRI), Mr Kaoru KENYOSHI (NEC Corporation) and Mr Haining WANG (China Telecom) were appointed as liaison officers to JCA-IMT2020.
​The final list of Liaison Officers and representatives can be found in SG11-TD185-R1/GEN.

7     Action plan of ITU-T SG11 for the new Study Period (2017-2020)
During the first meeting of SG11 (February 2017), the SG11 Chairman presented the SG11 Action plan (SG11-TD173/GEN) which summarizes the strategy of the WPs for the current Study Period, according to the presentations given by the WPs Chairmen.
At the SG11 meeting (8-17 November 2017), the SG11 Chairman encouraged the WPs Chairmen to provide updates to the action plan at the next SG11 meeting (July 2018).

8     SDN and 5G/IMT-2020 related issues
SG11 finalized set of new ITU-T Recommendations dealing with SDN and other 5G related technologies. Among them were:
  • ITU-T Q.3740: Signalling Requirements for SDN and NFV based Central Office services;
  • ITU-T Q.3716: Signalling Requirements for Mapping between Physical and Virtual Networks;
  • ITU-T Q.3715: Signalling requirements for dynamic bandwidth adjustment on demand on broadband network gateway implemented by software defined networking technologies;
  • ITU-T Q.3714: Signalling requirements of SDN-based access networks with media independent management capabilities;
​All of the above new Recommendations were consented at the closing plenary of SG11 meeting (17 November 2017).
SG11 also advanced the ongoing work item Q.NS-LCMP "Protocol for network slice lifecycle management" and agreed to start several new work items on IMT-2020, as follows:
  • Q.CE-APIMP: Protocol for managing capability exposure APIs in IMT-2020 network;
  • Q.D2D-EECP: Energy efficient D2D communication protocol for IMT 2020 network;
  • Q.QMP-TCA: QoS management protocol for time constraint applications over SDN;
  • Q.SDN-CT: Framework of SDN controller testing.
​More information on these activities is available in the WP1/11 and WP2/11 reports accordingly (SG11-TD346-R1/GEN, SG11-TD347-R1/GEN).

9     Signalling issues
SG11 consented the revised Recommendation ITU-T Q.1912.5 "Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control protocol or ISDN User Part" and advanced ITU-T Q.3405 "IPv6 protocol procedures for broadband services".

SG11 also agreed to start a new work item Q.ETN-DS "Signalling architecture of the fast deployment emergency telecommunication network to be used in a natural disaster" which aim is to describe the functional elements, services and signaling architecture of emergency telecommunication network which can be rapidly deployed in a country affected by a natural disaster.

10     SS7 security
SG11 meeting discussed number of contributions addressed to SS7 issues. Among them were proposals to revise ITU-T Q.731.3 and create new signaling procedures to be applied on SS7 stack.
With regards to Q.731.3, following the discussion, delegates reached consensus on the following procedure for generic number: In the local exchange, Generic number parameter indicating "additional calling party number" with the screening indicator "user provided, not verified" shall not be sent without service agreement.
Following the discussion of the proposed new work items, meeting agreed that verification of the identification of network entities (also the calling party number) is a very important method to achieve greater safety and security for network. At current stage, study on the requirements and architecture for interconnection between trustable network entities is needed. In this regards, it was agreed to start a new work item Q.SR-Trust "Signalling requirements and architecture for interconnection between trustable network entities".
More details are available in WP1/11 report and Q2/11 report accordingly (SG11-TD346-R1/GEN, SG11-TD332/GEN).

11     VoLTE/ViLTE interconnection
Following two years of study, SG11 consented two new ITU-T Recommendations dealing with VoLTE/ViLTE interconnection, as follows:

  • ITU-T Q.3640: Framework of interconnection of VoLTE/ViLTE-based networks;
  • ITU-T Q.3953: VoLTE/ViLTE interconnection testing for interworking and roaming scenarios.
​Following this result, SG11 agreed to start a new work item Q.DEN_IMS "Signalling architecture of distributed ENUM networking for IMS" which will define the signalling architecture of distributed ENUM networking in support of IMS interconnection. Even though this new work item will focus on signalling aspect, it was decided to start this new work item with an approval process of TAP.
SG11 also made progress on ongoing work item Q.suppl.Multi_Device_ETS "Signalling requirements for VoLTE-based network and GSM/UMTS network supporting Multi-device emergency telecommunications service" and agreed to start several new work items on VoLTE/ViLTE matters, as follows:
  • Q.VoLTE-SAO-req: Requirements for signalling network analyses and optimization in VoLTE;
  • Q.Suppl.VoLTE_ETS_Interconnection: Signalling requirements for interconnection between VoLTE-based network and other networks supporting emergency telecommunications service (ETS);
​The details are available in WP1/11 and WP3/11 reports accordingly (SG11-TD346-R1/GEN, SG11-TD348/GEN).

12     Fifth meeting of the ITU-T Conformity Assessment Steering Committee (CASC)
SG11 approved the revised Terms of Reference (ToR) of CASC, which were aligned with WTSA-16 Resolution 2 and Resolution 76 referring to joint ITU/IEC certification scheme.
CASC discussed the collaboration approach with IECEE TF in order to establishing joint certification scheme. It was agreed that the Chairman will contact the representatives of IEC asking them to provide their inputs to the ongoing CASC’s guidelines for consideration at the next CASC meeting.
CASC also updated list of focal points of ITU-T SGs to CASC according to received inputs from ITU-T SGs.
The CASC agreed that it will meet again during the next meeting of SG11 (20 July 2018) (TBC). Also, it was agreed that CASC will use its mailing list t17sg11casc@lists.itu.int as a useful tool to facilitate discussion between its members to progress the work of CASC. It also can be used for exchanging some inputs and ideas related to the ongoing work items, which might become contributions to the next CASC meeting.
The meeting report can be found in SG11-TD329/GEN. More details are available on the ITU-T CASC web page.

13     Implementation of ITU C&I Programme
According to inputs received from ITU-T SGs, ITU-T SG11 updated the reference table of ITU-T Recommendations suitable for C&I testing. The information was updated on the ITU C&I Portal accordingly (see www.itu.int/go/reference-table).

14     Internet related performance measurements
SG11 discussed the draft ITU-T Q.3961 "Testing methodologies of Internet related performance measurements including e2e bit rate within the fixed and mobile operator's networks". In spite of achieved progress and bearing in mind the received LS from SG12, SG11 decided to put draft ITU-T Q.3961 on hold for the time being. The SG11 will return to the draft ITU-T Q.3961 as soon as the relevant standard appears in other Standardization Bodies.
The meeting report can be found in SG11-TD339/GEN.

15         Collaboration with ETSI TC INT
SG11 continues collaborating with ETSI TC INT through current joint activities and some new areas. Among current joint activities are:
  • Interconnection of VoLTE/ViLTE networks;
  • Testing specifications;
  • Internet related performance measurements.
​The next joint meeting of Q9/11, Q11/11 and ETSI TC INT is scheduled to take place in Prague (hosted by University of Prague) from 20-22 March 2018. All details are available on the SG11 web page.

16     Combating counterfeit ICT and mobile device theft
SG11 made progress on the ongoing work items:
  • Draft Recommendation Q.FW_CCF "Framework for solution to combat counterfeit ICT Devices";
  • Draft Recommendation Q.FW_CSM "Framework for Combating the use of Stolen Mobile ICT Devices";
  • Draft Technical Report TR-BP_CF "Technical Report - Guidelines on Best Practice and Solutions for Combating Counterfeit ICT Devices".
More details of the discussion are available in the WP3/11 report (SG11-TD348/GEN).

17     International Telecommunication Regulation (ITR)
SG11 discussed the incoming Liaison Statement from TSAG requesting background information on the implementation of the 2012 International Telecommunication Regulations (TSAG-LS 8). Following the response to the TSAG request, which was sent by SG11 Chairman in September 2017, SG11 decided to reply to the incoming Liaison Statement providing additional information (SG11-LS20). The response includes information below.
Concerning the relevant ITU-T Recommendations and the role of SG11 has in implementing the 2012 ITRs, the SG11 meeting agreed the following:
  • SG11 is a technical study group and at this time, SG11 has not perceived any impact the 2012 ITRs have on ITU-T Recommendations, developed and approved by SG11;
  • SG11 recognizes that there are a series of ITU-T Recommendations developed by SG11 that are related to the provision of International Calling Line Identification (mentioned in article 3.6 of 2012 ITRs), including:
  • ITU-T Q.731 series: The Recommendation defines signalling requirements to supplementary services such as CLIP, CLIR, COLP and COLR;
  • Q.3617-Q.3639: Service and session control protocols – supplementary services based on SIP-IMS.
SG11 also decided to reflect this information in the report of SG11 for the TSB Director’s consideration.

18     IoT testing
SG11 consented new Recommendation ITU-T Q.3952 "The architecture and facilities of Model network for IoT testing". Several draft new Recommendations were advanced during this SG11 meeting.
All details are available in the meeting report SG11-TD342/GEN

19     Workshop on "Control plane of IMT-2020 and emerging networks. Current issues and the way forward" (15 November 2017)
SG11 organized a Workshop on "Control plane of IMT-2020 and emerging networks. Current issues and the way forward" which took place in Geneva on 15 November 2017. The goal of the workshop was to identify current issues on signalling protocols for emerging networks, including interconnection, worldwide practices and perspectives on the implementation of 5G/IMT-2020/emerging networks and potential new areas for standardization on control plane of the 5G/IMT-2020/emerging networks.
Among the results of the workshop were some suggestions to SG11 as a lead group on signaling and protocols:
  • Establish collaboration with open source communities to speed up the de facto standards;
  • Continue to coordinate with the related SDOs (3GPP, ETSI, MEF, etc.) to develop the specs and promote the testing in 5G, network slicing, hybrid network, QoE, QoS;
  • Encourage members who have gained fruitful experiences through emerging network practice to submit contributions to promote the SDN/NFV-related testing standardization work in SG11;
  • Encourage members to initiate possible work items, which are related to new emerging technologies, such as IoT IMS signaling, Fog/Edge Computing.
The event was attended by 82 participants from 28 Countries. All presentations including outcomes of the Workshop are available on the event’s web page at: https://www.itu.int/en/ITU-T/Workshops-and-Seminars/201711/Pages/default.aspx.

20    Outgoing Liaison Statements
The following table shows the list of the nineteen agreed outgoing liaison statements. See SG11-TD183-R2/GEN.
# Q (s) For: To: Title Reference
1 All/11 A SCV-CCV LS/o/r on definition for broadband access (reply to SCV LS13) TD315-R1/GEN
2 All/11 A FG-DPM LS/o/r on the first meeting of ITU-T Focus Group on Data Processing and Management to support IoT and Smart Cities & Communities (FG-DPM) (reply to FG-DPM-LS003) TD417/GEN
3 All/11 I TSAG LS/o/r on Open Source (reply to TSAG-LS004) TD418-R1/GEN
4 All/11 I ITU-T SG5 LS/o/r on LSs related to EMC/EMF (reply to SG5-LS024, SG5-LS-22) TD419/GEN
5 All/11 I TSAG LS/o/r on stale work items and SG Reports on lead study group activities (reply to TSAG-LS006) TD420/GEN
6 1/11 I ITU-T SG2, GSMA LS/o on initiating a new work item on signalling architecture of distributed ENUM networking for IMS TD383- R1/GEN
7 2/11 I ITU-T SG2 LS/o on new work item Q.SR-Trust "Signalling requirements and architecture for interconnection between trustable network entities" TD380/GEN
8 4/11 I ITU-T SG13,
JCA-IMT2020 LS/o on recent SDN-related developments in SG11: Four consented draft Recommendations TD400-R1/GEN
9 All/11 A JCA-IMT2020 LS/o/r on invitation to update the information in the IMT2020 roadmap (reply to JCA-IMT2020) TD300/GEN
10 6, 7, 8/11 A JTC 1/SC 6/WG 7 LS/o/r on collaboration with ISO/IEC JTC1/SC 6/WG 7 (reply to SC6_WG7_N111) TD389/GEN
11 9/11 I ITU-T SG12, TSAG LS/o on current status of the draft Recommendation ITU-T Q.3961 TD388/GEN
12 11/11 I All ITU-T SGs LS/o on Implementation of ITU C&I Programme TD373/GEN
13 11/11 I ITU-D Q4/2 LS/o/r on ongoing collaboration (reply to ITU-D Q4/2-SG2RGQ/250) TD411/GEN
14 12/11 I ITU-T SG17 LS/o/r on JCA-IdM (reply to SG17 - LS 15) TD325/GEN
15 12/11 I ITU-T SG20 LS/o on ITU-T Q.3952 "The architecture and facilities of Model network for IoT testing" TD326/GEN
16 14/11 I ITU T SG13 LS/o/r on progress of ITU-T Y.3516 (ex Y.CCIC-arch) "Cloud computing - Functional architecture of inter-cloud computing" (reply to SG13-LS028) TD363-R2/GEN
17 14/11 I ITU-T SG13 LS/o/r on invitation to review Cloud Computing Standardization Roadmap and provide missing or updated information (reply to SG13-LS019) TD364-R2/GEN
18 15/11 I ITU-T SG20 LS/o/r on work on the combat of counterfeit ICT devices and mobile device theft (reply to SG20-LS009) TD414-R1/GEN
19 All/11 A TSAG, All ITU-T SGs LS/o/r on request for background information on the implementation of the 2012 International Telecommunication Regulations – additional information (reply to TSAG-LS008) TD422/GEN

21     Approved new work items
The following table shows the list of the thirteen new work items. See SG11-TD410-R1/GEN.
N. Q Work item (Draft Recs) Status Title Editor Timing Ref.
1 Q1/11 Q.DEN_IMS New Signalling architecture of distributed ENUM networking for IMS Xiaojie Zhu(Judy) zhuxj.gd@chinatelecom.cn
Nangxiang Shi shinanxiang@chinamobile.com
Jinlan Ma
majl.gd@chinatelecom.cn

 

2019-07 SG11-TD382/GEN
2 Q2/11 Q.SR-Trust New Signalling requirements and architecture for interconnection between trustable network entities Minrui Shi
shimr@sttri.com.cn
Sergei Puzankov, Rostelecom sergey.xoms@gmail.com 2019-11 SG11-TD374/GEN
3 Q2/11 Q.VoLTE-SAO-req New Requirements for signalling network analyses and optimization in VoLTE Nanxiang Shi shinanxiang@chinamobile.com Jinlan Ma majl@gsta.com Cheng Li licheng@caict.ac.cn

 

2019-02 SG11-TD375/GEN
4 Q3/11 Q.ETN-DS New Signalling architecture of the fast deployment emergency telecommunication network to be used in a natural disaster Aleksey Borodin aleksey.borodin@rt.ru
Ruslan Kirichek
kirichek@sut.ru
Rustam Pirmagomedov prya.spb@gmail.com

 

2019-02 SG11-TD355/GEN
5 Q3/11 Q.suppl.Multi_Device_ETS New Signalling requirements for VoLTE-based network and GSMUMTS network supporting Multi-device emergency telecommunications service Muyin Liu liumy91@chinaunicom.cn 
Jinlan Ma majl.gd@chinatelecom.cn Jianyin Zhang zhangjianyin@chinamobile.com
Miao Xue xuemiao9@chinaunicom.cn       2019-10 SG11-TD354/GEN
6 Q6/11 Q.CE-APIMP New Protocol for managing capability exposure APIs in IMT-2020 network Hui Cai, caihui@chinamobile.com
Lu Lu, lulu@chinamobile.com Haining Wang, wanghn.bri@chinatelecom.cn Shin-Gak Kang sgkang@etri.re.kr 2019-12 SG11-TD351/GEN
7 Q6/11 Q.D2D-EECP New Energy efficient D2D communication protocol for IMT 2020 network Aleksey Borodin aleksey.borodin@rt.ru
Ruslan Kirichek kirichek@sut.ru
Rustam Pirmagomedov prya.spb@gmail.com

 

2019-12 SG11-TD352/GEN
8 Q7/11 Q.QMP-TCA New QoS management protocol for time constraint applications over SDN Aleksey Borodin aleksey.borodin@rt.ru
Ruslan Kirichek kirichek@sut.ru Rustam Pirmagomedov prya.spb@gmail.com 2019-02 SG11-TD360/GEN
9 Q9/11 Q.SP-RT-NP New Signalling procedures of the probes to be used for remote testing of network parameters Aleksey Borodin aleksey.borodin@rt.ru
Ruslan Kirichek kirichek@sut.ru Vyacheslav Kulik vaklicr@gmail.com 2018 SG11-TD384/GEN
10 Q10/11 Q.SDN-CT New Framework of SDN controller testing Aleksey Borodin aleksey.borodin@rt.ru
Ruslan Kirichek kirichek@sut.ru
Rustam Pirmagomedov prya.spb@gmail.com
Ammar Muthanna ammarexpress@gmail.com 20191Q SG11-TD401/GEN
11 Q11/11 Q.TI-TEST New Framework of model network for Tactile Internet testing Aleksey Borodin aleksey.borodin@rt.ru
Ruslan Kirichek kirichek@sut.ru
Rustam Pirmagomedov prya.spb@gmail.com 2019 SG11-TD387/GEN
12 Q13/11 Q.SQM New Signalling requirements and architecture for the Internet service quality monitoring system Yongsheng Liu
liuys170@chinaunicom.cn 12-2019 SG11-TD366/GEN
13 Q13/11 Q.BNGP New Set of parameters of vBNG for monitoring Bo Lei leibo.bri@chinatelecom.cn Yongsheng Liu
liuys170@chinaunicom.cn 12-2019 SG11-TD365/GEN


22     Work plan for interim Working Party and Rapporteur meetings
The following represents the interim meetings plan as agreed at SG11 Plenary (Geneva, 17 November 2017). Also in SG11-TD184-R1/GEN.

22.1  Working parties
No Working Party meeting will be held before the next SG11 meeting.
22.2  Rapporteur groups
The following interim Rapporteurs’ groups meetings are agreed by SG11 Plenary (Geneva, 17 November 2017).

Question Dates Place / Host Terms of reference Contact
Email
reflector
Q4/11 January 22-24 2018
9:00-11:00 (Geneva time) e-meeting Progress the on-going work items of Q4/11
But not limited to. Ying CHENG, China Unicom
chengying10@chinaunicom.cn t17sg11q4@lists.itu.int
Q1/11 9-18 April 2018 Geneva To progress ongoing work items
To consider any new work items
But not limited to. Huan DENG
denghuan.bri@chinatelecom.cn t17sg11q1@lists.itu.int
Q2/11 9-18 April 2018 Geneva Discuss ongoing work items
Consider any new work items
But not limited to Cheng LI, licheng@caict.ac.cn t17sg11q2@lists.itu.int
Q3/11 9-18 April 2018 Geneva Progress ongoing work items
Consider any other new work items Xiaojie ZHU, zhuxj@gsta.com t17sg11q3@lists.itu.int
Q4/11 9-18 April 2018 Geneva Progress the on-going work items of Q4/11
Discuss new work item introduced by contributions
Review the work program and modify the Action Plan
But not limited to. Ying CHENG, China Unicom
chengying10@chinaunicom.cn t17sg11q4@lists.itu.int
Q5/11 9-18 April ,2018 Geneva Progress ongoing work items
To consider any new work items
But not limited to. Aipeng GUO
Guoap7@chinaunicom.cn t17sg11q5@lists.itu.int
Q6/11 9-18 April 2018 Geneva Progress all Q6/11 on-going work items and new work proposals Haining WANG wanghn.bri@chinatelecom.cn t17sg11q6@lists.itu.int
Q7/11 19~23 Feb. 2018 e-meeting Progress all Q7/11 on-going work items and new work proposals Jongmin LEE  jminlee@sk.com t17sg11q7@lists.itu.int
Q7/11 9-18 April 2018 Geneva Progress all Q7/11 on-going work items and new work proposals Jongmin LEE jminlee@sk.com t17sg11q7@lists.itu.int
Q7/11 28 May ~ 1 June 2018 e-meeting Progress all Q7/11 on-going work items and new work proposals Jongmin LEE jminlee@sk.com t17sg11q7@lists.itu.int
Q8/11 9-18 April 2018 Geneva Progress all Q8/11 on-going work items and new work proposals Juyoung Park jypark@etri.re.kr t17sg11q8@lists.itu.int
Joint Q9/11 -ETSI TC INT 20-22 March 2018 Prague/University of Prague Discuss Q.SP-RT-NP together with Q13/11
Discuss iLSs and prepare oLSs
Consider proposal to start new work items. Martin BRAND, martin.brand@a1telekom.at

TSB/ITU Secretariat:
tsbsg11@itu.int
ETSI Secretariat:
Helene Schmidt
helene.schmidt@etsi.org
ETSI announcement

t17sg11q9@lists.itu.int
Joint Q11/11 -ETSI TC INT 20-22 March 2018 Prague/ University of Prague Discuss progress on the ongoing work items;
Discuss iLSs and prepare oLSs;
Consider proposal to start new work items. Martin BRAND, martin.brand@a1telekom.at
TSB/ITU Secretariat:
tsbsg11@itu.int

ETSI Secretariat:
Helene Schmidt
helene.schmidt@etsi.org
ETSI announcement

t17sg11q11@lists.itu.int
Q12/11 11, 12 April 2018 Geneva Progress on ongoing work items;
Open new work items. Steve LIANG
liangs@ucalgary.ca

TSB/ITU Secretariat:
tsbsg11@itu.int        

t17sg11q12@lists.itu.int
Q14/11 9-18 April 2018 Geneva Progress Q.wa-iop
Discuss new work item introduced by contributions
Review the work program
But are not limited to. Nan CHEN
chenn4.gd@chinatelecom.cn

TSB/ITU Secretariat:
tsbsg11@itu.int

t17sg11q14@lists.itu.int
Q15/11 9-18 April 2018 e-meeting Discuss current Q15/11 work items, in particular Q.FW_CSM. João Alexandre Moncaio ZANON
zanon@anatel.gov.br

TSB/ITU Secretariat:
tsbsg11@itu.int

t17sg11q15@lists.itu.int

23     Regional Groups’ meetings
SG11 was informed about plans of Regional Groups’ for 2018. However, dates and venue are not confirmed yet. The detailed information will be circulated through the relevant mailing lists and reflected on the Regional Groups web pages.

24     Promotion of SG11 work
At the closing plenary of SG11, it was proposed to organize ITU Workshop "Combating counterfeiting and stolen ICT devices" during next SG11 meeting in July 2018. The announcement will follow.

25     Next Study Group 11 meeting
The next SG11 meeting is scheduled to take place from 18-27 July 2018. The dates and venue will be confirmed.
Page Content 9
Page Content 10
Page Content 18
Page Content 19
Page Content 6
Page Content 7
Page Content 11
Page Content 12
Page Content 2
Page Content 3
Page Content 4
Page Content 5
Page Content 13
Page Content 14
Page Content 15
Page Content 16

AltStyle によって変換されたページ (->オリジナル) /