Executive summary of the WP2 and 3/11 meetings (Geneva, 21 November 2014)

WP2 and 3/11 meetings were held in Geneva, 21 November 2014 and were attended by 45 participants from 13 countries. The meeting was webcasted. The WP meetings were preceded by the Rapporteur's group meetings of Q1, 2, 3, 4, 5, 8, 9, 14 and 15/11, which were held in Geneva on 10-21 November 2014 and were attended by 55 participants from 15 countries. Along with face-to-face meetings, all sessions were supported by remote participation capabilities. Due to luck of Contributions, Q6/11 Rapporteur meeting was canceled while Q11/11 Rapporteur meeting was postpones to 17 December 2014; it will be held electronically.

1.    Consented Recommendations (ITU-T A.8)
The following table shows the 'Consented' draft Recommendations.

# Question WP Draft new/revised Rec. No. Title Final TD GEN A.5 justification
1 5/11 WP2/11
Q.3315
(Q.SBNG)
Signalling requirements for flexible network service combination on Broadband Network Gateway TD 586 (GEN/11) N/A

2.    Supplements, Technical Papers and Reports

2.1  Supplements
No supplements were approved at this meeting

2.2  Technical Papers
No Technical papers were approved at this meeting.

2.3  Technical Reports
The following table shows the approved Technical Report

# Question WP Work item Title Final TD GEN A.5 justification
1 Q8/11 WP3/11 TR-Counterfeit Technical Report on "Counterfeit ICT Equipment" TD 574 Rev.2 (GEN/11) N/A

3.    Outgoing Liaison Statements
The following table shows the list of the four (4) agreed outgoing liaison statements.

# WP/11 Q(s) For To Title Reference
1 WP2/11 Q5/11 Information ITU-T SG13, JCA-SDN LS on consent of draft new ITU-T Q.3315 (Q.SBNG) "Signalling requirements for flexible network service combination on Broadband Network Gateway" TD 597 Rev.1 (GEN/11) (WP2/11 Report)
2 WP3/11 Q8/11 Information CITEL LS/o on the progress on the Technical Report on Counterfeit ICT Equipment [to CITEL] TD 595 Rev.1 (GEN/11)
3 WP3/11 Q8/11 Information ITU-D SG2, ITU-T SG2, SG3, SG5, SG12, SG13, SG16, SG17 LS on the progress on the Technical Report on Counterfeit ICT Equipment TD 600 Rev.1 (GEN/11) (WP3/11 Report)
4 WP3/11 Q9/11 Comment ISO/IEC JTC 1/SC 6 LS/o on collaboration with ISO/IEC JTC 1/SC 6 on managed peer-to-peer communications (reply to ISO/IEC JTC1/WG7 - 6N16071) TD 593 (GEN/11)

4.    Work plan for interim Working Party and Rapporteur meetings

4.1
  Working parties
No interim WP meetings are planned before next SG11 meeting.

4.2
  Interim Rapporteur groups
The following interim Rapporteur groups meetings are planned before next SG11 meeting.

Question Date Place/Host Terms of reference Contact
11/11 17 December 2014 e-meeting - Progress on Q.TL-rec-pro

Isaac Boateng (NCA, Ghana)
isaac.boateng@nca.org.gh

Joint 4/11 & 6/13 3 February 2015 e-meeting To progress work in Q6/13's Y.VNC which will allow Q4/11's Q.CSO to progress

Jia He (Huawei)
hejia@huawei.com
Taesang Choi (ETRI)
choits@etri.re.kr

9/11 25-27 February 2015 e-meeting Progress draft Recommendation ITU-T X.mp2p-arch, aiming to propose Consent in SG11, April 2015 meeting Shin-Gak Kang (ETRI)
sgkang@etri.re.kr

Updates will be made available at:           
http://www.itu.int/net/ITU-T/lists/rgm.aspx?Group=11&type=interim

5.    Next Study Group 11 meeting
The next SG11 meeting is scheduled in Geneva, Switzerland on 22-29 April 2015.

Page Content 9
Page Content 10
Page Content 18
Page Content 19
Page Content 6
Page Content 7
Page Content 11
Page Content 12
Page Content 2
Page Content 3
Page Content 4
Page Content 5
Page Content 13
Page Content 14
Page Content 15
Page Content 16

AltStyle によって変換されたページ (->オリジナル) /