-
Notifications
You must be signed in to change notification settings - Fork 0
[DOCS-03] Publish telemetry, location, event, webhook, and usage guides #4
Open
Description
Background
CoreLink is managed as one product across multiple implementation repositories. This work is the executable feature owned by developer-docs under EPIC-04.
Problem
The telemetry/location/event/webhook/usage documentation depends on several contract slices, but the backlog previously modeled this only as API-02 through API-04 and left downstream outcomes unresolved.
Goal
Publish versioned telemetry, location, event, webhook and usage guides that are runnable against supported contract revisions and accurately reflect accepted product maturity.
Parent
- Primary Product Epic: EPIC-04
- Backlog ID:
DOCS-03
Scope
- Publish supported telemetry/location ingestion and query journeys.
- Publish event/webhook delivery, retry/replay and failure semantics.
- Publish usage/reconciliation behavior required by supported developer journeys.
- Reconcile examples and claims with accepted API revisions and maturity state.
- Retain documentation validation evidence suitable for Partner Platform/Beta gates.
Out of Scope
- Publishing draft or internal behavior as a stable supported API.
- Treating documentation CI alone as Product Acceptance.
- Creating a separate repository roadmap.
Acceptance Criteria
- Each guide identifies the exact supported API/tool version or maturity state it targets.
- Telemetry/location examples are runnable and align with accepted canonical semantics.
- Event/webhook guides document signatures, retries, replay/failure behavior and relevant security boundaries.
- Usage guides align with accepted usage/reconciliation semantics and do not overstate billing maturity.
- Links, examples and version claims pass documentation validation.
- Retained evidence is linked and EPIC-04/EPIC-05 documentation exit criteria are measurably advanced.
Dependencies and acceptance state
- Active contract prerequisites: API-02 telemetry/location contracts, API-03 partner/event/webhook contracts, and API-04 schema/event contracts must provide version-identifiable supported slices before corresponding guides are promoted as supported.
- Execution may proceed incrementally: guide structure and clearly marked draft/scaffold content may advance before all contract slices are Product Accepted, provided maturity is explicit.
- Blocks: Partner Platform developer documentation acceptance, downstream runnable examples, DOCS-05 documentation-quality validation, and release-readiness claims that depend on these guides.
- Current dependency state: See the CoreLink Product organization Project.
Planning Metadata
- Type: Feature
- Priority snapshot: P0
- Product milestone snapshot: Partner Platform
- Domain snapshots: docs, telemetry
- Area snapshot: documentation
- Complexity: L
- Created in status: Triage
- Current status and DRI: See the CoreLink Product organization Project.
- Intended repository labels:
type:feature
Definition of Done
- Acceptance criteria demonstrated.
- Supported claims map to accepted/version-identifiable contract slices.
- Required documentation checks pass on the accepted revision.
- Security/tenant-sensitive behavior is reviewed.
- Examples are runnable or explicitly classified as draft/scaffold.
- Documentation/release maturity notes are reconciled.
- Pull request(s) and retained evidence are linked.